Loading...
HomeMy WebLinkAbout1332-R0002_SMITH AND GERRARD HALLS RENOVATIONS_FINAL REPORT.pdf.I I 1 I ._ I • I J I -1 I , I •• . • I .I I 1 - FINAL REPORT Obj No: 1332-R0002 FINAL REPORT July 22, 2008 '--------·--------- Smith & Gerrard Halls Renovations University of North Carolina at Chapel Hill Chapel Hill, North Carolina SCO ID#000-576-702A PBC +L ARCHITECTURE 333 FAYETIEVILLE STREET, SUITE 1000 POST OFFICE BOX 951 RALEIGH, NC 27601/27602 1337 J I 4 I , I • I ' I .I I t I \ I • I .I I 4 FINAL REPORT July 24, 2008 GERRARD HALL RESTORATION SMITH HALL EXTERIOR RESTORATION UNIVERSITY OF NORTH CAROLINA Chapel Hill, NC SCO ID#000-576·702A Ann Beha Architects 33 Kingston Street Boston, MA 02111 .I I t I ._ I • I J I -1 I , I •• .• I .I I 1 FINAL REPORT GERRARD HALL RENOVATIONS UNIVERSITY OF NORTH CAROLINA at CHAPEL HILL GENERAL DESCRIPTION Gerrard Hall was designed and built in 1822-37 as the College chapel and is one of the oldest buildings on campus. In 1844, a portico designed by A.J. Davis was constructed on the south side of the building, but this was removed in 1901. Gerrard is a small assembly space for both classroom and performance use. It is located on Cameron A venue between Memorial and South Hall. A. Dates 1. 2. 3. 4. 5. 6. 7. Bid Opening Date -------------------------------------- Award Date --------------------------------------------- Pre-Construction Conference ------------------------ Notice to Proceed -------------------------------------- Final Inspection Date---------------------------------- Acceptance Date --------------------------------------- Warranty Expiration Date ----------------------------- B. Building Type April 27, 2006 August 22, 2006 September 8, 2006 September 12, 2006 October 31, 2007 November 14,2007 November 13,2008 Gerrard Hall consists of a single auditorium space on the interior, with two egress stairs and an open balcony on three sides. The main floor accomodates 233 at tables, 390 in seats and 420 standing. The balcony has fixed seating for 174 people. C. Description Exterior Design Gerrard Hall has limewashed masonry walls with brownstone sills and water table. The existing masonry walls were repointed, and brownstone sills and water table repaired or replaced where required. New double-glazed wood windows matching those shown in historic photos have been installed, and a new standing seam copper roof. On the south side, a new three-bay portico incorporating entrance stairs and a ramp was constructed based on the 1844 design. With a new ramp restored doorway, this provides an accessible entrance to the floor. Columns are limestone with Ionic bases and capitals, and stair treads and walls are finished with pre-cast concrete to match the brownstone watertable. An exterior plaza was created between Gerrard Hall and the Campus Y. There are no permits or certificates relative to flood plain policy required to the best of the architect's knowledge . Interior Construction & Finish Gerrard Hall is classified as A-2. The existing construction is classified as Type III-Bin accordance with the North Carolina Builing Code. Final Report -Gerrard Hall University ofNorth Carolina, Chapel Hill Page 1 A crawl space was excavated under the first floor to provide space and access for mechanical equipment. Access is provided via a hatchway and ladder in the mechnical closet at the rear of the auditorium, with a larger hatchway set flush with the stage surface. Flooring and kneewalls of the access are poured concrete. The first floor of the auditorium is existing tongue and groove maple flooring, which was repaired and refinished. Walls and ceiling are existing plaster on metal lath, painted. Columns and trim are faced with painted wood. Two new accessible toilet rooms were provided under the balcony at the rear of the auditorium. These have ceramic tile on floors and walls. Egress stairs have vinyl tile at the floor, treads and landings. The balcony is open to the auditorium, and also finished with existing wood flooring, plaster and paint. Existing steel seating was removed, reupholstered, repainted and reinstalled. Structural [from Stewart] Plumbing Plumbing work consisted of the installation of two single person ADA toilets. A new 2 inch domestic cold water service was connected to the 12 inch water main along Cameron A venue. A 2 inch reduced pressure zone backflow preventer was installed within the building. A new waste and vent piping was installed. A new sanitary building drain was installed and extended 5 feet beyond the building for connection to the campus sanitary sewer system. New plumbing fixtures are commercial grade white vitreous china or enameled cast iron. Water closets are tp.e manual exposed flush valve type. Hot water is provided by point of use electric instantaneous water heaters at each lavatory. Fire Protection Fire protection work consisted of the installation of a hydraulically calculated ordinary hazard group one dry pipe sprinkler system for the entire building, including crawl and attic spaces. A new 6 inch fire service water main was connected to the existing 12 inch water main along Cameron Avenue and extended into the building to the dry pipe valve in the crawl space. A reduced pressure detector type backflow preventer was installed outside the building within an insulated and heated enclosure. Sprinklers are quick response concealed pendents in finished areas and brass uprights and pendents in attic and crawl space. HVAC The existing radiators, including all piping and controls were removed. Two chilled water and hot water air handling units were installed in the crawl space. Excavation was required to provide enough room for the air handling units in the crawl space. Final Report -Gerrard Hall University of North Carolina, Chapel Hill Page2 L I t I t I • I I. I I r I •• •. I L I t I I ._ I • I J I I , I •• } I .I I 1 AHU-1 supplies air to the first floor. AHU-2 supplies air to the second floor. A unit heater was installed in the crawl space. Hot water and chilled water is supplied from the campus utility system. The project has a hot water pump and a chilled water pump. Controls were replaced with a DDC system that is tied to the campus energy management systems. Electrical The existing 120 Volt, 240 Volt single phase electrical service transformer was reused to supply power to Gerrard Hall. A new 300 amp feeder and raceway were provided from the existing transformer through a new electrical meter to a new Main Distribution Panel (MDP) located in the main electrical room. The electrical system located within the Gerrard Hall includes a 300 amp, 120/240 volt single phase, Main Distribution Panel, (1) 120/240 volt single phase, 100 amp, main lug lighting dimming panel and (1) 120/240 volt single phase, 100 amp, main lug panel for power loads within the facility . A new fire alarm system was provided to monitor the facility. A fire alarm panel (F ACP) and digital alarm communications transmitter (DACT) were provided and mounted in the mechanical room. A fire alarm remote annunciator panel (F AAP) was provided at the fireman's entry to the building. Smoke detectors were provided in corridors and utility areas. Duct detectors were provided for the HV AC system. Audio visual devices were provided in all public use areas and fire alarm pull stations were provided within 5 feet of all egress doors. Fluorescent lighting fixtures were provided, typically using T8 lamps or compact fluorescent lamps and electronic ballasts in utility areas. Existing incandescent lighting fixtures were refurbished and reused to accommodate the intended use of the facility as a performance area and to preserve historical elements in the facility. Lighting fixture types vary per area use. All incandescent lighting fixtures were supplied by the new dimming system. All exit signs provided were battery backed LED type exit signs. Battery backed emergency lighting unit equipment was provided for emergency lighting. A raceway system for each tele/data, audio-visual and UNC One-card systems were provided to allow the owner the capacity to add these systems. Power outlets were provided in each of the utility spaces, in the first and second floor theater areas. All raceway systems were concealed in public spaces . Elevator: None Final Report -Gerrard Hall University of North Carolina, Chapel Hill Page3 I I ._ I • I J I I , I •• .• I .I I 1 Structural Final Report -UNC -Gerrard Hall Renovations A. B . c. Design Objectives The primary structural modifications included modifications of the existing structure to support a complete renovation of this building. Elements which affected the structure included the construction of a new crawlspace mechanical corridor with concrete equipment pads, areaways to crawlspace, cast-in-place steps on grade, re-build historic portico with additional handicap access ramp, construction of new stage with removeable panels to access mechanical corridor below, construction of balcony framing over stage area, the upgrade of the existing wood catwalk in attic space, and the addition of anchors to existing roof framing for fall protection system. The Existing Building Structure Roof: The existing roof framing· consists of steel trusses and purlins with a poured in place concrete deck on expanded metal lathe. The steel trusses are supported by the exterior multi-wythe brick walls. Attic/Mechanical Area: The existing attic framing consists of a wood framed catwalk supported by the bottom chords of steel roof trusses. Balcony Floors: The floors of the building are constructed from light framed wood construction. Auditorium floor: The floor is a cast-in place concrete one-way slab and beam system. The structure depth varies with the spans. However the typical depths are as follows: Slab 4 Y2", Beams -12" wide and 20" deep including the slab. The beams are supported by concrete columns that are 12"x12". Crawlspace: The original building area is constructed over a shallow crawl space, +/-3 feet high. All building footings are shallow large stone footings at the exterior walls and isolated column footings ~;~t the interior that bear approximately 18" below finish floor I crawl space floor. · New Construction New Mechanical Corridor: The center of the existing crawlspace was excavated to provide an access corridor for servicing new mechanical equipment in the crawlspace. The access corridor is constructed of a 12" slab on grade with 8" reinforced cantilevered CMU retaining walls on each site of the corridor. Four new concrete equipment pads were provided for the mechanical equipment. New Stage Floor: The area at the existing stage platform was removed and replaced with steel beams and a 5" total thickness concrete slab on metal deck level with the existing auditorium floor slab. D. New Floor Ooeninqs: In areas where openings were larger and required the cutting portions of the existing one-way slab between support beams, steel channels were used to support the slab on each side of the opening. The channels typically spanned between the existing concrete beams. Balcony: The existing balcony framing over the stage between the two stair towers was removed and replaced with new framing. A steel beam spans between the brick load bearing walls of the stair towers to support the interior edge of the balcony framing. This beam also serves as a hoist beam for installation and replacement of the mechanical equipment in the crawlspace under the stage. The balcony floor framing is cold formed light gauge metal stud joists with 3/4" plywood. Portico: The portico roof is constructed of light-gauge roof trusses supported by a series of steel beams and posts which connect to the existing multi-wythe brick wall and new loadbearing sandstone columns. The loadbearing columns are supported by concrete pedestals and footings. A structural slab on grade with handicap ramp access and steps on the other two sides serve as the main access to the building. Attic Space: The existing wood framed catwalk was upgraded by providing additional framing and additional attachment of the existing and new framing to the bottom chords, increasing the width to 48", and providing a wood guardrail. The catwalk serves for access to the equipment panels and for the performance of routine maintenance. Design Criteria Applicable Codes: 2002 North Carolina State Building Code (2000 IBC with revisions) Building Code Requirements for Structural Concrete (ACI 318-99) Building Code Requirements for Masonry Structures (ACI 530-99) AISC Manual of Steel Construction, ASD, ninth edition (1989) American Welding Society d1. 01-90 Min Design Loads for Buildings and Other Structures (ASCE 7-98) National Design Specification for Wood Construction (NDS 1997) Cold Formed Steel Design Manual (AISI 1996) Applicable Loads: Design Uve Loads: Roof ....................... 20 psf (for analysis purposes) Public areas, lobbies .......... 100 psf (for analysis purposes) Corridors 2nd and above ....... 80 psf (for analysis purposes) Corridors ground ............. 100 psf (for analysis purposes) Stairs ...................... 100 psf (for analysis purposes) Catwalk ................ 60 psf (for analysis purposes) Wind load: (2002 North Carolina Building Code/IBC) basic design wind velocity .... 95 mph occupancy classification ..... Category I exposure category ........... B importance factor ........... 1.0 L I t I r I • I I. I I r I •• •. I L I I I ._ I • I J I el I , I •• •• I I 1 Seismic load: (2002 North Carolina Building Code/IBC) design method: equivalent lateral force procedure SDs ................ 23.9 SDl. ............... 16.7 importance factor ......... 1.0 seismic design category ...... C Site dass ................. D (Assumed) Future loads: Unless specifically noted, no provisions will be made for future floors, roofs, or other loads. Foundations: New foundation design was based on the presumptive allowable soil bearing pressure of 2,500psf. EXHIBIT A-SQUARE FOOTAGE Floor Room# Description 1 111 Bathroom 1 112 Vestibule 1 113 Storage 1 114 Vestibule 1 115 Bathroom 1 116 Auditorium 1 119 Stage 1 120 Electrical Closet 1 121 Storage Bale. 211 Main Balcony 212 Balcony 213 Electrical Closet Final Report -Gerrard Hall University ofNorth Carolina, Chapel Hill SF Total Net per Level 54 56 40 56 54 1425 140 100 40 1965 1230 120 30 1380 3345 Total Gross per Level Page4 L I t I r I • I I. I I- I r I •• •• I L I t ----- I Exhibit B I Exhibit B • Cost Data Smith & Gerrard Halls Renovations I UNC-CH SCO ID#000-576-702A Architect of Record: Ann Beha Architects, Inc. I Original Contract Final Contract Percent of I Contract Sum Additions Deductions Sum Total Cost Construction Cost General $1,903,241 $86,045 $59,060 $1,930,226 67% I Plumbing/sprinkler $116,000 $41,107 $0 $157,107 5% HVAC $240,009 $4,557 $0 $244,566 8% Electrical $165,180 $23,969 $0 $189,149 7% I Subtotal Construction $2,424,430 $155,678 $59,060 $2,521,048 88% Design Fee I Gerrard Hall Original $186,788 $186,788 Amendment#1 $6,000 $0 $6,000 I Amendment#2 $7,100 $0 $7,100 Amendment#3 $31,120 $0 . $31,120 Smith Hall I Original $116,036 $116,036 Amendment#1 $4,500 $0 $4,500 Amendment#2 $6,180 $0 $6,180 I Subtotal Design $302,824 $54,900 $0 $357,724 12% I Total $2,727,254 $210,578 $59,060 $2,878,772 100% I Cost per Net SF $860.62 I I I I I I Page 1 .I Exhibit C I Exhibit C -Change Orders Smith & Gerrard Halls Renovations t UNC-CH sea ID#000-576-702A Architect of Record: Ann Beha Architects, Inc. I Change Description Change Order Net Change Order Net NET Change Order No Add Deduct ._ G#1 Additional abatement of piping insulation $1,683 Delete steel at catwalk and provide ($14,806) I HVAC grill revision at area below balconies $273 Total CO G#1: $1,956 ($14,806) ($12,850) • G#2 Adjust project duration to reflect Addenda $0 I Total CO G#2: $0 $0 $0 G#3 Modify duct layout at attic space to $1,509 J Omit shaft wall material in attic above Stair ($921) I Waterproofing in crawl space $8,592 Unsuitable soil at portico $3,435 el Add'l sprinkler heads in the ceiling/framing $4,029 Request for time extension due to rain $0 I Total CO G-3 $17,565 ($921) $16,644 G#4 Add'l wood window repairs $8,834 , Modify plenum for slot diffusers under $930 I Change AHU control valves from 3-way to $0 Changing CW bridge control valve per $0 • I Install wood trim at projection screen $1,908 Request for time extension due to changes $0 •• Total CO G-4 $11,672 $0 $11,672 G#5 Add lights in the attic per Owner's request. $3,481 I Provide add'l outlet and circuit for hot & $4,793 Replace wooden column bases at Smith $28,667 .I Supply Laptop controls computer in lieu of $1,175 Total CO G-5 $38,116 $0 $38,116 I 1 Page 1 Exhibit C L Exhibit C -Change Orders I Smith & Gerrard Halls Renovations UNC-CH t SCO ID#000-576-702A Architect of Record: Ann Beha Architects, Inc. Change Description Change Order Net Change Order Net NET Change I Order No Add Deduct G#6 Repair stone base with repair mortar in lieu $6,073 t electrical additions associated with RFI #70 $7,010 Electrical additions associated with design $834 I Repair levelness of existing stairpans for $751 • Smith Hall termite treatment $2,856 I Total CO G-6 $17,524 $0 $17,524 G#7 Install additional hom strobe In attic of $2,595 I. Install additional smoke detector in second $3,341 Re-install FDC connection $4,211 I Install sprinkler backflow preventor $32,867 skim and patch existing plaster walls $2,166 • Replace chimney on Smith Hall $3,248 I Total CO G-7 $48,428 $0 $48,428 G#8 cut and repair existing chilled water lines $1,600 r Install fire rated ceiling hatch at access to $1,013 Install new projector enclosure at Gerrard $1,915 I Credit to delete outside pressure washing ($1,553) • Total CO G-8 $4,528 ($1,553) $2,975 I G#9 Restocking fees for backflow preventor and $15,889 Total CO G-9 $15,889 $0 $15,889 •• G#10 Credit for unused Contract Allowances ($41,780) Total CO G-10 ($41,780) $0 ($41,780) I Project totals $113,898 ($17,280) $96,618 L I Page2 t .I I t I ._ I • I J I el I , I •• •• I .I I 1 Exhibit D -Subcontractors & Suppliers Smith & Gerrard Halls Renovations UNC-Chapel Hill SCO ID# 000-576-702A Architect of Record: Ann Beha Architects, Inc. See Attached Sheets .I I t I ._ I • I J I -1 I , I •• •• I .I I 1 Subcontractors & Suppliers Renovations to Gerrard & Smith Renovation, UNC-CH H.M. Kern Corporation Project #689 SUBCONTRACTORS 84351 Anderson-Wells Floorscapes POBox 178 Burlington, NC 27216-0178 Stephen Day P: 336-222-0801 F: 336-222-1241 • Section 09310 -Ceramic Tile 84352 Apex Steel 301 Petfinder Lane Raleigh, NC 27603 P: 919-362-6611 F: 919-362-6664 • Section 05120-Structural Steel • Section 05310 -Steel Deck • Section 05500-Metal Fabrications • Section 05530-Gratings S4455 Associated Scaffolding P0Box2129 Durham, NC 27702 Darren Spiker P: 919-682-2655 F: 800-768-2655 C: 919-630-4181 Physical Address: 1107 East Geer Street Durham, NC 27704 • Scaffolding & Shoring (Smith Hall) 84365 Baker Roofing Company POBox26057 Raleigh, NC 27611 Chris Brackin P: 919-828-2975 F: 919-256-2281 • Section 07612-Sheet Copper Roofing • Section 07620-Sheet Metal Flashing & Trim • Section 07900 -Joint Sealers, as pertains to roofing Z:\ALWA TA'PROJI689\MISCI689 Sub Vend Ust.doc 712112008 Subcontractors & Suppliers Renovations to Gerrard & Smith Renovation, UNC-CH H.M. Kern Corporation Project #689 84353 Bryant-Durham Services, Inc. 5102 Neal Road Durham, NC 27715 Harold Liberty P: 919-383-9227 F: 919-382-2836 • Section 02069-UNC Selective Demolition • Section 02070 -Selective Site Demolition • Section 16000-Summary of Electrical Work • Section 16010-Basic Electrical Requirements • Section 16015-Testing and Placing in Service • Section 16030-Reworking Existing System • Section 16035-Temporary Power and Lighting • Section 16045 -Electrical Related Work • Section 16046-Concrete Equipment Pads • Section 16055-Through-Penetration Firestop Systems • Section 16110-Raceways • Section 16120-Secondary Voltage Wires and Cables • Section 16135-Electrical Boxes and Fittings • Section 16142-Electrical Connections for Equipment • Section 1614 3 -Wiring Devices • Section 16170-Circuit and Motor Disconnects • Section 16180-Combination Motor Starters • Section 16190-Supporting Devices • Section 16195 -Electrical Identification • Section 16452-Grounding • Section 16470-Panelboards • Section 16500-Lighting Fixtures and Light Fixture Restorations • Section 16718 -Pre-Set Lighting Dimming Systems • Section 16721 -Fire Alarm Systems • Section 16741-Telephone Raceway System 84354 Capital Restoration & Waterproofing, Inc. 618 Chambers Ferry Road Edenton, NC 27932 Keith Harrison P: 252-333-2428 F: 252-482-8930 E-mail: keith@capitalrestorations.com • Section 04910-Masonry Restoration Z:W.LDATA\PROJ\689\MfSC\689 Sub Vend Ustdoc 712112008 L I t I r I • I I. I I- I r I •• •• I L I t .I I 1 I ._ I • I J I -1 I , I •• •• I .I I 1 Subcontractors & Suppliers Renovations to Gerrard & Smith Renovation, UNC-CH H.M. Kern Corporation Project #689 84392 Carolina Stone Setting Company POBox 156 Cary, NC 27512 W. Brian White P: 919-467-4692 F: 919-467-4660 Physical Address: 10315-B Chapel Hill Road Morrisville, NC 27560 • Section 04413-Limestone 84355 Clean Air Environmental, Inc. POBox 12517 Winston-Salem, NC 27117 Ricky Delgado P: 336-788-2901 F: 336-788-2902 E-mail: cleanairinc@bellsouth.net Physical Address: 2500 Old Lexington Rd., Suite B Winston-Salem, NC 27107 • Section 01570-UNC Construction Waste Management • Section 02069 -UNC Selective Demolition, as pertains to Hazardous Material Abatement • Section 02080 -Hazardous Materials 84356 Doug Middleton Associates, Inc. 5011 Laurel Grove Lane Weddington, NC 28104 Ken Middleton P: 704-846-4900 F: 704-846-4997 • Section 1291 0 -Auditorium Seating Restoration 84357 Eatman's Carpets P0Box30639 Raleigh, NC 27622 Woody Eatman P: 919-782-6010 F: 919-782-9414 • Section 09653 -Resilient Tile Flooring Z:\ALLDATAIPROJ\6B91MISC\689 Sub Vend Ust.doc 712112008 Subcontractors & Suppliers Renovations to Gerrard & Smith Renovation, UNC-CH H.M. Kern Corporation Project #689 84401 Frye Fence Company, Inc. 3221 Durham Drive, Suite 115 Raleigh, NC 27603 James Frye P: 919-779-4700 F: 919-779-7667 • Construction Fencing 84385 Hawkins Plastering POBox696 Morrisville, NC 27560 Marcus Hawkins P: 919-380-8644 F: 919-380-2900 • Section 09100-Metal Support Assemblies • Section 09200 -Portland Cement Plaster • Section 09281-Plaster Patching & Repair • Work in Smith Hall Only. 84358 HFD Construction Company 1005 Forge Road Durham, NC 27713 Harry Dixon P: 919-544-3090 F: 919-484-1253 C: 919-302-7261 • Section 02220-Sediment & Erosion Control • Section 02665-Water Systems • Section 02720 -Site Drainage • Section 02730 -Sanitary Sewerage 84567 High Rock Waterproofing, Inc. 472 Grimes Boulevard Lexington, NC 27292 Jeff Welty P: 336-956-1184 F: 336-956-6491 Z:IALWA TA\PROJ\689\M/SC\689 Sub Vend Ust.dor;; 712112008 L I t I r I • I I. I I- I r I •• •• I L I t .I I t I ._ I • I J I -1 I , I •• •• I .I I t Subcontractors & Suppliers Renovations to Gerrard & Smith Renovation, UNC-CH H.M Kern Corporation Project #689 • Division 7 -Thermal & Moisture Protection, as pertains to waterproofing basement CMU walls 84573 Jerry Pyron P0Box246 Pelham, NC 27311 Jerry Pyron P: 336-939-7453 • Section 08550-Wood Windows (Installation) S4386-CONTRACT CANCELLED Leonard Hill Plastering 4810 Belford Road Fayertevi11e, NC 28314 Leonard Hill P: 910-867~3862 F: 910-867-3862 • Section 05400-Cold-Formed Metal Framing • Section 09100-Metal Support Assemblies • Section 09213 = Gypsum Veneer Plaster • Section 09220 -Portland Cement Plaster • Section 09261-Shaft Wall Systems • Section 09281 -Plaster Patching & Repair • Work in Gerrard Hall Only 84359 M & M Industrial Plumbing POBox28207 Raleigh, NC 27611-8207 Gerry Loehfelm P: (919) 661-8026 F: (919) 662-7439 Physical Address: 8537 Applecross Circle Apex, NC 27539 • Section 15000-Summary of Mechanical Work • Section 15010 -Basic Mechanical Requirements • Section 15045-Through-Penetration Firestop Systems • Section 15046-Excavating for Mechanical Work • Section 15048 -Access Doors and Panels • Section 15060-Pipes and Pipe Fittings ZiALWA TA 'PROJ\689\M/SC\689 SubVend List. doc 712112008 Subcontractors & Suppliers Renovations to Gerrard & Smith Renovation, UNC-CH H.M. Kern Corporation Project #689 • Section 15100-Valves • Section 15120-Piping Specialties • Section 15125-Expansion Compensation • Section 15140 -Supports, Anchors, and Vibration Isolation • Section 15190 -Mechanical Painting and Identification • Section 15250-Mechanical Insulation • Section 15411-Water Distribution Piping • Section 15412 -Soil, Waste, Vent, and Roof Drainage Systems • Section 15440 -Plumbing Fixtures • Section 15453-Plumbing Pumps • Section 15458-Water Heaters • Section 15510-Water Piping Systems 84579 Professional Concrete Cutting POBox323 Gamer, NC 27529 Bryan Lipscomb P: 919-771-1977 F: 919-771-1975 M: 919-995-6490 • Section 02070 -Selective Site Demolition, as pertains to removal of limestone beams 84443 Reliant Painting Company 1440 S. Briggs Avenue Durham, NC 27703 Kenneth Walsh P: 919-596-0790 F: 919-596-0770 • Painting • Joint Sealants, as related to painting 84360 Royalwood Associates, Inc. PO Box 91145 Raleigh, NC 27675 P: 919-957-3006 F: 919-957-3007 Physical Address: 7421 ACC Boulevard Raleigh, NC 27617 • Section 09648 -Wood Strip Flooring Z:IALLDATAIPROJ\689\M/SC\689 SUbVend Ustdoc 7/2112008 L I t I r I • I I. I I- I r I •• •• I L I t .I I 1 I ._ I • I J I -1 I , I •• ) I .I I 1 Subcontractors & Suppliers Renovations to Gerrard & Smith Renovation, UNC-CH H.M. Kern Corporation Project #689 84578 Ruston Paving Company, Inc. 3874 South Alston Avenue Durham, NC 27713 KevinMaira P: 919-544-1288 F: 919-544-1255 • Section 02511-Asphalt Paving 84361 Sunland Fire Protection, Inc . POBox277 Jamestown, NC 27282 Mark Snyder P: 336-886-7027 F: 336-886-7024 Mark.snyder@sunlandfire.com • Section 15140-Supports, Anchors, and Vibration Isolation • Section 15300 -Building Sprinkler Systems 84469 Triad Upfits, Inc. 962 Patterson Grove Road Ramseur, NC 27316 Terry Hollady P: 336-824-4273 F: 336-284-1440 Email: triadupfitsinc@earthlink.net • Section 05400-Cold Formed Metal Framing • Section 09100 -Metal Support Assemblies • Section 09213 -Gypsum Veneer Plaster • Section 09261-Shaft Wall Systems 84362 Watco Corporation P0Box2239 Gamer, NC 27529 Alan Middleton P: (919) 772-7191 F: (919) 772-1458 Physical Address: 14 31 Mechanical Boulevard Garner, NC 27529 Z:IALLDATA 'IPROJ\689\MfSC\689 Sub Vend Ustdoc 712112008 Subcontractors & Suppliers Renovations to Gerrard & Smith Renovation, UNC-CH H.M. Kern Corporation Project #689 • Section 15000-Summary of Mechanical Work • Section 150 I 0 -Basic Mechanical Requirements • Section 15030-Electrical Provisions for Mechanical Work • Section 15045-Through-Penetration Firestop Systems • Section 15046-Excavating for Mechanical Work • Section 15048-Access Doors and Panels • Section 15060 -Pipes and Pipe Fittings • Section 15100-Valves • Section 15120 -Piping Specialties • Section 15125-Expansion Compensation • Section I 5 I 40 -Supports, Anchors, and Vibmtion Isolation • Section 15190 -Mechanical Painting and Identification • Section 15250 -Mechanical Insulation • Section 15300-Building Sprinkler Systems • Section 15411 -Water Distribution Piping • Section 15412-Soil, Waste, Vent, and Roof Drainage Systems • Section 15440 -Plumbing Fixtures • Section 15453 -Plumbing Pumps • Section 15458-Water Heaters • Section 15510-Water Piping Systems • Section 15515 -Buried Piping Heating and Cooling Distribution • Section 15540-HVAC Pumps • Section 15545-Variable Frequency Controllers for HV AC Motors • Section 15830-Terminal Heating Units • Section 15840 -Coils • Section 15855-Air Handling Units • Section I5860-Fans • Section 15885 -Air Filters • Section 15891 -Ductwork and Apparatus Casing • Section 15900 -Building Control System Integration • Section 15901-Building Control Systems and Networks • Section 15902-Control Valves and Dampers • Section 15903 -Control Instrumentation • Section 15910 -Ductwork Accessories • Section 15932 -Air Outlets and Inlets • Section 15990-Testing, Adjusting, and Balancing 84363 William E. Smith 1818 Marion's Ford Road Chapel Hill, NC 27516 William (Smitty) Smith Z:IALLDATA\PROJ\689\M/SC\689 Sub Vend Ust.doc 712112008 L I t I r I • I I. I I- I r I •• •• I L I 1- .I I 1 I ._ I • I J I -1 I , I •• .• il .I I 1 Subcontractors & Suppliers Renovations to Gerrard & Smith Renovation, UNC-CH H.M. Kern Corporation Project #689 P: 919-929-4491 F: 919-933-0825 • Section 02780-Unit Pavers • Section 04810-Unit Masonry Assemblies SUPPLIERS P2064 Adams Products Company POBox 189 Mooresville, NC 27560 Larry Smythe P: 919-427-4787 P: 919-467-2218 F: 919-467-9113 Physical Address: 5701 McCrimmon Parkway Morrisville, NC 27560 • Section 04 720 -Cast Stone • Section 04810 -Masonry P2092 Beeson Sign Company 115 Adams Street Kernersville, NC 27284 Chris P: 336-993-5617 F: • Job Sign P2075-PURCHASE ORDER CANCELLE 09/21/06 Canco Waste Management, Inc. 1101 Ellis Road Durham, NC 27703 Jon Bowman P: 919-957-0877 F: 919-957-1898 • Dwnpster P2065 Chandler Concrete Company, Inc. Z:IAU.DATAIPROJ\689\M/SC\689 SubVend Ust.doc 7/21/2008 Subcontractors & Suppliers Renovations to Gerrard & Smith Renovation, UNC-CH H.M. Kern Corporation Project #689 POBox 131 Burlingto~ NC 27216 Jimmy Owen P: 919-644-0143 P: 336-226-1181 F: 336-570-0557 P2066 Garland Woodcraft Company, Inc. PO Box 11068 Durham, NC 27703 Charles Delionbach P: (919) 596-8236 F: (919) 596-5077 Physical Address: 451 S Driver St Durham, NC 27703 • Section 06200 -Finish Carpentry P2087 Legacy Millwork Specialties 105 Highway 54 West, Suite 269 Homestead Market Shopping Center Durham, NC 27713 Joe Hamer P: 919-361-0089 F: 919-361-9341 • Section 08550-Wood Windows P2067 Martin Architectural Products, Inc. POBox3249 Cary, NC 27519-3249 Greg Snider P: 919-469-9661 F: 919-469-9630 • Section 08115 -Steel Door Frames • Section 08212-Flush Wood Doors • Section 08216-Stile and Rail Wood Doors • Section 08710 -Door Hardware • Section 10520 -Fire Protection Specialties • Section 1081 0 -Toilet Accessories Z:IALLDATA\PROJ\689\M/SC\689 SubVend Llstdoc 712112008 L I I- I r I • I I. I I- I r I •• •• I L I 1- .I I 1 I ._ I • I J I -1 I , I •• •• I .I I 1 Subcontractors & Suppliers Renovations to Gerrard & Smith Renovation, UNC-CH H.M. Kern Corporation Project #689 P2083 Piedmont Portables POBox 1957 Burlington, NC 27216 Beth Thomas P: 336-437..0534 F: 336-437-0538 • Temporary Toilets P2080 Proven Products, Inc . POBox6187 Kinston, NC 28501 Nancy Philyaw P: 252-527-8074 F: 252-527-9421 E-mail: proven@icomnct.com Physical Address: 2520 Banks School Road Kinston, NC 28501 • Section 11132-Projection Screens P2084 Rockingham Steel, Inc. POBox 1347 Harrisonburg, VA 22803 P: 540-433-3000 F: 540-389-4971 • Section 03300-Cast In Place Concrete, as pertains to concrete reinforcements P2086 Waste Industries 3741 Conquest Drive Gamer, NC 27529 Terri Burdick P: 919-662-7100 F: 919-773-0503 • Dumpster R & R Concrete, Inc. 6701 Walnut Ridge Road Z:\ALLDATAIPROJ\689\M/SC\689 SubVend Ust.doc 712112008 Subcontractors & Suppliers Renovations to Gerrard & Smith Renovation, UNC-CH H.M. Kern Corporation Project #689 Gibsonville, NC 27249 Bobby Rumley P: 336-656-7615 F: 336-656-7615 Z:\ALLDATA\PROJ\689\MISC\689 SubVend List. doc 7121/2008 L I t I t I • I I. I I- I r I •• .. I L I t .I I 1 I ._ I • I .J I I , I • I ) I I 1 Exhibit E -Electrical Load Summary Smith & Gerrard Halls Renovations UNC-Chapel Hill SCO ID# 000-576-702A Architect of Record: Ann Beha Architects, Inc. See Attached Sheets .a. -a. -·--· -.a -.a. -'--·-_, -.a -a. ELECTRICAL LOAD SUMMARY SCC001 LOAD kVA AMP/PHASE UGHliNG 6.8 28 RECEPTACLE 10.8 45 MECHANICAL 28.2 118 . . . . . . . TOTAL 45.8 191 LOAD SUMMARY ~~OTES: 1. LOAD kVA VALUES ARE TOTAL OVER ALL THREE PHASES. 2. LOAD CURRENTS ARE EQUALLY DISTRIBUTED EQUALLY OVER ALL THREE PHASES AT THE THE SUPPLY VOLTAGE. ENERGY SUMMARY Prescriptive D Performance • Energy Cost Budget D Provide a standard riser diagram which indicates designated points for check metering. Provide a standard panel schedule which identifies different enduse loads. Lighting Schedule Lamp type required in fixture Number of lamps in fixture Ballast type used in the fixture Number of ballasts in fixture Total wattage per fixture Total interior wattage specified vs. allowed Total exterior wattage specified vs. allowed SEE FIXTURE SCHEDULE SEE 8XTURE SCHEDULE SEE 8XTURE SCHEDULE SEE 8XTURE SCHEDULE SEE 8XTURE SCHEDULE 5,255W DESIGNED vs. 10,394 ALLOWED ALL EXTERIOR FIXTURES MEET EFFICACY REQUIREMENTS Equipment Schedules with Motors (not used for mechanical systems) Motor horsepower Number of phases Minimum efficiency Motor type Number of poles N/A N/A N/A N/A 19 -p -.--. -IIIII -.,. -,_ -.--It -19 -p ....... ---~-- ID BBG'ULAl\ WITH S' VAN SPACES WITH 8' ACCBSSIBLB AL"CBSS .AISLB ACCBSS AISLB 1 none 1 APPROVALS 1t of Insurance, SBCCI, ICC, etc., describe below) ~BLE 719.1(2) )8 POA VARIOUS WALLS AND PARTmONS a,o,p MINIMUM PINISHBD THICI<NUS , FAc:n!;:c• IONSTRUmiON 4hour :I hour 2hour 1 1 hour 6 4.9 3.S 2.7 s.o 4.3 3.4 2.3 ntecl with perlita VermiCilllte or 6.6 s.s 4.4 3.0 percent solid backed with a 3/4 • thick formo6 tJom 0.021 11 wall on 24" centm wilh 5<1 X gypsum wallboani• altGChed --- ·long 'JYpl'l S screws spaced 8" .a--·-_,-.a -I.· MECHANICAL SUMMARY MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENT Method or CompHanee [&! Prescriptive 0 Energy Cost Budget Thermal Zone · winter dry bulb summer dry bulb Interior design conditions w:inter dry bulb summer dry bulb relative humidity BuilcUng heating load Bulldtng coollng load 7A 16F 93F 70F 75F SO% 350MBH 2STONS MeehaDical Spacing Conditioning System· Unitary REFER TO EQUIPMENT ,____SCHEDULES ON SHEET H5.0 AND SPECIFICATIONS description of unit heating efficiency cooling efficiency heat output of unit cooling output ofunit Boiler ----' total boiler output. If oversized, state reason. N/A.CAMPUS UTIT..ITIBS Chiller total chiller capacity. If oversized, state reason. NIA CAMPUS UTILITIES List equipment efttclencles Equipment schedules with motors (mechaDical systems) ~ motor horsepower number of phases mhrlnnun etliciency motor type #ofpoles REFER TO EQUIPMENT SCHEDULES ON SHEET H5.0 AND SPECIFICATIONS I I I I I I I I I I I I I I I I I I Section 326 CERTIFICATE OF COMPLETION PROJECT: Smith & Gerrard Halls LOCATION: Chapel Hill. North Carolina SCO 10 NUMBER: 000.576. 702A BUDGET CODE#:40073 ITEM#:309 DATE: August 8. 2008 OWNER: University of North Carolina at Chaoel Hill DESIGNER: Ann Beha Architects PRIME CONTRACTOR:...!..H~M:.!....!K~e~m!.J....._ _________________ _ I (we) certify that the work on the above·referenced project has been completed according to the plans, specifications, addenda and approved change orders and that the project Is ready for owner occupancy. The Final Inspection was made on October 31 2007. The guarantee period begins on November 14 ·2001, and shall terminate on November 14 2008. The contractors report that final payments have been made to all material suppliers, employees and subcontractors; was included with final request for payment Builders' risk Insurance was cancelled as of November 15 2007, and a copy of the Cancellation Notice is attached hereto. The total time for completion, as allowed in the contract plus granted time extensions, is 429 days. The actual time required for completion was 429 days, and the contractor is not liable for liquidated damages. Copies of the following Items are attached as indicated below: Written guarantees: All warranties included in the general 0 & M Manual previously transmitted to the Owner. Affidavits: Contractor's Affidavit of Release of Liens Contractor's Affidavit of Payment of Debts and Liens Consent of surety company to final payment: YES Manuals of operation instructions: General Construction. Plumbing. Mechanical and Electrical (See transmittal) I Certificate of completion I , I I I 'I I I I I I I I I I I I I I I SECTION324 CERTIFICATE OF COMPLIANCE PROJECT: Smith Hall & Gerrard Hall Renovations LOCATION: CHAPEL HILL, NORm CAROLINA BUDGET CODE: 40073 ITEM: 312 OWNER: UNC-CHAPEL HILL SCO ID# 000.576. 702A TYPE OF CONTRACT: SINGLE PRIME FINAL AMT: $2.521,048 DATE OF FINAL ACCEPTANCE: November 11. 2007. CONTRACTOR: HM Kern I (we) certify that the structural work on the above-referenced project has been inspected in accordance with Chapter 133, Article 1, of the General Statutes, and that: ( 1) The inspections of the construction, repairs or installations have been conducted with the degree of care and professional skill and judgment ordinarily exercised by a member of my (our) profession; and (2) To the best of my (our) knowledge, and in my (our) professional opinion as an engineer, the contractor has fulfilled the obligations of such plans, specifications and contract. Pamela W. Hawkes Designer Principal Title State of (\')q~s ttc k<&Jc.lttounty of S q_ F~l ( Subscribed and sworn to befure me this~ day of NotaryPublica.? tf ~ My Commission Expires: 8' -jO-J.O/ ~ ~ CHARLENE A. CAMPBELL Notary Public Cn!IIJIIOnWeallh afMuscluJseUs M)· Commlaslon Explrea ALifjUSt 10,2012 (S84L) . I I I I I I I I I I I I I I I I I I As-Built Drawings: Yes Final Report: Yes Other required closing· papers of the contractor: Test and Balance Report (Transmitted to Owner under separate cover) There are no unsettled disputes·between the Owner and Contractor, Owner and Designer, or the Designer and Contractor at this time. ~ Designer I Certificate of Completion I 1 I ._ I • I J I I , I • I •• I I SECTION 324 CERTIFICATE OF COMPLIANCE PROJECT: Gerrard Hall/Smith Hall Renovations LOCATION: UNC-Chapel Hill BUDGET CODE: N/ A SC0#:00057 6702A SW#=-04...:...:0=5"--'-2=-1,_-=00,_--=04--'---------- 0WNER: UNC-Chapel Hill TYPEOFCONTRACT:-=S~in~g=le~P~r~im~e=--------------------------------------- DA TE OF FINAL ACCEPTANCE: _:...::N=ov.=....:e=m"'-"b=e=-r_,1'-'4'-L-..=2=0-=0-=--7-___________ _ CONTRACTOR: H.M. Kern -General Contractor/Piumbing-M & M Plumbing I certify that the plumbing portion of work on the above-referenced project has been inspected in accordance with Chapter 133, Article 1, of the General Statutes, and that: ( 1 ) The inspections of the construction, repairs or installations have been conducted with the degree of care and professional skill and judgment ordinarily exercised by a member of my profession; and (2) to the best of my knowledge, and in my professional opinion as an architect or engineer, the contractor has fulfilled the obligations of such plans, specifications and contract. Signed this 7th day of March, 2008. W. Michael Pollard, PE Designer Plumbing Engineer of Record Title State of North Carolina, County of _ _,._WX->!!<Li~~~t...---___ --=--- Subscribed and sworn to before me this Int. day of W'latt:h 20Cl . Notary Public: ~ ~.., Wil{)A~ My Commission~ lrptil tl 1 .,.II :\,,,,,,,~,~~'~'''~ #" ~\~:~ ~ e· ········· 6' ~ ~ \. ••• y •••• ~ ::::;:: ... ..~ .. . '::::. :::: • ~r \ ... ':::-. -CI,)·o ·""'-=-= '·= = a: : .:e: .._CJ : z = . ::: ,.rt" ~ ... :-• ::: --~· a:v •,)..ea;:: ~ cJ •.. p\)Y •• •• f.... ~ ~ ... .. ~ ~ ~ /1v. ••••••••• ~' ~ ~11, ~/(E cO:\\~ r1111111Ulll\\\\\\'\ .I I 1 I ._ I • I J I el I , I • I . • I SECTION324 CERTIFICATE OF COMPLIANCE PROJECT: Gerrard Hall Renovation LOCATION: University of North Carolina, Chapel Hill, NC BUDGET CODE: 40073 ITEM: 309 OWNER: University of North Carolina at Chapel Hill TYPE OF CONTRACT: Single Prime FINAL AMT: $2,521,048.00 DATE OF FINAL ACCEPTANCE: 11/14/07 CONTRACTOR: H.M. Kern Corporation I (we) certify that the structural work on the above-referenced project has been inspected in accordance with Chapter 133, Article 1, of the General Statutes, and that: ( 1) The inspections of the construction, repairs or installations have been conducted with the degree of care and professional skill and judgment ordinarily exercised by a member of my (our) profession; and (2) To the best of my (our) knowledge, and in my (our) professional opinion as an engineer, the contractor has fulfilled the obligations of such plans, specifications and contract. Signed this __ 12_ day of_June 2oc& . , ~?-:2:$ Robert T. Macia, PE Vice President Structural Department Manager Stewart Engineering, Inc . State of North Carolina County of ----''M"-!......Co..::....=..:.k....J:e .... /~----------- Subscribed and sworn to before l~-+h day of \Jure Notary Public: ~_J_.:_:· ~~~~~~~.,..__ ____ _ I 1 I ._ I • I J I I , I •• •• I .I I 1 SECTION 324 CERTIFICATE OF COMPLIANCE PROJECT: Gerrard Hall/Smith Hall Renovations LOCATION: UNC-Chapel Hill BUDGET CODE: N/A SC0#:000576702A SW#=O...!..C40=5~-..,_21_._--=00""--=0_.!..C4 _______ _ OWNER: UNC-Chapel Hill TYPEOFCONTRACT:-=S=in~g~le~P~r~im~e ______________________________________ _ DATE OF FINAL ACCEPTANCE: --~NC!:!.ov~e:!.!m.!.!.b!:!.!e:!_!r_1!....::4~2~0~0~7 ________________ _ CONTRACTOR: H.M. Kern -General Contractor/HVAC-Watco I certify that the HVAC portion of work on the above-referenced project has been inspected in accordance with Chapter 133, Article 1, of the General Statutes, and that: ( 1 ) The inspections of the construction, repairs or installations have been conducted with the degree of care and professional skill and judgment ordinarily exercised by a member of my profession; and (2) to the best of my knowledge, and in my professional opinion as an architect or engineer, the contractor has fulfilled the obligations of such plans, specifications and contract. Signed this 7th day of March, 2008. Kenneth R. Wehner, PE Designer HV AC Engineer of Record Title State of North Carolina, County of ~UJ~~=7-:~~=t_.:::..__----­ Subscribed and sworn to before me this ''fll. day of I'Yiatt:h Notary Public: C~/df,u...._:. My Commission ExPireS: til QlO II 2001 . I 1 I , I • I J I I , I •• •• I .I I 1 SECTION 324 CERTIFICATE OF COMPLIANCE PROJECT: Gerrard Hall/Smith Hall Renovations LOCATION: UNC-Chapel Hill BUDGET CODE: N/A SC0#:000576702A SW#=0-'-'40=5=<--=-21-'----=00"'--__,0_,_4 _______ _ OWNER: UNC-Chapel Hill TYPEOFCONTRACT:~S~in~g=le~P~r~im~e ______________________________________ _ DATE OF FINAL ACCEPTANCE: _.!.::!N~o~ve~m~be~r_1~4!J..•...!!:2~0~0~7 _______________ _ CONTRACTOR: H.M. Kern -General Contractor/Electrical-Bryant Durham Electric I certify that the electrical portion of work on the above-referenced project has been inspected in accordance with Chapter 133, Article 1, of the General Statutes, and that: ( 1 ) The inspections of the construction, repairs or installations have been conducted with the degree of care and professional skill and judgment ordinarily exercised by a member of my profession; and (2) to the best of my knowledge, and in my professional opinion as an architect or engineer, the contractor has fulfilled the obligations of such plans, specifications and contract. Signed this 1Oth day of March, 2008. H. Daniel Robertson, Jr., PE Designer Electrical Engineer of Record Title State of North Carolina, County of __ t,M=---=-~-=-=--------- Subscribed and sworn to before me this /() 7.!:t day of /lnar<Jt Notary Public: ~U/Ldi(J..L My CommissionE~i\(ul'l t/f. c9t>ll , 20/JB.... I 1 I ._ I • I J I -1 I , I •• •• I .I I 1 SECTION 324 CERTIFICATE OF COMPLIANCE PROJECT: Gerrard Hall/Smith Hall Renovations LOCATION: UNC-Chapel Hill BUDGET CODE: N/A SC0#:000576702A SW#_,_04....._,0=5,_,-2,__1,_-0=0~-=04..!...,__ ______ _ OWNER: UNC-Chapel Hill TYPEOFCONTRACT:~S~in~g~le~P~r~im~e~------------------------------------- DA TE OF FINAL ACCEPTANCE: __ ,_,N=ov=e=m"'"-"b=e=r---'1,_4~2=0'-"'0-<-7 ____________ _ CONTRACTOR: H.M. Kern -General Contractor/Fire Protection-Sunland Fire Protection I certify that the fire protection portion of work on the above-referenced project has been inspected in accordance with Chapter 133, Article 1, of the General Statutes, and that: ( 1 ) The inspections of the construction, repairs or installations have been conducted with the degree of care and professional skill and judgment ordinarily exercised by a member of my profession; and (2) to the best of my knowledge, and in my professional opinion as an architect or engineer, the contractor has fulfilled the obligations of such plans, specifications and contract. Signed this 7th day of March, 2008. W. Michael Pollard, PE Designer Fire Protection Engineer of Record Title State of North Carolina, County of -..ulA~J4d"""'q'/-=~~----- Subscribed and sworn to before me this---? ~ day of ~ 20 D(t . Notary Public: ~ WL{tl~f My Commission EXPireS: Jl 1 t "lot \ •