HomeMy WebLinkAbout00 91 13 02_ADDENDUM NO 07.pdfUNC-Chapel Hill PERKINS+WILL
Marsico Hall 830123.000
Record Documents 08/15/2017
Code: #40722 Item: #302 File: #07-07092-02A Addendum-07
ADDENDUM NO. 7
00 91 13.07 - 1
SECTION 00 91 13.07 - ADDENDUM NO. 7
PART 1 - GENERAL
1.1 SCOPE
A. This Addendum is issued in connection with revision of plans and
specifications which have been previously issued.
B. When construction is not under contract, all instructions contained herein
shall be reflected in the contract sum and this Addendum will be made a part
of the Contract Documents, if, as, and when a Contract is awarded.
C. This Addendum forms a part of the Contract Documents and modifies the
original Bidding Documents dated 12/03/2010, as noted below. Receipt of
this Addendum and Addenda issued by the Construction Manager at Risk
under separate cover must be individually acknowledged in the space
provided on the Bid Form. Failure to do so may subject the Bidder to
disqualification.
D. This Addendum consists of _202_ pages and _0_ replacement sheets.
1.2 CHANGES TO THE PRIOR ADDENDA
A. None.
1.3 CHANGES TO THE BIDDING REQUIREMENTS
A. None.
1.4 CHANGES TO THE CONDITIONS OF THE CONTRACT
A. None.
1.5 CHANGES TO THE PROJECT SPECIFICATIONS
A. REPLACE Specification Division 08, Section 08 41 13 –Aluminum Framed
Entrances and Storefronts. Revised aluminum frame finish information.
B. REPLACE Specification Division 09, Section 09 51 13 –Acoustical Panel
Ceilings. Items Part 2-Products. Revised and added ceiling panel product
information.
UNC-Chapel Hill PERKINS+WILL
Marsico Hall 830123.000
Record Documents 08/15/2017
Code: #40722 Item: #302 File: #07-07092-02A Addendum-07
ADDENDUM NO. 7
00 91 13.07 - 2
C. REPLACE Specification Division 10, Section 10 51 13 – Metal Lockers. Added
Manufacturer to secton 2.2, products.
D. REPLACE Specification Division 11, Section 11 41 35 – Cold Room Chambers.
Revised section 1.7, project conditions. Revised section 1.9, maintenance
criteria and service requirements. Revised section 2.7, environmental
conditioning system requirements. Added section 2.8, free standing modular
shelving. Revisions to sections 2.11 and 2.12.
E. REPLACE Specification Division 11, Section 11 53 13 – Laboratory Fume
Hoods. Revisions to section 3.5, fume hood sash design.
F. REPLACE Specification Division 12, Section 12 35 53 – Laboratory Casework.
Added to section 1.4, interior laboratory mockups. Revised section 2.4,
modular wall shelving rails. Revised section 2.11, add finished screw caps.
Revised section 2.16, removed reagent shelving, added quantity information
to items B, C, & D.
1.6 CHANGES TO THE PROJECT DRAWINGS
A. REPLACE portion of SHEET AI-201C with attached SHEET AD07-A001 dated
1/10/2011. Relocation of storm water control.
B. REPLACE portion of SHEET AI-203C with attached SHEET AD07-A002 dated
1/10/2011. Addition of wall wash light in lobby hallway.
C. REPLACE portion of SHEET AI-203C with attached SHEET AD07-A003 dated
1/10/2011. Incorrect section callout displayed in RCP.
D. REPLACE portion of SHEET AI-202D with attached SHEET AD07-A004 dated
1/10/2011. Ceiling height modified to account for HVAC and MEP
coordination.
E. REPLACE portion of SHEET AI-730 with attached SHEET AD07-A005 dated
1/10/2011. Detail of revised Open Lab Alcoves per UNC Comments.
Removed built in glassware cabinet, replaced with wall shelving units and
electrical raceway.
F. REPLACE portion of SHEET AI-730 with attached SHEET AD07-A006 dated
1/10/2011. Detail of revised Open Lab Alcoves per UNC Comments. Addition
of Mobile Type C units for use in select Open Lab Alcoves.
G. REPLACE portion of SHEET A-010 with attached SHEET AD07-A007 dated
1/10/2011. Door schedule height modification per NMR ceiling height change
& rating conflict with door material change.
H. REPLACE portion of SHEET AI-201A with attached SHEET AD07-A008 dated
1/10/2011. Ceiling height modification per NMR height requirements.
UNC-Chapel Hill PERKINS+WILL
Marsico Hall 830123.000
Record Documents 08/15/2017
Code: #40722 Item: #302 File: #07-07092-02A Addendum-07
ADDENDUM NO. 7
00 91 13.07 - 3
I. REPLACE portion of SHEET AI-717 with attached SHEET AD07-A009 dated
1/10/2011. Detail modification per ceiling height modification regarding NMR
height requirements.
J. REPLACE portion of SHEET A-101A with attached SHEET AD07-A010 dated
1/10/2011. Added aluminum cage ladder at Dump Room SB401.
K. REPLACE portion of SHEET A-102B with attached SHEET AD07-A011 dated
1/10/2011. Added aluminum cage ladder at stormwater tank.
L. REPLACE portion of SHEET A-XXX with attached SHEET AD07-A012 dated
1/10/2011. Added self-adhered membrane under shelf angle.
M. REPLACE portion of SHEET A-015 with attached SHEET AD07-A013 dated
1/10/2011. Door Frame Type Elevation modification regarding NMR height
change requirements.
N. REPLACE portion of SHEET AI-800 with attached SHEET AD07-A014 dated
1/10/2011. Modified interior mockup drawings to reflect changes in Open
Lab Alcove.
O. REPLACE portion of SHEET AI-515 with attached SHEET AD07-A015 dated
1/10/2011. Modification of elevation to reflect changes to ceiling height at
10’-0”.
P. REPLACE portion of SHEET A-101A with attached SHEET AD07-A016 dated
1/10/2011. Added door tag to door SB205 in plan.
Q. REPLACE portion of SHEET AI-313 with attached SHEET AD07-A017 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
R. REPLACE portion of SHEET AI-313 with attached SHEET AD07-A018 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
S. REPLACE portion of SHEET AI-311 with attached SHEET AD07-A019 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
T. REPLACE portion of SHEET AI-303 with attached SHEET AD07-A020 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
U. REPLACE portion of SHEET AI-530 with attached SHEET AD07-A021 dated
1/10/2011. Corrected PTD placement conflict.
V. REPLACE portion of SHEET A-105C with attached SHEET AD07-A022 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
UNC-Chapel Hill PERKINS+WILL
Marsico Hall 830123.000
Record Documents 08/15/2017
Code: #40722 Item: #302 File: #07-07092-02A Addendum-07
ADDENDUM NO. 7
00 91 13.07 - 4
W. REPLACE portion of SHEET A-106C with attached SHEET AD07-A023 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
X. REPLACE portion of SHEET A-107C with attached SHEET AD07-A024 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
Y. REPLACE portion of SHEET A-108C with attached SHEET AD07-A025 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
Z. REPLACE portion of SHEET A-109C with attached SHEET AD07-A026 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
AA. REPLACE portion of SHEET AI-205C with attached SHEET AD07-A027 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
BB. REPLACE portion of SHEET AI-206C with attached SHEET AD07-A028 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
CC. REPLACE portion of SHEET AI-207C with attached SHEET AD07-A029 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
DD. REPLACE portion of SHEET AI-208C with attached SHEET AD07-A030 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
EE. REPLACE portion of SHEET AI-209C with attached SHEET AD07-A031 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
FF. REPLACE portion of SHEET A-014 with attached SHEET AD07-A032 dated
1/10/2011. Revised door material to H.M. because of rating conflict.
GG. REPLACE portion of SHEET A-016 with attached SHEET AD07-A033 dated
1/10/2011. Revised incorrect glass thickness callout.
HH. REPLACE portion of SHEET A-003.1 with attached SHEET AD07-A034 dated
1/10/2011. Wall coordination with structural.
II. REPLACE portion of SHEET A-003.2 with attached SHEET AD07-A035 dated
1/10/2011. Wall coordination with structural.
JJ. REPLACE portion of SHEET A-103 with attached SHEET AD07-A036 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
UNC-Chapel Hill PERKINS+WILL
Marsico Hall 830123.000
Record Documents 08/15/2017
Code: #40722 Item: #302 File: #07-07092-02A Addendum-07
ADDENDUM NO. 7
00 91 13.07 - 5
KK. REPLACE portion of SHEET A-016 with attached SHEET AD07-A037 dated
1/10/2011. Added new door type.
LL. REPLACE portion of SHEET A-105A with attached SHEET AD07-A038 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
MM. REPLACE portion of SHEET A-105B with attached SHEET AD07-A039 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
NN. REPLACE portion of SHEET A-105D with attached SHEET AD07-A040 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
OO. REPLACE portion of SHEET A-106A with attached SHEET AD07-A041 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
PP. REPLACE portion of SHEET A-106B with attached SHEET AD07-A042 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
QQ. REPLACE portion of SHEET A-106D with attached SHEET AD07-A043 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
RR. REPLACE portion of SHEET A-107A with attached SHEET AD07-A044 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
SS. REPLACE portion of SHEET A-107B with attached SHEET AD07-A045 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
TT. REPLACE portion of SHEET A-107D with attached SHEET AD07-A046 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
UU. REPLACE portion of SHEET A-108A with attached SHEET AD07-A047 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
VV. REPLACE portion of SHEET A-108B with attached SHEET AD07-A048 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
WW. REPLACE portion of SHEET A-108D with attached SHEET AD07-A049 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
UNC-Chapel Hill PERKINS+WILL
Marsico Hall 830123.000
Record Documents 08/15/2017
Code: #40722 Item: #302 File: #07-07092-02A Addendum-07
ADDENDUM NO. 7
00 91 13.07 - 6
XX. REPLACE portion of SHEET A-109A with attached SHEET AD07-A050 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
YY. REPLACE portion of SHEET A-109B with attached SHEET AD07-A051 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
ZZ. REPLACE portion of SHEET A-109D with attached SHEET AD07-A052 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
AAA. REPLACE portion of SHEET AI-205A with attached SHEET AD07-A053 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
BBB. REPLACE portion of SHEET AI-205B with attached SHEET AD07-A054 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
CCC. REPLACE portion of SHEET AI-205D with attached SHEET AD07-A055 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
DDD. REPLACE portion of SHEET AI-206A with attached SHEET AD07-A056 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
EEE. REPLACE portion of SHEET AI-206B with attached SHEET AD07-A057 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
FFF. REPLACE portion of SHEET AI-206D with attached SHEET AD07-A058 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
GGG. REPLACE portion of SHEET AI-207A with attached SHEET AD07-A059 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
HHH. REPLACE portion of SHEET AI-207B with attached SHEET AD07-A060 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
III. REPLACE portion of SHEET AI-207D with attached SHEET AD07-A061 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
JJJ. REPLACE portion of SHEET AI-208A with attached SHEET AD07-A062 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
UNC-Chapel Hill PERKINS+WILL
Marsico Hall 830123.000
Record Documents 08/15/2017
Code: #40722 Item: #302 File: #07-07092-02A Addendum-07
ADDENDUM NO. 7
00 91 13.07 - 7
KKK. REPLACE portion of SHEET AI-208B with attached SHEET AD07-A063 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
LLL. REPLACE portion of SHEET AI-208D with attached SHEET AD07-A064 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
MMM. REPLACE portion of SHEET AI-209A with attached SHEET AD07-A065
dated 1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed
built in glassware cabinet, replaced with wall shelving units and electrical
raceway.
NNN. REPLACE portion of SHEET AI-209B with attached SHEET AD07-A066 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
OOO. REPLACE portion of SHEET AI-209D with attached SHEET AD07-A067 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
PPP. RELACE portion of SHEET AI-305 with attached SHEET AD07-A068 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
QQQ. REPLACE portion of SHEET AI-306 with attached SHEET AD07-A069 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
RRR. REPLACE portion of SHEET AI-307 with attached SHEET AD07-A070 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
SSS. REPLACE portion of SHEET AI-308 with attached SHEET AD07-A071 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
TTT. REPLACE portion of SHEET AI-309 with attached SHEET AD07-A072 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
UUU. REPLACE portion of SHEET A-105 with attached SHEET AD07-A073 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
VVV. REPLACE portion of SHEET A-106 with attached SHEET AD07-A074 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
UNC-Chapel Hill PERKINS+WILL
Marsico Hall 830123.000
Record Documents 08/15/2017
Code: #40722 Item: #302 File: #07-07092-02A Addendum-07
ADDENDUM NO. 7
00 91 13.07 - 8
WWW. REPLACE portion of SHEET A-107 with attached SHEET AD07-A075 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
XXX. REPLACE portion of SHEET A-108 with attached SHEET AD07-A076 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
YYY. REPLACE portion of SHEET A-109 with attached SHEET AD07-A077 dated
1/10/2011. Revised Open Lab Alcoves per UNC comments. Removed built in
glassware cabinet, replaced with wall shelving units and electrical raceway.
ZZZ. REPLACE portion of sheet S-001, Detail 02 – INDEX OF SHEETS with the
attached sketch number AD07-S001 dated 01/12/2011. This revision adds
S-406 to the sheet index for the sections required for the MRI Shielding
support.
AAAA. REPLACE portion of sheet S-100, with the attached sketch number AD07-
S002 dated 01/12/2011. This revision deleted a wall that inadvertently was
added to the sheet on the 12/13/10 conformance set.
BBBB. REPLACE portion of sheet S-100, with the attached sketch number AD07-
S003 dated 01/12/2011. This revision deleted a gap in the cast-in-place
concrete wall intersection that inadvertently was added on the 12/13/10
conformance set.
CCCC. REPLACE portion of sheet S-101, with the attached sketch number AD07-
S004 dated 01/12/2011. This revision deleted a gap in the cast-in-place
concrete wall intersection that inadvertently was added on the 12/13/10
conformance set.
DDDD. REPLACE portion of sheet S-102, with the attached sketch number AD07-
S005 dated 01/12/2011. This revision deleted a gap in the cast-in-place
concrete wall intersection that inadvertently was added on the 12/13/10
conformance set.
EEEE. REPLACE portion of sheet S-204, section 1, with the attached sketch
number AD07-S006 dated 01/12/2011. This revision is required to add an
aluminum hoist beam in the storm water tank.
FFFF. REPLACE portion of sheet S-204, Section 2, with the attached sketch number
AD07-S007 dated 01/12/2011. This revision is required to incorporate the
aluminum hoist beam in the storm water tank.
GGGG. REPLACE portion of sheet S-204, Section 2, with the attached sketch
number AD07-S008 dated 01/12/2011. This revision is required to
incorporate the aluminum hoist beam in the storm water tank. This also
identified the angle supporting the aluminum grating in the storm water tank.
UNC-Chapel Hill PERKINS+WILL
Marsico Hall 830123.000
Record Documents 08/15/2017
Code: #40722 Item: #302 File: #07-07092-02A Addendum-07
ADDENDUM NO. 7
00 91 13.07 - 9
HHHH. REPLACE portion of sheet S-401, Section 3, with the attached sketch
number AD07-S009 dated 01/12/2011. This revision was required to direct
the contractor to sheet S-406 for the MRI shielding support structure detail.
IIII. REPLACE portion of sheet S-041, Section 4, with the attached sketch number
AD07-S010 dated 01/12/2011. This revision was required to direct the
contractor to sheet S-406 for the MRI shielding support structure detail.
JJJJ. REPLACE portion of sheet S-401, Section 5, with the attached sketch number
AD07-S011 dated 01/12/2011. This revision was required to direct the
contractor to sheet S-406 for the MRI shielding support structure detail.
KKKK. REPLACE portion of sheet S-401, Section 6, with the attached sketch
number AD07-S012 dated 01/12/2011. This revision was required to direct
the contractor to sheet S-406 for the MRI shielding support structure detail.
LLLL. ADD sheet S-406, Section 1, with the attached sketch number AD07-S013
dated 01/12/2011. This added sheet and detail was required to structurally
detail the MRI shielding support structure.
MMMM. ADD sheet S-406, Section 2, with the attached sketch number AD07-S014
dated 01/12/2011. This added sheet and detail was required to structurally
detail the MRI shielding support structure.
NNNN. REPLACE portion of sheet S-113, Plan 2, with the attached sketch number
AD07-S015 dated 01/12/2011. This revision returns the drawing to be as
shown when dated 10/04/2010. When this sheet was plotted on 12/03/2010
some of the line work and dimensioning shifted unintentionally. No structural
revisions have been made, only line work correction.
OOOO. REPLACE portion of sheet S-100 with the attached sketch number AD07-
S016 dated 01/12/2011. This revises a grid label incorrectly labeled as “K.8”
to the correct label of “B”.
PPPP. REPLACE portion of sheet S-101 with the attached sketch number AD07-S017
dated 01/12/2011. This revises a grid label incorrectly labeled as “K.8” to
the correct label of “B”.
QQQQ. REPLACE portion of sheet S-108 with the attached sketch number AD07-
S018 dated 01/12/2011. This revision deletes a grid line labeled as “K.8”
which is located where grid “B” is located on the lower levels. At this level,
no grid in this location is required.
RRRR. REPLACE portion of sheet S-112 with the attached sketch number AD07-
S019 dated 01/12/2011. This revision deletes a grid labeled as “K.8” which
is located where grid “B” is located on the lower levels. At this level, no grid
in this location is required.
UNC-Chapel Hill PERKINS+WILL
Marsico Hall 830123.000
Record Documents 08/15/2017
Code: #40722 Item: #302 File: #07-07092-02A Addendum-07
ADDENDUM NO. 7
00 91 13.07 - 10
1.7 CLARIFICATIONS AND CONTRACTOR QUESTIONS
A. Handrail Details please clarify the anchoring requirement for Details 10 & 11 on
drawing L-501. Drawing indicates both core drill and PVC sleeve. Clarify which
method is required based on the information provided in the specification section.
Is the Contractor permitted to select either method indicated on the drawing?
1. RESPONSE: 2) 3.2 A. Use steel pipe sleeves preset and anchored into
concrete for installing posts. After posts have been inserted into sleeves, fill
annular space between post and sleeve with nonshrink, nonmetallic grout,
mixed and placed to comply with anchoring material manufacturer’s written
instructions.
(Note the escutcheon plate is flush with adjacent pavement as shown in
detail.)
B. Where is there a detail of the Type E metal gate? B3/AE-706 is missing.
1. RESPONSE: There is no gate Type E in the project (RR).
C. Where is the view of the generator roof that shows the metal fence?
1. RESPONSE: Metal fence is shown on A-103 and A-103D (RR).
D. What perforation pattern is required for the aluminum panels? (gates, stairwells,
generator roof)
1. RESPONSE: The perforation pattern type is a hole pattern, gauge .125 inches,
¾” x 1” Str. Sq., 56% open area. Finish shall be 2-coat fluoropolymer.
E. 123553.B.3.6.C indicates the casework contractor is responsible for any designated
lab signage. However, the casework elevation drawings indicate signage is OFOL
Please advise.
1. RESPONSE: Project signage is Owner provided. Document reference refers to
information provided to Manufacturer from Contractor. Contractor to advise.
F. 123553.B.3.6.L we assume the "glass lites" is referring to the glass for the glazed
door cabinets. Please confirm.
1. RESPONSE: Document reference refers to information provided to
Manufacturer from Contractor. Contractor to advise.
G. Specification section 123553 specifies stainless steel casework, painted metal
casework, painted metal casework with wood fronts, wood casework with wood
drawer bodies and wood casework with metal drawer bodies. Drawings however do
not indicate anything other than metal casework and wood casework. Please advise
location for the different types of casework.
1. RESPONSE: There is no metal casework with wood fronts or wood with metal
drawer bodies on the project. Drawings indicate stainless steel, metal, and
wood casework with various types of countertop assemblies.
UNC-Chapel Hill PERKINS+WILL
Marsico Hall 830123.000
Record Documents 08/15/2017
Code: #40722 Item: #302 File: #07-07092-02A Addendum-07
ADDENDUM NO. 7
00 91 13.07 - 11
H. Specification section 123553.2.14.H calls for hardwood runners for drawer slides on
wood cabinets. Our standard construction is full extension slides. Please advise if
this is acceptable.
1. RESPONSE: Hardwood runners for drawer slides on wood cabinets are
required.
I. Specification section 123553.2.14.I calls for locks where indicate. Drawings do not
show or indicate any locks. Please advice.
1. RESPONSE: Locks are to be provided for mobile cabinets details on AI-630.
J. Specification section 123553.2.16 A, B, C, D, and E Laboratory Accessories. None
are shown or indicated on drawings. Please advise.
1. RESPONSE: Item A has been removed, and quantities provided for items B,C,
& D in Addendum-07.
K. Paper towel and soap dispensers, we assume are by others. Please confirm.
1. RESPONSE: Contractor to coordinate and clarify Bidding and scopes of work
with Manufacturers. Please note some accessories require coordination with
casework manufacture. Example: recessed paper towel dispenser on side of
sink cabinet, D3/ AI-530.
L. We assume that all data outlets, electrics outlets and raceways other than electrics
in fume hoods are by others. Please confirm.
1. RESPONSE: Contractor to coordinate and clarify Bidding and scopes of work
with Manufacturers.
M. Specification section 114135 Cold Room Chambers specify that the stainless steel
shelving in the cold rooms are to be by the cold room supplier. Who is responsible
for stainless steel shelving not located in cold rooms? Example: rooms B220 and
B221 .
1. RESPONSE: Contractor to coordinate and clarify Bidding and scopes of work
with Manufacturers. Shelving is specified in Addendum-07 cold room
specification.
N. Specification section 123553.2.4 indicates a MAX/Lab wall rail system is required at
wall shelving conditions. However, in reviewing the architectural drawings the
adjustable horizontal rail shelving is not indicated as a requirement. Please clarify.
1. RESPONSE: Wall shelving supports specification revised in Addendum-07.
O. A lock is shown on the top drawer of the Mobile Type A. Is it the intent for the lock
to lock only the top drawer or is it to lock all 4 drawers in the stack? Please clarify.
1. RESPONSE: Lock for this cabinet is for all 4 drawers.
UNC-Chapel Hill PERKINS+WILL
Marsico Hall 830123.000
Record Documents 08/15/2017
Code: #40722 Item: #302 File: #07-07092-02A Addendum-07
ADDENDUM NO. 7
00 91 13.07 - 12
P. Exhibit B, Part B.3.13 Removable Panels, Marker Panels, Electrical Panels and
related conditions. The first sentence instructs that we are to construct removable
and operable panels where indicated including but not necessarily limited to work
associated with applicable details on certain detail sheets, specifically AI-738
Electrical Panel Wall. The last sentence says that the fire extinguishers, marker
boards, electrical panels and similar items are the responsibility of others. In
reviewing specification section 064200 Wood Paneling it appears that wood panels
and aluminum trim for the electrical panel wall is specified as part of that section.
In reviewing the drawing details on sheet AI-738 certain parts of the details are
labeled with specific specification sections. Please advise what part or parts of the
electrical panel wall assembly we are to include in the casework bid package.
1. RESPONSE: Contractor to coordinate and clarify Bidding and scopes of work
with Manufacturers.
Q. On the aluminum perforated panels at the stairs, can you please provide the
thickness, holes sizes, and spacing of holes?
1. RESPONSE: The perforation pattern type is a hole pattern, gauge .125 inches,
¾” x 1” Str. Sq., 56% open area. Finish shall be 2-coat fluoropolymer.
R. On the wire mesh panels in the sub basement and at the roof quench pipes E2/A1-
406 and A-102C. Please provide thickness and spacing. Also are the panels steel,
aluminum, stainless steel etc?
1. RESPONSE: The installation for each location is as follows:
Wire Gauge Diameter: 0.1200.
Mesh: Square weave wire mesh, 1 inch opening, 79% open area.
Maximum Panel Dimensions: 48 inches (width) x (height) as indicated on
drawings.
Framing: Square Post and Square Rail.
Finish: Galvanized.
S. On the equipment schedule sheets A-041 and A-042, under notes, some of the
fume hoods are required to have unexhausted/unvented toxic chemical storage
cabinets that comply with UL 1275. We do not understand the reference to UL
1275 for the unexhausted/unvented toxic chemical storage cabinet. Please clarify
how this affects this type cabinet which is an acid storage cabinet.
1. RESPONSE: The NC State Construction Office, upon reviewing the Owner’s
chemical lists, requested that a portion of the fume hoods that will store
hazardous materials are required to have the UL 1275 rating. The location of
these fume hoods as well as the hazardous cabinets are indicated on the Life
Safety plans, Sheets G-101 thru G-109.
UNC-Chapel Hill PERKINS+WILL
Marsico Hall 830123.000
Record Documents 08/15/2017
Code: #40722 Item: #302 File: #07-07092-02A Addendum-07
ADDENDUM NO. 7
00 91 13.07 - 13
T. Please review B1/AI418 and similar details at PLAM casework. This indicates a HS-
1 which I assume is a hand sink. I find no such designation in the specifications. It
also indicates fittings as WF-2 which is specified as being from the lab casework
vendor. What is the intent in this and similar locations?
1. RESPONSE: All lab casework fixtures and associated fittings are by the lab
casework vendor.
U. This indicates a HS-1 which I assume is a hand sink. I find no such designation in
the specifications. It also indicates fittings as WF-2 which is specified as being from
the lab casework vendor. What is the intent in this and similar locations?
1. RESPONSE: All lab casework fixtures and associated fittings are by the lab
casework vendor.