Loading...
HomeMy WebLinkAbout10761-60_UNC-NRB_Final Report.pdf 1450 Raleigh Road, Suite 109 Chapel Hill, NC 27517 877-929-1400 lordaecksargent.com Mr. Kyle Coble March 3, 2021 Construction Manager UNC Facilities Planning & Design, Giles F. Horney Building 103 Airport Drive Chapel Hill, NC 27599-1800 Project: LAS #10761-60 UNC School of Medicine, Neurosciences Research Building (NRB) 7th & 8th Floor Renovations State ID #11-09861-02G Re: Project Closeout – Final Report Dear Mr. Coble, We are pleased to submit the Final Report and Record Documents for the project. The Report is structured per the Chapter 600 requirements of the 2009 NC State Construction Manual. We enjoyed working with you, UNC, and the School of Medicine on the project and appreciate all of the assistance that you provided. Sincerely, Craig A. Carbrey, AIA Senior Associate Project Manager Attachments: Final Report Designer Certification Documents Contractor Closeout Documents Design Team Record Documents Copy: Lauren Rockart – LAS Project Team – Kramer Engineering Services File: K:\PROJECTS\10761-00\CORRESPONDENCE\10761-60_UNC-NRB_Final Report_Cover Letter.docx 1450 Raleigh Road, Suite 109 Chapel Hill, NC 27517 877-929-1400 lordaecksargent.com LAS #10761-60 UNC School of Medicine, Neurosciences Research Building (NRB) 7th & 8th Floor Renovations State ID #11-09861-02G FINAL REPORT TABLE OF CONTENTS CONTRACT DATES .......................................................................................................................................... Page 2 EXHIBIT A – PROJECT DESCRIPTION ................................................................................................................................ Page 2 EXHIBIT B – PROJECT COST DATA ..................................................................................................................................... Page 4 EXHIBIT C – CHANGE ORDERS .......................................................................................................................................... Page 4 EXHIBIT D – NAMES AND ADDRESSES OF CONTRACTOR AND PRIMARY SUBCONTRACTORS ................................ Page 5 EXHIBIT E – ENERGY CRITERIA ......................................................................................................................................... Page 6 EXHIBIT F – DESIGNER CERTIFICATION DOCUMENTS ................................................................................................... Page 7 EXHIBIT G – CONSTRUCTION CLOSEOUT DOCUMENTS ................................................................................................ Page 7 ATTACHMENTS .......................................................................................................................... Following this Report LAS #10761-60 UNC School of Medicine. Neurosciences Research Building (NRB), 7th & 8th Floor Renovations Page 2 LAS #10761-60 UNC School of Medicine, Neurosciences Research Building (NRB), 7th & 8th Floor Renovations State ID #11-09861-02G The Project Information is as follows: CONTRACT DATES Bid Opening Date November 14, 2019 Award Date Notice to Proceed for Contractor December 12, 2019 February 13, 2020 Begin Work Date February 17, 2020 Final Inspection Date October 27, 2020 Project Acceptance Date October 27, 2020 Warranty Expiration Date October 27, 2021 EXHIBIT A – PROJECT DESCRIPTION Project Address: Neurosciences Research Building, 115 Mason Farm Road, Chapel Hill, North Carolina 27599-7250 *Project is part of the Mary Ellen Jones (MEJ) Renovation funding authority. The Project consists of the limited alteration on the 7th and 8th Floors of the existing Neurosciences Research Building (NRB) at the UNC-Chapel Hill School of Medicine (SOM). The existing building is circa 2001. The purpose of the project is to refresh existing finishes and reconfigure existing spaces in the building to accommodate the relocation of lab spaces and associated equipment for the Department of Dermatology from another building at the SOM. The circulation/egress path on the floor is existing to remain. Existing exits and corridors within the work area are shared by only one tenant and the new work does not impact egress. Additional detailed descriptions of specific project components are as follows: Architectural Interior 1. The work was designed in accordance with the 2018 NC Existing Building Code for Level II Alterations. 2. The existing building is Type I-A Construction, “B” Occupancy, and is fully-sprinklered with an NFPA 13 System. The sprinkler system was modified as required for the new work. 3. The existing building is approximately 12,100 SF per floor. Approximately 6,600SF per floor is included in the areas of work. 4. Limited work on the existing 3rd Floor was performed by UNC Shops as a separate project. The work consisted of limited demolition, repair of existing surfaces, and installation of new finishes. The renovated spaces on the 3rd Floor are used as new offices for Dermatology. 5. The scope of work for the primary program spaces on the 7th and 8th Floors consists of the following: a. Lab Spaces: new power and optional standby power as required for equipment, replacement of existing lab countertops with new epoxy resin tops, new sinks and fittings at lab benches, paint existing walls, replace damaged ceiling tiles, clean floors. b. Equipment Rooms: new power and optional standby power as required for equipment, new mechanical systems for supplemental cooling, paint existing walls, clean/replace floors. LAS #10761-60 UNC School of Medicine. Neurosciences Research Building (NRB), 7th & 8th Floor Renovations Page 3 c. Research Spaces: new power and optional standby power as required for equipment, new lab casework, new ceiling tiles, paint existing walls, clean/replace floors, new emergency showers were added either in research spaces or adjacent corridors. d. Shared Office Space and Private Offices: renovation of existing offices and addition of new walls for new offices, paint walls, new carpet tiles, replace damaged ceiling tiles at existing offices and install new ceiling tiles at new offices. e. Break Rooms: new casework and sink, new water connections for coffee maker and refrigerator, paint walls, clean/replace floors. f. Bathrooms: clean floors, install new ADA-compliant auto door operators, new auto flush valves at ADA stalls, new vertical grab bars at ADA stalls. g. Corridors: clean floors, paint walls, replace damaged ceiling tiles, provide ADA-compliant water coolers. New ADA compliant emergency showers were added at corridors, to support adjacent Lab and Research spaces. 6. Interior Demolition in areas of work included: removal of existing millwork, removal of interior (non-load- bearing) partitions, removal of interior doors and frames, partial demo of existing CMU walls for installation of new doors and frames, removal of existing ceilings and light fixtures, and removal of existing floor finishes, removal of mechanical components to prep for new work, removal of electrical systems and components to prep for new work. 7. New interior work included: new metal-framed partitions and drywall, new paint, patch/repair of existing acoustical ceiling tiles and installation of new acoustical ceiling tiles, new carpet tile flooring, new resilient flooring, new hollow metal frames, new doors and hardware, new millwork, new lab casework and lab fittings, new toilet accessories, and preparation and repair of existing surfaces (to remain) that were impacted by new work. Exterior 1. This project consisted of interior renovations only. No modifications were made to the exterior as part of this project. Structural Foundations 1. This project consisted of interior renovations only. No modifications were made to the existing foundations as part of this project. Super Structure 2. No modifications were made to the existing super structure as part of this project. Fire Protection 1. Replaced sprinkler heads and modified branch piping as needed to accommodate the new plan layout, new ceiling heights and finishes, lights, and other ceiling-mounted devices. 2. Pendant and upright sprinklers were installed. 3. The installation was in accordance with NFPA 13 Ordinary Hazard Group 1, occupancy classification. Plumbing 1. Modifications to existing plumbing system to accommodate the new program. 2. Extended cold water to valve boxes for a coffee makers and refrigerator connections. 3. Selective demolition of some lab sinks, lab gas outlets and associated piping was completed. 4. Several new lab sinks, break room sinks, and emergency fixtures were installed. 5. Air and vacuum piping was extended to biosafety cabinets. 6. CO2 gas piping was extended between gas cylinders and CO2 incubators. Switching manifolds were installed at cylinder locations. HVAC 1. Existing terminal reheat boxes, air valves, and controls remained. 2. Distribution ductwork, downstream of terminal reheat boxes, was modified in some areas to accommodate new ceilings. LAS #10761-60 UNC School of Medicine. Neurosciences Research Building (NRB), 7th & 8th Floor Renovations Page 4 3. Exhaust hoods were installed above tissue processors and stainers in the Grossing Lab. 4. The fume hood in the Grossing lab was removed and the dedicated fume hood exhaust was re- purposed for the grossing stations. 5. An existing fume hood riser and fan which provided general exhaust was connected to a new fume hood in the Procedure Room. 6. Supplemental cooling units utilizing building process chilled water were installed in equipment rooms with high cooling loads. 7. All 7th and 8th floor spaces were rebalanced and controls were recalibrated. Electrical 1. Electrical work involved the renovation of various spaces on the 7th and 8th floors. To the greatest extent possible the existing lighting, normal power and telecom serving these spaces remained as is. An admin area on each floor was mostly renovated including new lighting. 2. Normal Power - The existing normal power system remained with a dedicated panel in each lab space. 3. Optional Standby Power – The optional standby power system for the renovated spaces was reworked such that many lab spaces received a dedicated 120/208V panel, located in the corridor. The system predominantly serves refrigeration and other lab equipment. This allows these and other spaces to have circuits added and reworked in the future without the need for shutting down or affecting other rooms. A new 75kVA dry type transformer and associated 120/208V, 250A distribution panel for serving these panels was located on each floor. Metering was provided at each distribution panel such that future addition to the system can be more easily determined. 4. Emergency Power – Due to the fact that the existing system was a hybrid emergency/optional standby power system, and present codes require separation of emergency and optional standby power, a new separate emergency power infrastructure system was provided. The system consists of a new emergency ATS (automatic transfer switch), and panel to serve emergency lights and other required emergency loads. 5. Lighting – For the most part existing lighting remained. Where new lighting is required dimmable LED troffers have been provided. 6. Fire Alarm – Minor alterations to the existing fire alarm system were made to adapt to the renovation. 7. Telecommunication – For the most part the existing voice/data telecom system remained. Where required a system of hardwired telecom outlets and wireless access points have been provided for the voice/data telecom system. The system consists of outlets served by conduit from the outlet to a cable tray in the corridor. EXHIBIT B – PROJECT COST DATA Contracts1 Original Contract Fee Change Orders/Amendments Subtotal General Construction $1,576,600.00 $161,584.27 $1,738,184.27 Design Contract – Planning & Programming $19,690.00 $0 $19,690.00 Design Contract – Const Documents & CA $180,260.00 $61,900.00 $242,160.00 LAS #10761-60 UNC School of Medicine. Neurosciences Research Building (NRB), 7th & 8th Floor Renovations Page 5 Total Contract $1,776,550.00 $223,484.27 $2,000,034.27 1The NRB Renovation is part of the Mary Ellen Jones (MEJ) Renovation enabling projects, and project funding is through MEJ. The Contract Amounts indicated in the Project Cost Data are specific to NRB and do not account for other MEJ project totals. EXHIBIT C – CHANGE ORDERS UNC Change Order (CO) Number Change Order Proposals (COP) Included in CO Description Amount Change Order #1 001 Demo & replace existing flooring in office area $9,129.00 002 Provide Electrical Add Alternates 3 and 4 $47,400.00 003 Demo wall above existing ceiling $1,702.00 004R2 Install mixing valves at eyewashes $8,919.00 005 Door height price adjustment $2,012.27 006-1 Flooring repair $2,539.00 007 Provide and install LCN closers $37,358.00 008 Remove existing steel beams from 7104, 8104, 8122, and 8122A $2,304.00 009 Plumbing revisions per PR-008 $3,519.00 010 User Group changes per PR-005 $9,882.00 011R HVAC changes per PR-007 $11,077.00 012 Additional shelving supports $1,743.00 013 Stainless steel sink at 8th Floor Break Room $716.00 014 VCT infill and VCT Flooring replacement $2,278.00 015 Electrical Changes per PR-011 $5,178.00 Total CO#1 $145,756.27 Change Order #2 016 Sprinkler changes per PR-014 $2,231.00 017 Additional fire alarm work per PR-009 $731.00 018 Deduct Change Order per PR-012 ($948.00) LAS #10761-60 UNC School of Medicine. Neurosciences Research Building (NRB), 7th & 8th Floor Renovations Page 6 019 Additional labor and materials per PR-013 $936.00 020R Resin top and sink in Room 8117 $5,485.00 021R Third Party UL Labeling of Grossing Stations $5,848.00 022 Re-work ceilings at electrical panel locations $1,545.00 Total CO#2 $15,828.00 Total - All CO’s $161,584.27 EXHIBIT D – NAMES AND ADDRESSES OF CONTRACTOR AND PRIMARY SUBCONTRACTORS General Contractor: H.M. Kern Corporation 160 Thatcher Road Greensboro, NC 27409 Subcontract or Material Name of Contractor or Supplier Address Demolition Subcontractor 360 Services and Demolition 206 Waycross Road Fayetteville, NC 28312 Millwork Subcontractor AMG Casework 10315 Chapel Hill Road Morrisville, NC 27560 Lab Casework and Lab Equipment Subcontractor Nycom, Inc. 606 Church Street, Suite 101 Morrisville, NC 27560 Doors, Frames & Hardware Supplier Schiller 4500 Green Point Dr., Suite 105 Greensboro, NC 27410 Auto Door Operators Jacobs Glass Company 4915 Hillsborough Road Durham, NC27705 Glass and Glazing DGC Glass Systems, LLC 5025 Departure Drive, Suite 103 Raleigh, NC 27616 Framing, Drywall & Insulation Subcontractor White’s Metal Stud & Drywall 3450 Gum Springs Church Road Pittsboro, NC 27312 Ceilings Trinity Custom Interiors PO Box 1987 Fuquay Varina, NC 27526 Flooring Subcontractor Brock Contract Services 1400 Nowell Rd. Raleigh, NC 27607 Painting Subcontractor E. Caligari & Son, Inc. 1333 Ingleside Road Norfolk, VA 23502 Mechanical (HVAC) Contractor: Arnold Service Company 820 Person Street Fayetteville, NC 28301 Electrical Contractor: LAS #10761-60 UNC School of Medicine. Neurosciences Research Building (NRB), 7th & 8th Floor Renovations Page 7 JC Electric, Inc. 3430 Coates Industrial Blvd, Suite 100 Durham, NC 27705 Plumbing Contractor: Hockaday Mechanical Corporation 3717 Auburn Church Road Garner, NC 27529 Sprinkler/Fire Protection Contractor: Sunland Fire Protection, Inc. 1218 Elon Place High Point, NC 27263 EXHIBIT E – ENERGY CRITERIA The building is existing to remain and the scope of the work is primarily interior improvements. Per NC Energy Code Section 101.4.1: existing systems that were lawfully in existence prior to the renovation can remain. New components added to the building, including Mechanical and Electrical system modifications, were installed per the requirements of the 2018 NC Energy Conservation Code using the Prescriptive Performance Method. Sheet G031 of the Record Documents Package outlines additional information pertaining to the Energy Summary. EXHIBIT F – DESIGNER CERTIFICATION DOCUMENTS a. SCO Certificate of Completion: executed copy included with Attachments b. SCO Certificate of Compliance: executed copy included with Attachments EXHIBIT G – CONSTRUCTION CLOSEOUT DOCUMENTS a. Contractor’s Affidavit of Release of Liens: executed copy included with Attachments b. Contractor’s Affidavit of Payment of Debts and Claims: executed copy included with Attachments c. Final Pay Application which includes the Final MBE Documentation: executed copy included with Attachments ATTACHMENTS Copies of the following documents are attached, after Page 8 of the Report. SCO Certificate of Completion SCO Certificate of Compliance HM Kern Corporation Hold Harmless and Warranty Documents from HM Kern Corporation Final Pay Application which includes the Final MBE Documentation Record Documents - Project Specifications Record Documents - Project Drawings (As-Built) Copy: LAS Project Team Kramer Engineering Services LAS #10761-60 UNC School of Medicine. Neurosciences Research Building (NRB), 7th & 8th Floor Renovations Page 8 File: K:\PROJECTS\10761-00\CCA\CloseOut\10761-60_UNC-NRB_Final Report.docx March 2009 SECTION 324 SCO CERTIFICATE OF COMPLIANCE; PROJECT: UNC School of Medicine, Neurosciences Research Building (NRB), Renovations to the 7th and 8th Floors LOCATION: UNC Chapel Hill, School of Medicine 115 Mason Farm Road, Campus Box 7250, Chapel Hill, NC 27599-7250 BUDGET CODE: ITEM: SCO PROJECT ID: 11-09861-02G OWNER: The State of North Carolina through the University of North Carolina at Chapel Hill TYPE OF CONTRACT: General Contract FINAL AMOUNT: $1,738,184.27 DATE OF FINAL ACCEPTANCE: October 27, 2020 CONTRACTOR: H.M. Kern Corporation I (we) certify that the work on the above-referenced project has been inspected in accordance with Chapter 133, Article 1, of the General Statutes, and that: (1) The inspections of the construction, repairs or installations have been conducted with the degree of care and professional skill and judgment ordinarily exercised by a member of my (our) profession; and (2) to the best of my (our) knowledge, and in my (our) professional opinion as an architect or engineer, the contractor has fulfilled the obligations of such plans, specifications and contract. Signed this 18th day of February_2021. Designer Signature (SEAL) Lauren Dunn Rockart Designer Name Principal Discipline/Title March 2009 SECTION 326 SCO CERTIFICATE OF COMPLETION; PROJECT: UNC School of Medicine, Neurosciences Research Building (NRB), Renovations to the 7th and 8th Floors LOCATION: UNC Chapel Hill, School of Medicine 115 Mason Farm Road, Campus Box 7250, Chapel Hill, NC 27599- 7250 BUDGET CODE: ITEM: SCO PROJECT ID: 11-09861-02G DATE: November 2, 2020 OWNER: The State of North Carolina through the University of North Carolina at Chapel Hill DESIGNER: Lord Aeck Sargent, A Katerra Company, LLC PRIME CONTRACTOR: - CONTRACTOR: H.M. Kern Corporation I (we) certify that all work on the above referenced project has been completed according to the plans, specifications, addenda and approved change orders and that the project is ready for owner occupancy. The final inspection was made on October 27, 2020. The guarantee period begins on October 27, 2020, and shall terminate on October 20, 2021. The contractors report that final payments have been made to all material suppliers, employees and subcontractors, and copies of their lien waivers are attached. Builder's risk insurance was cancelled as of October 28, 2020, and a copy of the cancellation notice is attached hereto. The total time for completion as allowed in the contract plus granted time extensions is two hundred fifteen (215) days. The actual time required for completion was two hundred fifty-three (253) days, and the contractor is not liable for liquidated damages. The contractor(s) has (have) been notified of any proposed assessments of liquidated damages. Copies of each notification and my (our) letter of recommendations as to the amount of liquidated damages are attached. Copies of the following items are attached as indicated below: Written guarantees: March 2009 Affidavits: __________________________________________________________ Contractor’s Affidavit of Release of Liens: Provided Contractor’s Affidavit of Payment of Debts and Claims: Provided _____________________________________________________________ Consent of Surety Company to Final Payment: Provided Final Report: Provided Electronic As-built drawings: Provided Other required closing papers of the contractor: Included with Contractor’s Closeout Attachments ___________________________________________________________ _______ There are no unsettled disputes between the owner and contractor, owner and designer, or the designer and contractor at this time. Signed this 18th day of February_2021. ____________ (SEAL) ____________________ Designer Signature Lauren Dunn Rockart Designer Name Principal Title PROJECT INFORMATION PROJECT UNC School of Medicine – Neurosciences Research Building 7th & 8th Floors for Dermatology SCO #11-009861-02G | UNC CIP #501 115 Mason Farm Road Chapel Hill, NC 27599 GENERAL CONTRACTOR H.M. Kern Corporation HMK Project # 926 160 Thatcher Road Greensboro, NC 27409 (P) 336-668-3213 Akers Hill, ahill@hmkern.com ARCHITECT Lord Aeck Sargent, a Katerra Company, PLLC LAS #10761-00 1450 Raleigh Road, Suite 109 Chapel Hill, NC 27517 (P) 877-929-1400 Craig Carbrey, ccarbrey@lordaecksargent.com ENGINEER Kramer Engineering Services, LLC 5517 Cascade Dr. Chapel Hill, NC 27514 (P) 919-933-3360 Donna Kramer, donna@kespllc.com PROJECT INFORMATION Contract Date: January 9, 2020 Substantial Completion: October 28, 2020 Insurance Cancellation: October 29, 2020 Brief Project Description Renovation of the vacant lab spaces on the 7th floor (6,629 SF) and 8th floor (6,624 SF) of the Neurosciences Research Building to create spaces for the Dermatology Department. School of Medicine – Neurosciences Research Building 7th & 8th Floor SCO #11-009861-02G SUBCONTRACTOR LISTING Company: Address: Phone: Contact: 360 Services and Demolition 206 Waycross Road Fayetteville, NC 28312 910-797-2520 Steve Ludwig, sludwig@360servicesanddemolition.com Scope: Section 024100- Demolition Company: Address: Phone: Contact: AMG Casework 10315 Chapel Hill Road Morrisville, NC 27560 919-462-9203 Valerie Moody, valerie@amgcasework.com Scope: Section 064100- Custom Cabinets and Woodwork Company: Address: Phone: Contact: Arnold Service Company 820 Person Street Fayetteville, NC 28301 910-425-3350 Scott McGowan, scott@ascheatandair.com Scope: Division 23- Heating, Ventilating and Air-Conditioning Company: Address: Phone: Contact: Brock Contract Services PO Box 33415 Raleigh, NC 27636 919-570-1300 Scout Brock, sbrock@brockcontract.com Scope: Section 090561- Preparation of Concrete to Receive Adhesively Installed Flooring Section 096010- Flooring Transitions, as pertaining to 096500 & 096800 Section 096500- Resilient Flooring Section 096800- Carpet Includes Moisture and pH Testing Company: Address: Phone: Contact: E. Caligari & Son, Inc. 1333 Ingleside Road Norfolk, VA 23502 757-853-4511 Jeff Hamele, jeff@cp1896.com Scope: Section 079000- Joint Sealers, as pertaining to 099100 Section 099100- Paints and Coatings School of Medicine – Neurosciences Research Building 7th & 8th Floor SCO #11-009861-02G Company: Address: Phone: Contact: Hockaday Mechanical Corporation PO Box 26685 Raleigh, NC 27611 919-773-2008 Bob Carter, bob@hmcor.com Scope: Division 22- Plumbing Company: Address: Phone: Contact: Jacobs Glass Company 4915 Hillsborough Road Durham, NC 27705 919-383-1120 Paul Walker, paul@jacobsglass.com Scope: Section 084229- Automatic Entrances Company: Address: Phone: Contact: JC Electric, Inc. 4900 Hillsborough Road Durham, NC 27705 919-309-9000 Rick Coates, rickcoates@jcenc.com Scope: Division 26- Electrical Division 27- Communications Division 28- Electronic Safety and Security Company: Address: Phone: Contact: Nycom, Inc. 606 Church Street, Suite 101 Morrisville, NC 27560 919-957-9545 Robert McCullough, rmccullough@nycominc.com Scope: Section 115300- Laboratory Equipment Section 115313- Laboratory Fume Hoods Section 123553- Laboratory Casework Company: Address: Phone: Contact: Sunland Fire Protection, Inc. PO Box 277 Jamestown, NC 27282 336-886-7027 Rick Rye, rick.rye@sunlandfire.us Scope: Division 21- Fire Suppression Company: Address: Phone: Contact: Triangle Maintenance & Janitorial Service 2020 Winston Diamond Ct Raleigh, NC 27610-5775 919-633-9667 Henry Singletary, trimaint@gmail.com Scope: Final Cleaning School of Medicine – Neurosciences Research Building 7th & 8th Floor SCO #11-009861-02G Company: Address: Phone: Contact: Trinity Custom Interiors PO Box 1987 Fuquay Varina, NC 27526 704-985-3742 Nan Salmon, nan@trinitycustominteriors.com Scope: Section 090510- Ceiling Coordination, as pertaining to 095100 Section 095100- Suspended Acoustical Ceiling Company: Address: Phone: Contact: White’s Metal Stud & Drywall 3450 Gum Springs Church Road Pittsboro, NC 27312 919-542-0638 Scott White, whitesdrywallnc@gmail.com Scope: Section 090510- Ceiling Coordination, as pertaining to 090610 & 092116 Section 090610- Partition Schedule Section 092116- Gypsum Board Assemblies SUPPLIER LISTING Company: Address: Phone: Contact: DGC Glass Systems, LLC 5025 Departure Drive, Suite 103 Raleigh, NC 27616 919-500-4700 Matt Radford, mradford@dgcgs.com Scope: Section 088000- Glazing Company: Address: Phone: Contact: Martin Architectural Products, Inc. 511 E Chatham Street Cary, NC 27511 919-469-9661 Vanessa Eason, veason@mapdoors.biz Scope: Toilet Accessories per Contract Documents Toilet Partition Hardware per Contract Documents Company: Address: Phone: Contact: Schiller Architectural Hardware 4500 Green Point Drive, Suite 105 Greensboro, NC 27410 336-234-3747 Jonathan Tudor, jtudor@goschiller.com Scope: Section 081100- Steel Doors and Frames Section 081416- Flush Wood Doors Section 087100- Door Hardware 827 Gum Branch Road Jacksonville, NC 28540 (910) 455-7576 (800) 682-7741 toll free www.siagroup.com October 29, 2020 H.M. Kern Corporation 160 Thatcher Road Greensboro, NC 27409 Owner: University of NC at Chapel Hill 103 Airport Drive Chapel Hill, NC 27599 Project Name: UNC School of Medicine – Neurosciences Research Building – 7th & 8th Floors for Dermatology SCO#11-009861-02G 115 Mason Farm Road Chapel Hill, NC 27599 To Whom It May Concern: Please be advised that SIA Group is the insurance agency for H. M. Kern Corporation. It is our understanding that the above referenced project has a Substantial Completion date of October 28 2020. We are requesting H. M. Kern Corporation report to the Builders Risk insurance carrier that this project has been completed and delivered for occupancy; therefore, coverage will be terminated for this project by the insurance carrier. If you should need anything further, please advise. Thank you. Sincerely, Charlene Heubach Charlene Heubach CPCU AAI AU AINS AIC AU-M APA Account Manager SIA Group 1333 Ingleside Road, Norfolk, VA 23502-1914 Phone: 757-853-4511 Fax: 757-855-9424 Website: www.ecaligariandson.com 10/27/2020 HM Kern Project Name: UNC NRB Location: Chapel Hill, NC Gentlemen: This is to certify that the joint sealer applied directly to UNC NRB Project is hereby guaranteed for a five-year period against bubbling, chipping or peeling. This guarantee is to be in force for a period of one year from the date of substantial completion of building and full material replacement shall be made should this replacement be necessary as a result of a defect in our materials and labor only. This guarantee does not cover damage resulting from settling of building, major building movements, efflorescence, or mechanical or external physical causes or failure of previous paint coatings. The statements herein reflect the complete liability of E. Caligari & Son, Inc. and there are no other warranties expressed or implied. Very truly yours, E. CALIGARI & SON, INC. Richard G. Gerloff President Jeff Hamele Project Manager Schiller Architectural Hardware UNC Neuroscience Bldg 115 Mason Farm Road Chapel Hill, NC,27599 CONTRACTOR: HM Kern Corporation 160 Thatcher Rd Greensboro, North Carolina, United States 27409 ARCHITECT: Lord Aeck Sargent 1450 Raleigh Road Suite 109 Chapel Hill, NC, 27517 Prepared By: Jonathan Tudor Schiller - Greensboro 4500 Green Point Dr, Suite 105 Greensboro, NC, 27410 Date: Revision Date 10.17.2018 LIMITED LIFETIME WARRANTY VTI Architectural Products, Inc. (“VT”) warrants that all flush wood doors manufactured by VT (“Doors”) shall be free from defects in materials and workmanship from the date of purchase from VT, subject to the following terms, conditions, tolerances and exclusions. The owner’s sole and exclusive remedy against VT shall be limited to repair or replacement of Doors determined to be defective or refund of the purchase price of the defective Doors only as determined by VT in its sole discretion. Should any Door become defective after being properly installed, VT will assess each situation and determine on a case-by-case basis whether it will pay any amount to remove, refinish and/or reinstall the Door. However, VT will not be liable for any removal, refinish and/or reinstallation costs when any defect is apparent prior to the original installation of the Door. Inspection of the Doors must be made upo n receipt by owner and any claim must be received by VT within thirty (30) days after discovery of the defect(s). Failure to so notify VT shall fully and completely relieve VT from any obligation under this warranty. VT shall not be liable for any Doors re paired or replaced without its prior written approval. Record this information in case of claims Customer _________________________________________________________________________________ Project _________________________________________________________________________________ Location _________________________________________________________________________________ VT Order # _________________________________________________________________________________ Door Type(s) _________________________________________________________________________________ TOLERANCES 1. Stile, rail and show-through (telegraphing) on doors shall not be considered a defect unless the faces of the door vary from a true plane in excess of 1/100 inch in any three-inch span. 2. Warp shall not be considered a defect unless it exceeds 1/4” in the plane of the door itself. Warp is any distortion in the door itself, and does not refer to the relation of the door to the frame or jamb in which it is hung. For doors 1-3/4” or thicker, warp will not exceed 1/4” in doors 3’-6” x 7’-0” or smaller; nor will it exceed 1/4” in any 3’-6” or 7’-0” section of larger doors. For doors less than 1-3/4” thick, warp will not exceed 1/4” in doors 3’-0” x 7’-0” or smaller. Warp is measured by placing a straightedge on the concave face and determining the maximum distance from straightedge to door face. 3. Action on any claim for warping or for telegraphing may be deferred, at the option of VT, for a period of time not to exceed 12 months from the date of claim, If a door has been installed prior to such claim, the door must remain in the original hung installation during the period of deferment to permit conditioning of the door to humidity and temperature. EXCLUSIONS 1. Unsatisfactory service or appearance caused by failure to follow the “Handling, Job Finishing and Installation Instructions” set forth below. 2. The appearance of field finished doors. 3. The appearance of doors with high gloss, transparent, or opaque finishes; or otherwise unorthodox finishes. 4. Natural variations in the color, texture, character or cut of the wood. 5. The warranty against warp does not apply to the following: Revision Date 10.17.2018 a. Doors with different face materials or veneer grain configurations on opposite sides of the door. b. Doors that are improperly installed or do not swing freely. c. Warp on doors less than 1-3/4” thick but larger than 3’-0” x 7’-0”. d. Appliques on one face of the door only, creating an unbalanced condition. e. Applied mouldings exceeding 3-1/2” wide or covering more than 25% of the door face. 6. This warranty does not cover doors with: a. Cutouts for lights (lites) and/or louvers, any edge of which is nearer than 5” to any edge of the door. b. Cutouts having less than 3-5/16” on non-rated & 20-minute fire doors, and less than 5” on 45-, 60-, and 90-minute fire doors between adjacent cutouts for unit locks, closures, or other hardware cutouts on flush doors; and cutouts having less than 1-1/2” on stile and rail doors and on non-rated SCL core flush doors. 7. Cracking of high pressure decorative laminate faced doors with openings cut by other than the manufacturer or its authorized representative. Radius of 1/4” at corners of openings must be maintained. 8. Door accessories, supplied by the manufacturer, for a period exceeding one year. 9. Doors altered by others. 10. Normal wear and tear, including wear-through of the finish, or deterioration for reasons other than material and workmanship of the door itself. 11. Incompatibility of hardware with a particular door construction. 12. Doors where self-tapping or combination metal/wood screws are used to attach surface-applied hardware. 13. Interior doors used in an exterior application. An exterior opening is defined as an opening that cannot be climate controlled for temperature and/or humidity on both sides. 14. Acoustical doors requiring hardware other than standard locks and hinges. 15. In order not to induce warp or excessive deterioration of your door, avoid using dark stains or paints on the door surfaces exposed to direct sunlight. Doors painted any dark color with exposure to sunlight will not be warranted. 16. Placement quantity or size of knots that are manufactured from any “knotty” species are not covered under the terms of this warranty. 17. Supa Collection or EnVivo Collection Doors. HANDLING, JOB FINISHING AND INSTALLATION INSTRUCTIONS Refer to VT USEFUL JOBSITE brochure online at www.vtindustries.com/ujs. NO OTHER WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, ARE MADE, INCLUDING, BUT NOT LIMITED TO MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE OR NON-INFRINGEMENT. UNDER NO CIRCUMSTANCES SHALL VT BE LIABLE FOR ANY LOSS OR DAMAGE ARISING FROM THE PURCHASE, USE OR INABILITY TO USE ITS PRODUCTS, OR FOR ANY SPECIAL PUNITIVE, INDIRECT, INCIDENTAL, OR CONSEQUENTIAL DAMAGES. NO DEALER, DISTRIBUTOR, FABRICATOR, INSTALLER, AGENT OR EMPLOYEE OF VT HAS THE AUTHORITY TO ADD TO OR MODIFY THE OBLIGATIONS OR LIMITATION OF THIS WARRANTY. THIS WARRANTY SHALL BE INTERPRETED EXCLUSIVELY UNDER THE LAWS OF THE STATE OF IOWA. VT RESERVES THE RIGHT TO REVISE OR TERMINATE THIS WARRANTY AT ANY TIME. ONLY DOORS PURCHASED FROM THE EFFECTIVE DATE OF THIS WARRANTY THROUGH THE DATE OF ANY REVISION OR TERMINATION OF THIS WARRANTY WILL BE COVERED BY THIS WARRANTY. Schiller Architectural Hardware UNC Neuroscience Bldg 115 Mason Farm Road Chapel Hill, NC,27599 CONTRACTOR: HM Kern Corporation 160 Thatcher Rd Greensboro, North Carolina, United States 27409 ARCHITECT: Lord Aeck Sargent 1450 Raleigh Road Suite 109 Chapel Hill, NC, 27517 Prepared By: Jonathan Tudor Schiller - Greensboro 4500 Green Point Dr, Suite 105 Greensboro, NC, 27410 Date: Page 7 of 8 AP R I L 2 0 1 5 Door hardware warranties Commercial Product type Brand Series Warranty period Locks & latches Legge Tubular Latches & Bolts, Night latch, G2, 950, 990MF, 995MF 10 year Schlage A, AL, B250, B500, CL1000, D, ND, Brass padlocks Cylinders & keying Schlage Cylinders (excluding keys)10 year Door furniture Legge 67, 500, 700, 800, 4000, 5300, 5400, 6000, 8000 10 year Schlage 7000, 9000 10 year Entrance handles Legge 1100, 1200 10 year Door controls (Closers, Floor springs & Transom closers) LCN 1461, 1460T/1461T, 4020T ST, 4031, 4031T, 4041XP, 4041XPT 30 year LCN 3130, 6030 15 year Briton 1120, 1130, 2800, 5000, 7500 10 year LCN 4040SME, 4310ME 2 year Door controls (Ancillary hardware) Briton 3000 selectors 10 yearIves7253 Pivot set, COR coordinators, FB40 Auto Flush bolts Glynn Johnson 450 Overhead stops/holders Exit devices Briton 372E, 376E, 377E, 378E, 379E 10 year Von Duprin 22, 2227, 33A, 3327A, 88, 8827, 99, 9927 ALK Alarm kit, EL Electric Latch retraction 1 year General hardware Legge Pull handles & push plates, 13000 Hinge, Special hinge sets, Barrel bolts, Chain bolts, Restrictor chains, Flush bolts, Panic bolts, Indicator bolts, Catches, Handrail suppports, Doorstops & hooks 10 year Schlage Sliding cavity locks, Door stops, Roller catches, Door viewers 10 year AP R I L 2 0 1 5 Allegion (“Company” or “Seller”) warrants its products to be free from defects in material and workmanship for the stated periods above from the date of purchase. The Company will, at its option, repair or replace any products which in the opinion of the Company are found to be defective, provided said products are returned to Allegion, freight prepaid. The Company reserves the right to inspect the installation of defective products before any removal and return of any such products. This warranty excludes deterioration of decorative finishes, unless those finishes are specifically listed in the product warranty. Additional exclusions or conditions applicable to the warranty are as follows: (a) The warranty shall not cover any defect or damage which may be caused or partly caused by or arise through: i) Failure on the part of the Buyer to properly install or maintain any Goods; or ii) Failure on the part of the Buyer to follow any instructions or guidelines provided by the Seller; or iii) Any use of any Goods otherwise than for any application specified on a quote or order form accepted by Seller; or iv) The continued use of any Goods after any defect becomes apparent or would have become apparent to a reasonably prudent operator or user; or v) Fair wear and tear, or any accident or act of God. vi) The warranty shall cease and the Seller shall thereafter in no circumstances be liable under the terms of the warranty if the Goods are repaired, altered or overhauled without the Seller’s consent. vii) In respect of all claims the Seller shall not be liable to compensate the Buyer for any delay in either replacing or repairing the Goods or in properly assessing the Buyer’s claim. (b) For Goods not manufactured by the Seller the warranty shall be the current warranty provided by the manufacturer of Goods, if any, and to the extent that such warranty can be transferred by Seller to Buyer. (c) No other warranties, express or implied, are made with respect to the products or services including, but not limited to, any implied warranty of merchantability or fitness for a particular purpose. This warranty does not exclude, restrict or modify any statutory rights. Allegion shall in no event be liable for any incidental or consequential damages for breach of any warranty. Warranty terms and conditions MI-Line Installation and Service Manual (1003362 Rev. C) Page 8 Section 1 Medical Illumination International, Inc. Limited Warranty This document comprises the general terms of your product’s Limited Warranty. By accepting the shipment of the product, the owner/purchaser agrees to adhere to the warranty terms and conditions expressed herein. Medical Illumination International, Inc. (“Medical Illumination”) Lighting Equipment is warranted against defective material and/or workmanship, excluding normal replacement parts (e.g. sterilizable handles), for a period of three (3) years from the date of shipment. This Limited Warranty applies exclusively to the repair or replacement of parts recognized as defective by Medical Illumination that are in normal use and have not been modified or repaired by unauthorized personnel. This Limited Warranty extends only to the first retail purchaser of a product, and is not transferable or assignable. This warranty supersedes all other guarantees or warranties, expressed or implied. WARRANTY SERVICE & REPAIRS Medical Illumination does not provide (or give any compensation for) outside repair services or field labor. Therefore, in the event of a failure covered under this warranty, please take the following immediate action: 1. Contact Medical Illumination via phone at (818) 838-3025, through our website at http://www.medillum.com, or by facsimile at (818) 838-3725. A. Be prepared to give the model number, serial number, and full description of the failure. B. Our Customer Service department will attempt to solve the problem over the phone. If it becomes necessary to send the product to the factory for repair, you will be provided with a Return Authorization number. Products sent to the factory without a Return Authorization number will not be accepted. 2. It is the retail purchaser’s obligation to arrange for shipment return of a product to the factory for warranty service, which shall be at the retail purchaser’s expense. Carefully package the light component (light head, arm assembly, mount assembly, etc.) and return it, freight prepaid and insured, with the Return Authorization number clearly marked on the outside of the box, to: Medical Illumination 547 Library Street San Fernando, CA 91340 RMA#______ When returning product for repair, damage resulting from inadequate packing is not covered by this warranty. In addition, shipping insurance does not cover damage due to inadequate packing. We recommend that the package be insured against loss or in-transit damage. Medical Illumination cannot be held responsible for in-transit loss or damage. In the event that freight-related damage should occur, Medical Illumination will notify you immediately so that you can file a damage claim with the proper freight carrier. MI-Line Installation and Service Manual (1003362 Rev. C) Page 9 Section 1 Medical Illumination Limited Warranty (cont’d) Within the aforementioned time period of three (3) years from date of shipment, Medical Illumination will evaluate the returned product, repair as appropriate, and ship the product back to you with freight costs prepaid by the Company. In the event that non-warranty damage or failure is discovered, you will be contacted before any repairs are performed. EXCLUSIONS This Limited Warranty does not cover the following: • Any field labor or outside services (electricians, contractors, installation services, routine maintenance or other repair services) • Damage to the product resulting from tampering, accident, abuse, negligence, alteration, or other causes unrelated to problems with material and/or workmanship • Damage due to improper installation, use, cleaning or maintenance, as outlined in the Installation and Service Manual for the product • Labor costs associated with removing, re-packaging for shipment or reinstalling product PRODUCT RETURNS: Please contact the authorized dealer from whom the product was purchased to inquire about a product return. Additional terms and conditions set by the dealer may apply for any returned items. SHIPMENT DAMAGE: If the initial shipment of your purchased product arrived in damaged condition, please leave the packaging and its contents intact and contact Medical Illumination immediately. Disposal of Waste This product must not be disposed of with your other waste. Instead, it is your responsibility to dispose of your waste equipment by handing it over to a designated collection point for the recycling of waste electrical and electronic equipment, or by returning it to Medical Illumination International, Inc for reprocessing. The separate collection and recycling of your waste equipment at the time of disposal will help to conserve natural resources and ensure that it is recycled in a manner that protects human health and the environment. For more information about where you can drop off your waste equipment for recycling, please contact your local city office, your waste disposal service, or your product distributor or retailer. WARRANTY STATEMENT PROJECT NAME: UNC School of Medicine Neurosciences Research Building Renovations to the 7th & 8th Floors SCO ID # 11-09861-02G PROJECT LOCATION: 115 Mason Farm Road, Chapel Hill, NC 27599 EFFECTIVE DATE: 10-27-20 TO WHOM IT MAY CONCERN: PLEASE BE ADVISED THAT WE WERE THE: ELECTRICAL CONTRACTOR FOR THE ABOVE CAPTIONED PROJECT. WE GUARANTEE OUR WORKMANSHIP, EQUIPMENT AND MATERIAL TO BE FREE FROM DEFECTS FOR A PERIOD OF ONE YEAR FROM DATE OF SUBSTANTIAL COMPLETION SHOWN ABOVE. CONTRACTOR'S NAME: JC Electric Inc. CONTRACTOR'S ADDRESS: 3430 Coates Industrial Blvd. Suite 100 Durham, NC 27705 PHONE: 919-309-9000 FAX: 919-309-9927 SIGNED: Rick Coates, Vice President, JC Electric Inc.