Loading...
HomeMy WebLinkAbout1_G002 - NCSBC APPENDIX B - BUILDING CODE SUMMARY.pdfSpecial Uses:402 403 404 405 406 407 408 409 410 411 412 414 415 416 417 418 419 420 421 422 423 424413 426 427425 Special Provisions:509.2 509.3 509.4 509.5 509.6 509.7 509.8 509.9 Mixed Occupancy:No Yes Separation: Hr. Exception: Incidental Use Separation (508.2.5) This separation is not exempt as a Non-Separated Use (see exceptions). Non-Separated Use (508.3) The required type of construction for the building shall be determined by applying the height and area limitations for each of the applicable occupancies to the entire building. The most restrictive type of construction, so determined, shall apply to the entire building. Separated Use (508.4) - See below for area calculations For each story, the area of the occupancy shall be such that the sum of the ratios of the actual floor area of each use divided by the allowable floor area for each use shall not exceed 1. Actual Area of Occupancy A Allowable Area of Occupancy A + Actual Area of Occupancy B Allowable Area of Occupancy B < 1 +=< 1.00 STORY NO. DESCRIPTION AND USE (A) BLDG AREA PER STORY (ACTUAL) (C) AREA FOR FRONTAGE INCREASE1 (D) AREA FOR SPRINKLER INCREASE2 (E) ALLOWABLE AREA OR UNLIMITED3 (F) MAXIMUM BUILDING AREA4 (B) TABLE 503 AREA 5 1.00 X 100 200 100 200 Occupancy: ALLOWABLE AREA Assembly Business Educational Factory Hazardous Institutional I-3 Condition Mercantile Residential Storage Utility and Miscellaneous A-1 A-2 A-3 A-4 A-5 F-1 Moderate F-2 Low H-1 Detonate H-2 Deflagrate H-3 Combust H-4 Health H-5 HPM I-1 I-2 I-3 I-4 12345 R-1 R-2 R-3 R-4 S-1 Moderate S-2 Low High Piled Parking Garage Open Repair GarageEnclosed Accessory Occupancies: Assembly Business Educational Factory Hazardous Institutional I-3 Condition Mercantile Residential Storage Utility and Miscellaneous A-1 A-2 A-3 A-4 A-5 F-1 Moderate F-2 Low H-1 Detonate H-2 Deflagrate H-3 Combust H-4 Health I-1 I-2 I-3 I-4 12345 R-1 R-2 R-3 R-4 S-1 Moderate S-2 Low High Piled Parking Garage Open Repair GarageEnclosed H-5 HPM Incidental Uses (Table 508.2.5) : Furnace room where any piece of equipment is over 400,000 Btu per hour input Rooms with boilers where the largest piece of equipment is over 15 psi and 10 horsepower Refrigerant machine room Hydrogen cutoff rooms, not classified as Group H Incinerator rooms Paint shops, not classified as Group H, located in occupancies other than Group F Laboratories and vocational shops, not classified as Group H. located in a Group E or I-2 occupancy Laundry rooms over 100 square feet Group I-3 cells equipped with padded surfaces Group I-2 waste and linen collection rooms Waste and linen collection rooms over 100 square feet Stationary storage battery systems having a liquid electrolyte capacity of more than 50 gallons, or a lithium-ion capacity of 1,000 pounds used for facility standby power, emergency power or uninterrupted power supplies Rooms containing fire pumps Group I-2 storage rooms over 100 square feet Group I-2 commercial kitchens Group I-2 laundries equal to or less than 100 square feet Group I-2 rooms or spaces that contain fuel-fired heating equipment X X X 2012 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS Name of Project: Address:Zip Code: Proposed Use: Owner/Authorized Agent: Phone: E-Mail: Owned By: City/County Private State Code Enforcement Jurisdiction: City: County: State LEAD DESIGN PROFESSIONAL: DESIGNER Architectural Civil Electrical Fire Alarm Plumbing Mechanical Sprinkler-Standpipe Structural Retaining Walls>5' High Other FIRM NAME LICENSE # TELEPHONE E-MAIL 2012 EDITION OF CODE FOR:New Construction Addition Upfit Alteration Repair RenovationEXISTING:Reconstruction CONSTRUCTED:(date) RENOVATED:(date) ORIGINAL USE(S)(Ch. 3) : CURRENT USE(S)(Ch. 3) : PROPOSED USE(S)(Ch. 3) : BASIC BUILDING DATA Construction Type: (check all that apply) I-A V-AIV-AIII-AII-A I-B V-BIII-BII-B Sprinklers:No Partial Yes NFPA 13 NFPA 13R NFPA 13D Standpipes:No Yes Class I II III Wet Dry Fire District:No Yes (Primary)Flood Hazard Area:No Yes Building Height: (feet) Gross Building Area: FLOOR EXISTING (SF) NEW (SF) SUB-TOTAL (SF) TOTAL (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) 120,505 SF MACNIDER HALL 3RD FLOOR RENOVATIONS MACNIDER HALL, UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL 27599 BUSINESS LUKE O. HOFF, PE LHOFF@FAC.UNC.EDU X BJAC PA Jennifer Amster 7475 919-645-3216 jennifer@bjac.com N/A Sigma Sigma Sigma N/A N/A N/A X X 1950 UNKNOWN LAB, OFFICE OFFICE LAB, OFFICE X X X XX 69'-0" 120,505 SF 0 SF X ALLOWABLE HEIGHT ALLOWABLE (TABLE 503) Type of Construction Building Height in Feet Building Height in Stories INCREASE FOR SPRINKLERS SHOWN ON PLANS CODE REFERENCE Type Feet = H + 20' = Stories + 1 = I-B 160' - 0" 11 160' - 0" 11 I-B 69' - 0" 6 TABLE 503 TABLE 503 TABLE 503 Frontage area increase from Section 506.2 are computed thus: Unlimited area applicable under conditions of Sections Group B, F, M, S, A-4 (507); Group A motion picture (507.10); Malls (402.6); and H-2 Aircraft Hangers (507.8) Maximum Building Area = total number of stories in the building x E (506.4) The maximum area of parking garages must comply with 406.3.5. The maximum area of air traffic control towers must comply with 412.1.2. The Sprinkler increase per Section 506.3 is as follows: 1 2 3 4 5 a. Multi-story building Is = 200 % = 7.5 b. Single-story building Is = 300 % = 5 c. Ratio (F/P) = 1 (F/P) e. Percent of frontage increase I = 100 [F/P -0.25] x W/30 = 2.5 (%) a. Perimeter which fronts a public way or open space having 20 feet minimum width = 1 (F)b. Total Building Perimeter = 1 (P) d. W = Minimum width of public way = 1 (W) FIRE PROTECTION REQUIREMENTS BUILDING ELEMENT FIRE SEPARATION DISTANCE (FEET) RATING REQ'D PROVIDED (W/ * REDUCTION) DETAIL # AND SHEET # DESIGN # FOR RATED ASSEMBLY DESIGN # FOR RATED PENETRATION DESIGN # FOR RATED JOINTS Structural Frame, including columns, girders, trusses Bearing Walls Exterior North East West South Interior Nonbearing Walls and Partitions Exterior Walls North East West South Interior Walls and Partitions Floor Construction Including Supporting Beams and Joists Roof Construction Including Supporting Beams and Joists Shaft Enclosures - Exit Shaft Enclosures - Other Corridor Separation Occupancy Separation Party/Fire Wall Separation Smoke Barrier Separation Tenant Separation Incidental Use Separation * Indicate section number permitting reduction 2 EXISTING 2 EXISTING NA NA NA NA 2 EXISTING NA NA NA NA 00 2 EXISTING 1 EXISTING 2 EXISTING 2 EXISTING 0* N/A 1 EXISTING Emergency Lighting: LIFE SAFETY SYSTEM REQUIREMENTS No Yes Exit Signs: No Yes Fire Alarm: No Yes Smoke Detection Systems: No Yes Panic Hardware: No Yes Partial X X X X X LIFE SAFETY PLAN REQUIREMENTS Life Safety Plan Sheet #: Fire and/or smoke rated wall locations (Chapter 7) Assumed and real property line locations Exterior wall opening area with respect to distance to assumed property lines (705.8) Existing structures within 30’ of the proposed building Occupancy types for each area as it relates to occupant load calculation (Table 1004.1.1) Occupant loads for each area Exit access travel distances (1016) Common path of travel distances (1014.3 & 1028.8) Dead end lengths (1018.4) Clear exit widths for each exit door Maximum calculated occupant load capacity each exit door can accommodate based on egress width (1005.1) Actual occupant load for each exit door A separate schematic plan indicating where fire rated floor/ceiling and/or roof structure is provided for purposes of occupancy separation Location of doors with panic hardware (1008.1.10) Location of doors with delayed egress locks and the amount of delay (1008.1.9.7) Location of doors with electromagnetic egress locks (1008.1.9.8) Location of doors equipped with hold-open devices Location of emergency escape windows (1029) The square footage of each fire area (902) The square footage of each smoke compartment (407.4) Note any code exceptions or table notes that may have been utilized regarding the items above G101 X X X X X X X X X X X ACCESSIBLE DWELLING UNITS (SECTION 1107) TOTAL UNITS ACCESSIBLE UNITS REQUIRED ACCESSIBLE UNITS PROVIDED TYPE A UNITS PROVIDED TYPE B UNITS REQUIRED TYPE B UNITS PROVIDED TOTAL ACCESSIBLE UNITS PROVIDED TYPE A UNITS REQUIRED ACCESSIBLE PARKING (SECTION 1106) LOT OR PARKING AREA TOTAL # OF PARKING SPACES REQUIRED PROVIDED # OF ACCESSIBLE SPACES PROVIDED REGULAR WITH 5' ACCESS AISLE VAN SPACES WITH 132" ACCESS AISLE 8' ACCESS AISLE TOTAL # ACCESSIBLE PROVIDED 000000 TOTAL 0 0 0 0 0 0 DESIGN LOADS: STRUCTURAL DESIGN Importance Factors:Wind (I ) Snow (I ) Seismic (I ) W S E Live Loads:Roof Mezzanine Floor psf psf psf Ground Snow Load:psf Wind Load:Basic Wind Speed Exposure Category Wind Base Shears (for MWFRS) mph (ASCE-7) Vx = Vy = SEISMIC DESIGN CATEGORY: Provide the following Seismic Design Parameters: ABCD Occupancy Category (Table 1604.5) I II III IV Spectral Response Acceleration SS %g S I %g Site Classification (Table 1613.5.2) A B C D E F Data Source: Field Test Presumptive Historical Data Basic Structural System (check one) Bearing Wall Building Frame Moment Frame Dual w/ Special Moment Frame Dual w/ Intermediate R/C or Special Steel Inverted Pendulum Seismic Base Shear:Vx = Vy = Analysis Procedure:Simplified Equivalent Lateral Force Dynamic Architectural, Mechanical Components Anchored?:Yes No LATERAL DESIGN CONTROL:Earthquake Wind SOIL BEARING CAPACITIES: Field Test (provide copy of test report) Presumptive Bearing Capacity Pile Size, Type, and Capacity psf psf SPECIAL INSPECTIONS REQUIRED:Yes No PLUMBING FIXTURE REQUIREMENTS (TABLE 2902.1) USE WATERCLOSETS MALE FEMALE URINALS LAVATORIES MALE FEMALE REGULAR ACCESSIBLE SHOWERS/ TUBS DRINKING FOUNTAINS EXISTING NEW REQUIRED SPACE Special Approval: (Local Jurisdiction, Department of Insurance, OSC, DPI, DHHS, ICC, etc., describe below) SPECIAL APPROVALS OFFICE OF STATE CONSTRUCTION ENERGY REQUIREMENTS: ENERGY SUMMARY The following data shall be considered minimum and any special attribute required to meet the energy code shall also be provided. Each Designer shall furnish the required portions of the project information for the plan data sheet. If performance method, state the annual energy cost for the standard reference design vs annual energy cost for the proposed design. Climate Zone:345 Method of Complaine: Prescriptive (Energy Code) Performance (Energy Code) Prescriptive (ASHRAE 90.1) Performance (ASHRAE 90.1) THERMAL ENVELOPE Roof/Ceiling Assembly (each assembly) Description of Assembly: U-Value of Assembly: R-Value of Insulation: Skylights in Each Assembly: U-Value of Skylight: Total Square Footage of Skylights in Each Assembly: Exterior Walls (each assembly) Description of Assembly: U-Value of Assembly: R-Value of Insulation: Openings (Windows or Doors With Glazing U-Value of Assembly: Solar Heat Gain Coefficient: Projection Factor: Door R-Value: Walls Below Grade (each assembly) Description of Assembly: U-Value of Assembly: R-Value of Insulation: Floors Over Unconditioned Space (each assembly) Description of Assembly: U-Value of Assembly: R-Value of Insulation: Floors Slab On Grade Description of Assembly: U-Value of Total Assembly: R-Value of Insulation: Horizontal/Vertical Requirement: Slab Heated: MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENT MECHANICAL SUMMARY Thermal Zone Winter Dry Bulb: Summer Dry Bulb: Interior Design Conditions Winter Dry Bulb: Summer Dry Bulb: Relative Humidity: Building Heating Load: Building Cooling Load: Mechanical Spacing Conditioning System Unitary Description of Unit Heating Efficiency: Cooling Efficiency Size Category of Unit: Boiler Size Category. If oversized, state reason: Chiller Size Category. If oversized, state reason: List Equipment Efficiencies: ELECTRICAL SYSTEM AND EQUIPMENT ELECTRICAL SUMMARY Method of Compliance: Energy Code: ASHRAE 90.1: Prescriptive Performance Prescriptive Performance Lighting Schedule (each fixture type) lamp type required in fixture number of lamps in fixture ballast type used in the fixture number of ballasts in fixture total wattage per fixture total interior wattage specified vs. allowed (whole building or space by space) total exterior wattage specified vs. allowed Additional Prescriptive Compliance 506.2.1 More Efficient Mechanical Equipment 506.2.2 Reduced Lighting Power Density 506.2.3 Energy Recovery Ventilation Systems 506.2.4 Higher Efficiency Service Water Heating 506.2.5 On-Site Supply of Renewable Energy 506.2.6 Automatic Daylighting Control Systems 22,530 SF4TH 22,530 SF 0 SF 22,530 SF3RD 22,530 SF 0 SF 22,530 SF2ND 22,530 SF 0 SF 22,530 SF1ST 22,530 SF 0 SF 22,530 SFGROUND 22,530 SF 0 SF 7,855 SFBASEMENT 7,855 SF 0 SF CORRIDOR RATING NOT REQUIRED IN SINGLE TENANT BUILDING PER NC BUILDING CODE TABLE 1018.1 FOOTNOTE 'F' BUSINESS OCCUPANCY C CERT. NO. 50699 N.C .N O ITAROP R O C L A RUTCETIHRAC DE E R G T S I ER JB A P.A. R LAEIG H ,N .C . , ANILORACHT R O N I C .N .H ,GELAR REGI S T E R E AR C H I T E CT D 7475 J EN N I F E R R . A M S T E R PROJECT NUMBER SHEET NUMBER SHEET TITLE DRAWN BY ISSUE DATE REVISIONS PRELIMINARY CHECKED BY BJ A C , P A D O N O T S C A LE D R A W I N G S N O T  F O R  C O N S T R U C T I O N 811 W. Hargett St.,   Raleigh, NC 27603 919.833.8818 v   919.833.6898 f            www.bjac.com c Chapel Hill, NC 27599 G002 NCSBC APPENDIX B - BUILDING CODE SUMMARY University of North Carolina at Chapel Hill Macnider Hall 3rd Floor Renovations 7667-01 06/18/2012 Author Checker MARK DATE DESCRIPTION