HomeMy WebLinkAbout00 91 13 02_ADDENDUM NO 08.pdfUNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 1 SECTION 00 91 13.08 - ADDENDUM NO. 8 PART 1 - GENERAL 1.1 SCOPE A. This Addendum is issued in connection with revision of plans and specifications which have been previously issued. B. When construction is not under contract, all instructions contained herein shall be reflected in the contract sum and this Addendum will be made a part of the Contract Documents, if, as, and when a Contract is awarded. C. This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated 12/03/2010, as noted below. Receipt of this Addendum and Addenda issued by the Construction Manager at Risk under separate cover must be individually acknowledged in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. D. This Addendum consists of _172_ pages and _2_ replacement sheets. 1.2 CHANGES TO THE PRIOR ADDENDA A. None. 1.3 CHANGES TO THE BIDDING REQUIREMENTS A. None. 1.4 CHANGES TO THE CONDITIONS OF THE CONTRACT A. None. 1.5 CHANGES TO THE PROJECT SPECIFICATIONS A. REPLACE Specification Division 08, Section 08 14 16 – FLUSH WOOD DOORS. Added sound door assembly to Part 2 of the specifications for this section. B. REPLACE Specification Division 08, Section 08 41 13 – ALUMINUM- FRAMED STOREFRONTS AND ENTRANCES. Added Sliding Laboratory Door and Frame to Part 2 of the specifications for this section. UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 2 C. REPLACE Specification Division 09, Section 09 65 00 – ACCESS FLOORING. Added aluminum trench and cover system to Part 2 of the specifications for this section. D. REPLACE Specification Division 12, Section 12 35 53 Laboratory Casework. Revised Section 2.10, Grain Direction and Drawer Bodies. Revised Section 2.17 Service Fittings. 1.6 CHANGES TO THE PROJECT DRAWINGS A. REPLACE ENTIRE SHEET A-010. Reissued door schedule sheet for clarification. B. REPLACE ENTIRE SHEET A-011. Reissued door schedule sheet for clarification. C. REPLACE portion of SHEET AI-530 with attached SHEET AD08-A001 dated 1/12/2011. Coordinated shelving, sink finishes, and services. D. REPLACE portion of SHEET A-002 with attached SHEET AD08-A002 dated 1/12/2011. Revised partition type width. E. REPLACE portion of SHEET A-102C with attached SHEET AD08-A003 dated 1/12/2011. Wall moved to accommodate/coordinate necessary electrical room size. F. REPLACE portion of SHEET AI-202C with attached SHEET AD08-A004 dated 1/12/2011. Wall moved to accommodate/coordinate necessary electrical room size. G. REPLACE portion of SHEET AI-670 with attached SHEET AD08-A005 dated 1/12/2011. Coordinated/revised finish annotation with specifications. H. REPLACE portion of SHEET AI-670 with attached SHEET AD08-A006 dated 1/12/2011. Coordinated/revised finish annotation with specifications. I. REPLACE portion of SHEET AI-670 with attached SHEET AD08-A007 dated 1/12/2011. Coordinated/revised finish annotation with specifications. J. REPLACE portion of SHEET AI-670 with attached SHEET AD08-A008 dated 1/12/2011. Coordinated/revised finish annotation with specifications. K. REPLACE portion of SHEET AI-670 with attached SHEET AD08-A009 dated 1/12/2011. Coordinated/revised finish annotation with specifications. UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 3 L. REPLACE portion of SHEET A-010, A-011, A-012, A-013, and A-014 with attached SHEET AD08-A010 dated 1/12/2011. Added door schedule note 8 for finish coordination/clarification. M. REPLACE portion of SHEET A-014 with attached SHEET AD08-A011 dated 1/12/2011. Revised/coordinated door thickness with specifications. N. REPLACE portion of SHEET A-103B with attached SHEET AD08-A012 dated 1/12/2011. Added door tag for door 1001C. O. REPLACE portion of SHEET A-101B with attached SHEET AD08-A013 dated 1/12/2011. Added door tag for door SB205A3. P. REPLACE portion of SHEET A-016 with attached SHEET AD08-A014 dated 1/12/2011. Removed interior window / frame elevation no longer used. Q. REPLACE portion of SHEET AI-201B with attached SHEET AD08-A014 dated 1/12/2011. Moved and added operating light visibility to RCP in Procedure Room. R. REPLACE portion of SHEET AI-201A with attached SHEET AD08-A015 dated 1/12/2011. Moved and added operating light visibility to RCP in Procedure Room. S. REPLACE portion of SHEET AI-514 with attached SHEET AD08-A016 dated 1/12/2011. Updated elevation regarding moved and added operating light visibility to RCP in Procedure Room. T. REPLACE portion of SHEET AI-514 with attached SHEET AD08-A017 dated 1/12/2011. Updated elevation regarding moved and added operating light visibility to RCP in Procedure Room. U. REPLACE portion of SHEET AI-512 with attached SHEET AD08-A018 dated 1/12/2011. Updated elevation regarding moved and added operating light visibility to RCP in Procedure Room. V. REPLACE portion of SHEET A-040 with attached SHEET AD08-A019 dated 1/12/2011. Added Vivarium operating light to Equipment Schedule. W. REPLACE portion of SHEET C-100.B with attached SHEET AD08-C001 dated 1/12/2011. Clarification sketch related to extent of existing curb and gutter. X. REPLACE portion of SHEET C-401.B with attached SHEET AD08-C002 dated 1/12/2011. Clarification sketch related to revised keyed notes. UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 4 Y. REPLACE portion of SHEET L-501 with attached SHEET AD08-L001 dated 1/12/2011. Clarification sketch related to Addendum #7, 00 91 13.07.1.7.A.1. Z. REPLACE portion of SHEET M-006 with attached SHEET AD08-M001 dated 1/12/2011. Scope added to show demolition of campus chilled water piping serving Med D Building. AA. REPLACE portion of SHEET M-006 with attached SHEET AD08-M002 dated 1/12/2011. Scope added to show demolition of campus chilled water piping serving Med D Building. BB. REPLACE portion of SHEET M-012 with attached SHEET AD08-M003 dated 1/12/2011. Detail added to show typical trench components and dimensions. 1.7 CLARIFICATIONS AND CONTRACTOR QUESTIONS A. Is there a basis of design for the aluminum electrical trench A2/AI-717? 1. RESPONSE: Refer to revised specification section 09 69 00 – ACCESS FLOORING as part of this addendum. B. On drawing L-501 detail 11 there is a note that says condition varies. What are the various conditions? 1. RESPONSE: “Condition Varies” refers to the type of paving at bottom of stairs varying depending upon site location of stairs. Some locations will have bluestone pavers at bottom of stairs, while other locations will have brick paving. C. Please clarify which specification section covers the "HSC" chemical cabinets and the "CSC" chemical cabinets as indicated on the equipment schedule on sheets A- 040, A-041 and A-042. 1. RESPONSE: Reference section 12 35 53 2.5 Metal Safety Cabinets in Laboratory Casework specification for HSC and CSC cabinets. Reference equipment schedules A-040 thru A-042 for further description of cabinets. HSC & CSC are classifications of the metal storage cabinet as required by the building code. D. Regarding Stairs #1, 2, & 3, additional information for the perforated aluminum panels is needed. What is the thickness? Is there a particular manufacturer required? What is the finish – prime ptd or high performance coating per AE-706? 1. RESPONSE: Refer to Addendum #7 item 00 91 13.07.1.7.D.1. UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 5 E. What is the finish for the handrails at Stairs #1, 2, & 3? 1. RESPONSE: Prime as specified in 05 51 00 and then paint as specified in 09 91 13 (High Performance Coating). F. What is the finish on the guardrail at Stair #4? Is it a high performance coating or is it galvanized like the handrail? Reference A3 & A5/AE-703. 1. RESPONSE: Galvanized. G. What is the finish for the rails at Stair #8? Is it a high performance coating per D5/AE-702 or is it galvanized per the Specifications section 0552-13? 1. RESPONSE: High-Performance Coating. H. What is the material and size of the chain required at the stone bollards (7/L501)? 1. RESPONSE: 3/8” Self-Colored (Non-Galvinized) Grade 30 Proof Coil Chain. I. Are the pipe bollards at the Loading Dock/Service Yard to have a high performance coating per Specifications section 05500 or galvanized per Dtl 5/C-111.B? 1. RESPONSE: High-Performance Coating. J. Is the Surgical Light Mounting Structure (C3/AI-702) only required in Large Animal Procedure Rm #B121(AI-202D)? If required at additional locations, please verify locations. 1. RESPONSE: Refer to AD08-014 – AD08-019 for additional locations of Surgical Light Mounting structure in Procedure Rooms. K. Are the guardrails and grating at the Vivarium Catwalk to have a high performance coating per D1/AI-702 or prime ptd per C1/AI-702? What is the finish for all steel support framing? Are the catwalk access ladders steel or aluminum and what is the finish for these? 1. RESPONSE: Finish is high performance coating for guardrails, grating, and support framing Catwalk access ladder is steel. L. What is the finish for all interior aluminum storefront windows, door frames, sidelights including aluminum frames for wood and hollow metal doors by others. Class II clear anodized would be the normal finish and most cost effective for interior application with standard 2 year warranty on finish. Class I clear anodized is available for up charge with max. 10 year finish warranty but this is designed for external application. The storefront spec’s that I have call out 3-coat paint which is probably for the exterior frames. Please advise. 1. RESPONSE: See revised specification 08 41 13 Aluminum-Framed Storefronts and Entrances in Addendum-08. UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 6 M. Per door schedule doors #B007, 8000A, 8100D, 8100E, are called out as Fire rated hollow metal doors in aluminum frames. Please verify if this is correct since standard aluminum door frames will not fire rate. 1. RESPONSE: Refer to Addenda 07, AD07-A-032 for material clarification. N. Please verify door types for pair of doors located on sheet A- 101A to right of column 9 along corridor SB210A they are not labeled. 1. RESPONSE: Refer to Addenda 07, AD07-A016. O. Please verify door type for single door located in W1 type frame on sheet A-101B to left of column line 7 in control room # SB205A it is not labeled. 1. RESPONSE: Refer to Addenda 08, AD08-A017. P. On sheet A-101B doors # SB019,SB018,& SB017, are not shown on door schedule, please verify what types they are. 1. RESPONSE: Refer to ASI-085 & reissued sheets A-010 & A-011 per Addenda 08. Q. On sheet A-103A doors # 1210, 1211, & 1214, are not shown on door schedule, please verify what types they are. 1. RESPONSE: . Refer to ASI-085 & reissued sheets A-010 & A-011 per Addenda 08. R. On sheet A-104A door # 2200D calls out for painted aluminum frame to match exterior storefront. Is this correct, and if so what bid package should it be in. 1. RESPONSE: Frame to be clear anodize per Addendum #7 clarifications. Refer to Choate Construction for bid package questions. S. On sheet D3 / A-016 details, M2, M3, and M4, for interior storefront windows are drawn showing ¼” monolithic glass as per glazing legend but notes call out 1” thickness please verify that ¼” is correct thickness . 1. RESPONSE: Refer to AD07-A033. T. All the standard interior storefront details show 2” sightline. Typical interior systems are 1 ¾” sightline is this acceptable? 1. RESPONSE: Sightlines shown as 2” nominal. U. Please verify location of frames type B1 none are shown on door schedule but are shown on frame type elevations A-015. 1. RESPONSE: Refer to reissued A-010 and A-011 sheets. UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 7 V. 12 35 53 1.2 B.1-2 defines ends of cabinets both as “…exposed”…and “concealed”. Please confirm that “ends of cabinets to be installed directly against and completely concealed by walls or other cabinets are defined as “concealed””. 1. RESPONSE: Ends of cabinets and those directly against wall and considered concealed conditions. W. 12 35 53 2.4 E.1.a, E.6 list removable shelf lip as both 18 gauge cold rolled steel and 1” wood maple edge banding on front safety lip. Please confirm front lip on steel shelving is steel. 1. RESPONSE: Intent is to have removable front lip where there is no maple edging and a permanent lip where maple edging is indicated. X. 12 35 53 2.10 1-2 Grain Direction lists both vertical match and combination grain patterns. Please confirm all grain direction is continuous vertical matching. 1. RESPONSE: See Addendum-08, Revised Laboratory Casework specification. Y. 12 35 53 2.10 E.8 Backs of Cabinets ¼” (6.4mm) thick hardboard dadoed into sides, bottoms and tops where not exposed. Please confirm a removable back, 5mm thickness, dadoed into top cabinet frame and secured to a 3-sided reinforcing cleat is acceptable. This is intentional to provide access to service utilities behind fixed cabinetry and is commonly installed across North Carolina college and university campuses. 1. RESPONSE: Provide backs of cabinets as specified. Z. 12 35 53 2.10 E.10 Drawer sides and backs ½”…with glued dovetail or multiple- dowel joints. Please confirm lock should joints, which AWI/AWI rates as ‘Premium’ construction are also acceptable joinery. 1. RESPONSE: Provide drawer sides of cabinets as specified. AA. 12 35 53 2.10 E.11 Drawer bottoms ¼” veneer-core hardwood plywood. We propose a medium density fiberboard or hardboard bottom with a white melamine or pvc surface for the bottom. This is intentional to aid in surface durability and cleaning. Please confirm that a coated medium density fiberboard is also acceptable as a bottom. 1. RESPONSE: Provide bottoms of cabinets as specified. BB. 12 35 53 2.10 E.12 Steel Drawer Bodies. This overwrites specification points E.10 and E.11. This suggested upgrade does not change cabinet construction, drawer suspension loads nor add cost to this project specification. Please confirm all wood casework shall include steel drawer bodies and not wood drawer bodies. 1. RESPONSE: See Addendum-08, Revised Laboratory Casework specification. CC. 12 35 53 2.14 G Drawer slides requests full extension, 100 # epoxy coated, over- travel slides. Please confirm that a 150 # zinc coated over-travel full extension UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 8 slide is also acceptable to the epoxy coated 100 # slide (Note, all file drawers will receive 150# slides regardless). 1. RESPONSE: Provide drawer slides as specified. DD. 12 35 53 2.17 B.1 requires Vandal–resistant faucets and fixtures; however, the model numbers included within 3.8 Service Fitting Schedule are not vandal resistant which will add cost to each fitting. Please confirm the specified fixture part numbers do not include vandal-resistant components. 1. RESPONSE: See Addendum-08, Revised Laboratory Casework specification. EE. 11 53 43 lists ES/SS and EW which is not included as part of Package 12B Laboratory Casework and Fume Hoods. Please confirm the ES/SS and EW in specification section 11 53 43 is not included in Bid Package 12B. 1. RESPONSE: Refer to Choate Construction for scope of work clarifications. FF. Please confirm the stainless steel shelving shown in the cold rooms is not part of Bid Package 12B (see A/102A). 1. RESPONSE: Refer to Choate Construction for scope of work clarifications. GG. Please specify “Storage Shelving” in B306 found on A-102E and confirm what bid package provides it. 1. RESPONSE: Refer to Choate Construction for scope of work clarifications. HH. Please confirm Bid Package 12B is not providing the water fixtures on the plastic laminate casework. Note, D3/AI-418 shows WF-2 which is defined as in 12 35 53 Lab Casework specification. 1. RESPONSE: Intent of drawings is for plastic laminate casework fixtures to be specified per plumbing drawings and specifications. Laboratory fixtures to be specified in the laboratory casework specification. Reference plumbing drawings for plumbing fixtures in plastic laminate casework in lieu of fixture notations referenced on plastic laminate casework architectural detail drawings. II. Please confirm the intent and extent of Bid Package 12B to supply GFB-1 (Vac, N2, CO2) fixtures at BSC units. 12 35 53 3.8.R defines these as required at BSC’s however BSC’s are not included in Package 12B. This occurs approximately 200- 250 times. 1. RESPONSE: Refer to Choate Construction for scope of work clarifications. JJ. Please confirm Bid Package 12B does not include water fixtures at the hand wash sinks (D5/AI-501). The hand wash sinks are not part of bid package 12B. 1. RESPONSE: Refer to Choate Construction for scope of work clarifications. UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 9 KK. Specification 12 35 53 does not define a DI-1 fixture as shown on B2/AI-503. Please confirm is to supply these fixtures, Provide a model number. 1. RESPONSE: Provide DI-1 as indicated in specification section 12 35 53 3.8 item K. LL. Please confirm service fixtures are not to be supplied at locations shown on drawings as “stub-out for future”, reference A3/AI-551. 1. RESPONSE: These items are no longer future. Provide GFB-1 at these locations. MM. Bid Package 12B lists markerboard panels that are integral with the umbilicals and electrical panels are by others; however, to include the hardware. We suggest whoever provides the markerboard panels also provide the mounting hardware. Please review these details and confirm which package should provide each. 1. RESPONSE: Refer to Choate Construction for scope of work clarifications. NN. Decon/Autoclave Room (D4/AI-530) lists wood shelves. Wash room casework is routinely steel or stainless steel. In addition, we recommend an epoxy resin or stainless countertop. Please verify the finishes within this room. 1. RESPONSE: See revised detail for this location AD08-A001 and revised laboratory casework specification. OO. Please confirm which Service Fixtures are to be supplied at D4/AI-530. 1. RESPONSE: See bulletin drawings AD08-A001. PP. Please confirm which Service Fixtures are to be supplied at D4/AI-732. 1. RESPONSE: Service fixtures to be provided are same as B4/AI-732. QQ. Drawings indicate cupsinks at all fume hoods even hoods without a water service. Please verify that only hoods with water service require a cupsink. 1. RESPONSE: Cup sinks are to be provided at all fume hoods. Where no water supply is provided to fume hood a semi-permanent cover plate should be provided for future water service. RR. Please confirm if quick connect fittings (GFB-1) are to be supplied at NMCU-1 units. 1. RESPONSE: GFB-1 fixtures should be supplied at NMCU-1 units.. UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 10 SS. 12 35 53 lists delegated design to include “comprehensive engineering analysis by a qualified PE”. Please confirm that this includes sealed drawings for all casework and the island casework truss system. 1. RESPONSE: Intent is to provide system structural performance information as noted for casework systems. Provide sealed structural drawings for casework truss as provided by the specifications. TT. 11 53 13 2.4 O requires in-line filter housing above radio-isotope fume hoods with HEPA filter. Physically and functionally this must mount and be connected inline with the mechanical exhaust ductwork. Please confirm this HEPA filter housing and filter is part of the mechanical ductwork system. RESPONSE: The HEPA filter housing and filter is NOT a part of the mechanical ductwork systems. The fume hood manufacturer is to furnish a HEPA filter housing that connects to the fume hood on one side and the fume hood exhaust ductwork system on the other side Access to replace the filters should be through the shroud. UU. 11 53 13 3.3 A and B Field Testing lists both to test “one of each installed fume hood” (A) and to Field Test Installed hoods (B) implying to test all fume hoods. Please confirm all fume hoods are to be field test to verify performance. 1. RESPONSE: Provide testing as specified. VV. 11 53 13 3.3B requires the fume hood contractor to make adjustments to the mechanical contractors’ exhaust fans and HVAC system if a hood does not properly perform in the field. Please confirm the mechanical contractor should make adjustments to their HVAC system and the hood contractor does not adjust the HVAC system. 1. RESPONSE: The mechanical subcontractor will have the ability to make adjustments and is required to assist during fume hood certification tests per Section 23 00 95-3.1.C. WW. Please advise if the following frames are to be aluminum or hollow metal: #8000A, 8100A, 8100B, 8100D, 8100E, 8200A, 8200B 1. RESPONSE: Doors that have not been modified per AD07-A032 have the correct frame material. XX. Please advise if the following doors are to be 2” or 1 3/4” thick: #8101, 8199A, 9000DA, 9000BD, 9099S, SB401, SB404 1. RESPONSE: Refer to AD08-A011 for revised door thicknesses. UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 11 YY. Wood door specification references AWI and WDMA quality standards. Please advise which standard is to be used. If AWI quality labels are required, please provide AWI QPC # 1. RESPONSE: Current (2009) AWI Standard is to be used for this project. A QCP number is pending from AWI and will be provided after award of the bidding package. ZZ. Advise if door species is to be Cherry or Maple 1. RESPONSE: Refer to bulletin drawing AD08-A010 for door species clarification. AAA. Please advise hardware set at door #1099S,1001EA,2300,2300A 1. RESPONSE: Doors have been updated with hardware set information. BBB. Doors 1106A, 4124A, 4200AA, 5120A, 6120A, 6200AA, 7120A & 7200AA are noted as a sound doors. Please advise if there is a STC rating required for these doors. 1. RESPONSE: See revised specification section 08 14 16 Flush Wood Doors for added sound door assembly information. CCC. Door B154D is noted as a roll up door on door schedule. Floor plan shows a single swinging door. Please advise which is correct 1. RESPONSE: Roll up door note removed from door. DDD. Door B155A is shown on door schedule as a hollow metal door going into a stainless steel frame. Please advise if this is correct. RESPONSE: Refer to reissued sheet A-010. EEE. There are several openings shown on the floor plans that are missing from the door schedule. Please advise if theses doors are to be included in bid package 8B. If so, please provide opening details. 1. RESPONSE: Refer to reissued sheets A-010 and A-011. FFF. Wall type C40 is shown as a 3 5/8” stud wall with 2 layers of 5/8” sheetrock which would equal a 6 1/8” wall. Detail notes wall thickness of 4 7/8” Please advise which is correct. 1. RESPONSE: Detail changed to correct partition thickness. GGG. Are all lead lined doors to be wood doors going into hollow metal frames? 1. RESPONSE: Yes, correct. UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 12 HHH. Please verify all cylinders are to be keyed by UNC. 1. RESPONSE: Doors cylinders are to be provided by the Contractor to UNC for keying by UNC. III. Please provide door, frame & hardware details and/or specifications for the sliding wood door assemblies #3224, 4224, 5224, 6224 & 7224. 1. RESPONSE: Door frame, hardware details, and specifications provided for sliding wood door assemblies are provided in revised section 08 41 13 – ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS. JJJ. We are unable to locate interior window types IW17, IW16, and IW8 can you please have architect verify that these are being used and location. 1. RESPONSE: These window types are not used on the project. KKK. Drawing C-101.B Demolition Plan depicts Existing Curb and Cutter Removal on the north side of Mason Farm Road for curb that does not appear on Drawing C-100.B Existing Conditions. Should removal of this curb and gutter be included in the bid for Package 2G? If so, will this removal necessitate asphalt milling and overlay per Detail 3 on SheetC-412.B to be included in bid for Package 2G? 1. Response: Yes, the removal of the curb and gutter to the south of the proposed building should be included in the bid. Yes, the new asphalt should be tied to existing asphalt according to the detail for milling and overlay on C- 412.B. See AD08-C001 LLL. Please confirm that the waterline piping and hydrant (in bold) to the southwest of the new building are, in fact, existing-to-remain and are not part of the demolition work in bid Package 2G? 1. RESPONSE: The waterline between the proposed building and Mason Farm Road is existing, as circled and stated on C-301.B. The proposed domestic waterline between Taylor Hall and the proposed building is proposed, as identified on C-301.B. MMM. Are cutting, capping, and removal of electrical, phone, data, steam piping, whiteway lighting for the Med D Bldg. site to be included in the bid for Package 2G? 1. RESPONSE: Electrical demolition requirements for the Med D Building are noted on Drawing D-102. The building does not have a connection to the campus steam system. NNN. Please define the extent of removal and point of cutting and capping for the chilled water service piping of the Med D Bldg as work in the West Drive Right-of-Way involves additional traffic control, patching and overlay considerations. 1. RESPONSE: Drawing M-006 has been modified to show demolition of the underground chilled water lines serving the Med D Building. Additional UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 13 mechanical demolition requirements for the Med D Building are noted on Drawing D-102. OOO. Please define the extent of removal and point of cutting and capping for the domestic water service piping of the Med D Bldg as work in the West Drive Right- of-Way involves additional traffic control, patching and overlay considerations. 1. RESPONSE: The location of the existing domestic water service is unknown. The domestic waterline should be removed, and capped at the back of existing curb. PPP. Please define the extent of removal and point of cutting and capping for the fire service piping of the Med D Bldg as work in the West Drive Right-of-Way involves additional traffic control, patching and overlay considerations. 1. RESPONSE: The location of the existing fire service piping is unknown. Any fire service should be removed and capped at the back of existing curb. QQQ. The Town of Chapel Hill Department of Public Works, Street Division collects fees for Right-of-Way disturbance and street cuts in and along Chapel Hill streets and roadways. Are such fees and associated 5-year warranty to be included in the bid for Package 2G? If so, please specify as to whether Mason Farm Road and West Drive (north and south of Mason Farm Road) have been resurfaced in the last three or five years. 1. RESPONSE: Fees associated with the resurfacing of Mason Farm Road are the responsibility of the Owner and are not associated directly with this project. West Drive is privately owned by UNC. RRR. The Orange Water and Sewer Authority (OWASA) collects fees for new water and sewer building services named “Availability Fees” (roughly $475,000.00+/-, as of October 2010) and these fees are collected at the time the new water meter is to be set and the account activated. Are Availability Fees to be paid by the contractor and thereby included in the bid for Package 2G? 1. RESPONSE: Fees associated with the OWASA water and sewer are paid by the Owner. SSS. Will the new Chilled Water line installations require the inclusion of any Air Vents Assemblies? If so, please identify locations and quantities for inclusion into the bid for Package 2G. 1. RESPONSE: Chilled water vent locations are indicated on Drawing M-011. TTT. Will the new Chilled Water line installations require the inclusion of any Drain Assemblies? If so, please identify locations and quantities for inclusion into the bid for Package 2G. 1. RESPONSE: No new underground drains are required. UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 14 UUU. Please provide profiles for the proposed water and sewer piping so that quantities of excavated materials may be accurately calculated for inclusion in the bid for Package 2G. 1. RESPONSE: Sewer profiles are located on C-305.B. For quantities for excavation for domestic water and fire service, the pipes are to be installed with 48” of minimum cover. VVV. Drawing c-411.B, Detail 3 does not specifically address the endwalls of the cistern. May they be precast plugs or precast into the end culvert section at the discretion of the Supplier’s Design Engineer? 1. RESPONSE: The cistern is to have a precast end section designed by the precaster. WWW. The scope of work states that we are to include the storm drainage pumps and the storm drainage pump control panel; however, the bid form has alternate adds for these items. Are these to be included in the base bid or provided as add alternates? Also, the specifications state for the pumps to be by ABS and the control panel to be by Control Interface. Please clarify. 1. RESPONSE: The Base must be a pump system that meets the requirements per the specifications. ABS Pumps and Control Interface are the basis of design. The Contractor may use the Basis of Design pump system for bidding purposes, in which case no Add Alternate would be required. XXX. Is there any information in regards to the bottom elevation of the existing steam tunnel that is running parallel with Storm Filter 2 & Storage Tank 2? The plans show the Storm Filter & Storage Tank being installed ~ 5’ away from the existing steam tunnel; therefore, it is a possibility that the existing steam tunnel could be undermined which would raise a concern for some type of underpinning/bracing. 1. RESPONSE: The elevation of the bottom of the steam tunnel at the southeast corner of the Storm Tank-2 is approximately 486, at the southwest corner the bottom of the steam tunnel is approximately 484.5. This information is according to drawings provided by the Owner. YYY. Note #1 for the Underground Storage Tank/Cistern on Sheet C-411.B states, “Contractor is responsible for having a qualified professional geo-technical engineer licensed in North Carolina to test and certify that the subgrade for Storage Tank/Cistern is in conformance with the plans and specifications and is suitable. The mudmat installation shall also be done under the supervision of a geo-technical engineer licensed in North Carolina.” Is subgrade testing for these items to be included in our base bid or is the CM-R going to conduct the testing? In the past on CM-R projects the Contractor has not had to include any geo-technical testing. 1. RESPONSE: The Contractor is responsible for coordinating with the Owner’s Geotechnical Engineer for testing, and to provide notice and access to the work area in a timely fashion prior to proceeding with work. UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 15 ZZZ. On sheet C-401.B, the pipe sizes referenced in the notes and on the trench drain schedule are conflicting with one another. Per Notes #4 & #5 it states that the pipe size is to be 6” SCH 40 PVC from TD-4 to JB-6 and from TD-3 to JB-5; however, on the trench drain schedule the outlet size says 4” DIP. Which pipe size and pipe type is correct? 1. RESPONSE: 4” DIP is correct. The drawing has been changed. AAAA. On sheet C-401.B, what are the dotted lines going to JB-5 & JB-6 and from the CO on the West side of the Building to the Cleanout w/ Invert Elevation of 501.9? Are these sock drains for the landscape beds? If so, what are the pipe sizes, pipe types, and invert elevations? 1. RESPONSE: Yes, those are planter drains. They are to be 4” perforated Sch. 40 PVC sock pipe @ 0.5% minimum. The invert is flexibe as long as the pipe ties in to the downstream inlet, maintains positive flow, and has 0.5% minimum slope. For details regarding location in the planter beds, see the Landscape drawings. BBBB. On sheet C-401.B, what is the top elevation of the pump tank where the 5’x 5’ pre-cast structure is to be installed? Detail 7/C-412.B gives the rim elevation; however, it does not give the elevation of the top of the pump tank. 1. RESPONSE: Please refer to the Structural drawings for information relating to the pump tank elevations. CCCC. On sheet C-401.B, may the 15” RCP from the Pump Tank to CB-3 be substituted with DIP? Also, will a sleeve need to be installed at the Pump Tank wall penetration? 1. RESPONSE: Yes, 15” DIP may be substituted at the location for the tie-in to the pump tank. The connection must be in accordance with the waterproof manufacturer’s written requirements. DDDD. In the past we have been provided trench details for underground chill water installations. We do not see a trench detail provided. What should we include for the trench width, what are the spacing dimensions from the trench wall to the 1st pipe and the spacing between the two pipes, what is the depth of the #57 Stone/67 Stone for bedding, and will the #57/67 Stone need to be brought up to the spring line of the pipe or ~ 1’ above the top of the pipe? 1. RESPONSE: A detail of the typical chilled water trench has been added to Drawing M-012. EEEE. Does the existing Med “D” Building have a basement in it? Also, after demolition what elevation will the Med “D” Building area be left at? Will the grades in this area be left as shown on sheet C-202.B? 1. RESPONSE: The Med ‘D Building does not have a basement. It is unknown what elevation the ground will be at after demolition of the slab. The final grade for this area is what is shown on C-202.B. UNC-Chapel Hill PERKINS+WILL Marsico Hall 830123.000 Record Documents 08/15/2017 Code: #40722 Item: #302 File: #07-07092-02A Addendum-08 ADDENDUM NO. 8 00 91 13.08 - 16 FFFF. The note “KERFED FRAME” appears at 11 door openings on the door schedule. In the hardware sets there is an item “KERFED FRAME”. The total number of door openings with “KERFED FRAME” in assigned hardware sets is 189. What governs this issue, the door schedule or the hardware sets? 1. RESPONSE: Provide both the “KERFED FRAMES” noted on the door schedule and those noted on the hardware sets. GGGG. Doors 9001A & 9001B are painted aluminum, is this correct? 1. RESPONSE: 9001A & 9001B are painted aluminum doors, non-rated. 9099S is H.M. and rated.