FINAL REPORT
Obj No: 1332-R0002
FINAL REPORT
July 22, 2008
'--------·---------
Smith & Gerrard Halls Renovations
University of North Carolina at Chapel Hill
Chapel Hill, North Carolina
SCO ID#000-576-702A
PBC +L ARCHITECTURE
333 FAYETIEVILLE STREET, SUITE 1000
POST OFFICE BOX 951
RALEIGH, NC 27601/27602
1337
J
I
4
I ,
I • I
' I
.I
I
t
I
\
I • I
.I
I
4
FINAL REPORT
July 24, 2008
GERRARD HALL RESTORATION
SMITH HALL EXTERIOR RESTORATION
UNIVERSITY OF NORTH CAROLINA
Chapel Hill, NC
SCO ID#000-576·702A
Ann Beha Architects
33 Kingston Street
Boston, MA 02111
.I
I
t
I ._
I • I
J
I
-1
I ,
I
••
.•
I
.I
I
1
FINAL REPORT
GERRARD HALL RENOVATIONS
UNIVERSITY OF NORTH CAROLINA at CHAPEL HILL
GENERAL DESCRIPTION
Gerrard Hall was designed and built in 1822-37 as the College chapel and is one of the oldest
buildings on campus. In 1844, a portico designed by A.J. Davis was constructed on the south side of
the building, but this was removed in 1901. Gerrard is a small assembly space for both classroom
and performance use. It is located on Cameron A venue between Memorial and South Hall.
A. Dates
1.
2.
3.
4.
5.
6.
7.
Bid Opening Date --------------------------------------
Award Date ---------------------------------------------
Pre-Construction Conference ------------------------
Notice to Proceed --------------------------------------
Final Inspection Date----------------------------------
Acceptance Date ---------------------------------------
Warranty Expiration Date -----------------------------
B. Building Type
April 27, 2006
August 22, 2006
September 8, 2006
September 12, 2006
October 31, 2007
November 14,2007
November 13,2008
Gerrard Hall consists of a single auditorium space on the interior, with two egress stairs and an open
balcony on three sides. The main floor accomodates 233 at tables, 390 in seats and 420 standing.
The balcony has fixed seating for 174 people.
C. Description
Exterior Design
Gerrard Hall has limewashed masonry walls with brownstone sills and water table. The existing
masonry walls were repointed, and brownstone sills and water table repaired or replaced where
required. New double-glazed wood windows matching those shown in historic photos have been
installed, and a new standing seam copper roof. On the south side, a new three-bay portico
incorporating entrance stairs and a ramp was constructed based on the 1844 design. With a new
ramp restored doorway, this provides an accessible entrance to the floor. Columns are limestone
with Ionic bases and capitals, and stair treads and walls are finished with pre-cast concrete to match
the brownstone watertable. An exterior plaza was created between Gerrard Hall and the Campus Y.
There are no permits or certificates relative to flood plain policy required to the best of the architect's
knowledge .
Interior Construction & Finish
Gerrard Hall is classified as A-2. The existing construction is classified as Type III-Bin accordance
with the North Carolina Builing Code.
Final Report -Gerrard Hall
University ofNorth Carolina, Chapel Hill Page 1
A crawl space was excavated under the first floor to provide space and access for mechanical
equipment. Access is provided via a hatchway and ladder in the mechnical closet at the rear of the
auditorium, with a larger hatchway set flush with the stage surface. Flooring and kneewalls of the
access are poured concrete.
The first floor of the auditorium is existing tongue and groove maple flooring, which was repaired
and refinished. Walls and ceiling are existing plaster on metal lath, painted. Columns and trim are
faced with painted wood. Two new accessible toilet rooms were provided under the balcony at the
rear of the auditorium. These have ceramic tile on floors and walls. Egress stairs have vinyl tile at
the floor, treads and landings.
The balcony is open to the auditorium, and also finished with existing wood flooring, plaster and
paint. Existing steel seating was removed, reupholstered, repainted and reinstalled.
Structural
[from Stewart]
Plumbing
Plumbing work consisted of the installation of two single person ADA toilets. A new 2 inch
domestic cold water service was connected to the 12 inch water main along Cameron A venue. A 2
inch reduced pressure zone backflow preventer was installed within the building.
A new waste and vent piping was installed. A new sanitary building drain was installed and
extended 5 feet beyond the building for connection to the campus sanitary sewer system.
New plumbing fixtures are commercial grade white vitreous china or enameled cast iron. Water
closets are tp.e manual exposed flush valve type.
Hot water is provided by point of use electric instantaneous water heaters at each lavatory.
Fire Protection
Fire protection work consisted of the installation of a hydraulically calculated ordinary hazard group
one dry pipe sprinkler system for the entire building, including crawl and attic spaces. A new 6 inch
fire service water main was connected to the existing 12 inch water main along Cameron Avenue
and extended into the building to the dry pipe valve in the crawl space. A reduced pressure detector
type backflow preventer was installed outside the building within an insulated and heated enclosure.
Sprinklers are quick response concealed pendents in finished areas and brass uprights and pendents
in attic and crawl space.
HVAC
The existing radiators, including all piping and controls were removed.
Two chilled water and hot water air handling units were installed in the crawl space. Excavation was
required to provide enough room for the air handling units in the crawl space.
Final Report -Gerrard Hall
University of North Carolina, Chapel Hill Page2
L
I
t
I
t
I • I
I.
I
I
r
I
••
•.
I
L
I
t
I
I ._
I • I
J
I
I ,
I
••
}
I
.I
I
1
AHU-1 supplies air to the first floor. AHU-2 supplies air to the second floor. A unit heater was
installed in the crawl space. Hot water and chilled water is supplied from the campus utility system.
The project has a hot water pump and a chilled water pump.
Controls were replaced with a DDC system that is tied to the campus energy management systems.
Electrical
The existing 120 Volt, 240 Volt single phase electrical service transformer was reused to supply
power to Gerrard Hall. A new 300 amp feeder and raceway were provided from the existing
transformer through a new electrical meter to a new Main Distribution Panel (MDP) located in the
main electrical room. The electrical system located within the Gerrard Hall includes a 300 amp,
120/240 volt single phase, Main Distribution Panel, (1) 120/240 volt single phase, 100 amp, main
lug lighting dimming panel and (1) 120/240 volt single phase, 100 amp, main lug panel for power
loads within the facility .
A new fire alarm system was provided to monitor the facility. A fire alarm panel (F ACP) and digital
alarm communications transmitter (DACT) were provided and mounted in the mechanical room. A
fire alarm remote annunciator panel (F AAP) was provided at the fireman's entry to the building.
Smoke detectors were provided in corridors and utility areas. Duct detectors were provided for the
HV AC system. Audio visual devices were provided in all public use areas and fire alarm pull
stations were provided within 5 feet of all egress doors.
Fluorescent lighting fixtures were provided, typically using T8 lamps or compact fluorescent lamps
and electronic ballasts in utility areas. Existing incandescent lighting fixtures were refurbished and
reused to accommodate the intended use of the facility as a performance area and to preserve
historical elements in the facility. Lighting fixture types vary per area use. All incandescent lighting
fixtures were supplied by the new dimming system. All exit signs provided were battery backed
LED type exit signs. Battery backed emergency lighting unit equipment was provided for emergency
lighting.
A raceway system for each tele/data, audio-visual and UNC One-card systems were provided to
allow the owner the capacity to add these systems. Power outlets were provided in each of the utility
spaces, in the first and second floor theater areas. All raceway systems were concealed in public
spaces .
Elevator: None
Final Report -Gerrard Hall
University of North Carolina, Chapel Hill Page3
I
I ._
I • I
J
I
I ,
I
••
.•
I
.I
I
1
Structural Final Report -UNC -Gerrard Hall Renovations
A.
B .
c.
Design Objectives
The primary structural modifications included modifications of the existing structure to
support a complete renovation of this building. Elements which affected the structure
included the construction of a new crawlspace mechanical corridor with concrete
equipment pads, areaways to crawlspace, cast-in-place steps on grade, re-build
historic portico with additional handicap access ramp, construction of new stage with
removeable panels to access mechanical corridor below, construction of balcony
framing over stage area, the upgrade of the existing wood catwalk in attic space, and
the addition of anchors to existing roof framing for fall protection system.
The Existing Building Structure
Roof:
The existing roof framing· consists of steel trusses and purlins with a poured in place
concrete deck on expanded metal lathe. The steel trusses are supported by the
exterior multi-wythe brick walls.
Attic/Mechanical Area:
The existing attic framing consists of a wood framed catwalk supported by the bottom
chords of steel roof trusses.
Balcony Floors:
The floors of the building are constructed from light framed wood construction.
Auditorium floor:
The floor is a cast-in place concrete one-way slab and beam system. The structure
depth varies with the spans. However the typical depths are as follows: Slab 4 Y2",
Beams -12" wide and 20" deep including the slab. The beams are supported by
concrete columns that are 12"x12".
Crawlspace:
The original building area is constructed over a shallow crawl space, +/-3 feet high.
All building footings are shallow large stone footings at the exterior walls and isolated
column footings ~;~t the interior that bear approximately 18" below finish floor I crawl
space floor. ·
New Construction
New Mechanical Corridor:
The center of the existing crawlspace was excavated to provide an access corridor for
servicing new mechanical equipment in the crawlspace. The access corridor is
constructed of a 12" slab on grade with 8" reinforced cantilevered CMU retaining walls
on each site of the corridor. Four new concrete equipment pads were provided for the
mechanical equipment.
New Stage Floor:
The area at the existing stage platform was removed and replaced with steel beams
and a 5" total thickness concrete slab on metal deck level with the existing auditorium
floor slab.
D.
New Floor Ooeninqs:
In areas where openings were larger and required the cutting portions of the existing
one-way slab between support beams, steel channels were used to support the slab on
each side of the opening. The channels typically spanned between the existing
concrete beams.
Balcony:
The existing balcony framing over the stage between the two stair towers was
removed and replaced with new framing. A steel beam spans between the brick load
bearing walls of the stair towers to support the interior edge of the balcony framing.
This beam also serves as a hoist beam for installation and replacement of the
mechanical equipment in the crawlspace under the stage. The balcony floor framing is
cold formed light gauge metal stud joists with 3/4" plywood.
Portico:
The portico roof is constructed of light-gauge roof trusses supported by a series of
steel beams and posts which connect to the existing multi-wythe brick wall and new
loadbearing sandstone columns. The loadbearing columns are supported by concrete
pedestals and footings. A structural slab on grade with handicap ramp access and
steps on the other two sides serve as the main access to the building.
Attic Space:
The existing wood framed catwalk was upgraded by providing additional framing and
additional attachment of the existing and new framing to the bottom chords,
increasing the width to 48", and providing a wood guardrail. The catwalk serves for
access to the equipment panels and for the performance of routine maintenance.
Design Criteria
Applicable Codes:
2002 North Carolina State Building Code (2000 IBC with revisions)
Building Code Requirements for Structural Concrete (ACI 318-99)
Building Code Requirements for Masonry Structures (ACI 530-99)
AISC Manual of Steel Construction, ASD, ninth edition (1989)
American Welding Society d1. 01-90
Min Design Loads for Buildings and Other Structures (ASCE 7-98)
National Design Specification for Wood Construction (NDS 1997)
Cold Formed Steel Design Manual (AISI 1996)
Applicable Loads:
Design Uve Loads:
Roof ....................... 20 psf (for analysis purposes)
Public areas, lobbies .......... 100 psf (for analysis purposes)
Corridors 2nd and above ....... 80 psf (for analysis purposes)
Corridors ground ............. 100 psf (for analysis purposes)
Stairs ...................... 100 psf (for analysis purposes)
Catwalk ................ 60 psf (for analysis purposes)
Wind load: (2002 North Carolina Building Code/IBC)
basic design wind velocity .... 95 mph
occupancy classification ..... Category I
exposure category ........... B
importance factor ........... 1.0
L
I
t
I
r
I • I
I.
I
I
r
I
••
•.
I
L
I
I
I ._
I • I
J
I
el
I ,
I
••
•• I
I
1
Seismic load: (2002 North Carolina Building Code/IBC)
design method: equivalent lateral force procedure
SDs ................ 23.9
SDl. ............... 16.7
importance factor ......... 1.0
seismic design category ...... C
Site dass ................. D (Assumed)
Future loads:
Unless specifically noted, no provisions will be made for future floors, roofs, or other
loads.
Foundations:
New foundation design was based on the presumptive allowable soil bearing pressure
of 2,500psf.
EXHIBIT A-SQUARE FOOTAGE
Floor Room# Description
1 111 Bathroom
1 112 Vestibule
1 113 Storage
1 114 Vestibule
1 115 Bathroom
1 116 Auditorium
1 119 Stage
1 120 Electrical Closet
1 121 Storage
Bale. 211 Main Balcony
212 Balcony
213 Electrical Closet
Final Report -Gerrard Hall
University ofNorth Carolina, Chapel Hill
SF Total Net
per Level
54
56
40
56
54
1425
140
100
40
1965
1230
120
30
1380
3345
Total Gross
per Level
Page4
L
I
t
I
r
I • I
I.
I
I-
I
r
I
••
•• I
L
I
t
-----
I Exhibit B
I Exhibit B • Cost Data
Smith & Gerrard Halls Renovations
I UNC-CH
SCO ID#000-576-702A
Architect of Record: Ann Beha Architects, Inc.
I Original Contract Final Contract Percent of
I Contract Sum Additions Deductions Sum Total Cost
Construction Cost
General $1,903,241 $86,045 $59,060 $1,930,226 67%
I Plumbing/sprinkler $116,000 $41,107 $0 $157,107 5%
HVAC $240,009 $4,557 $0 $244,566 8%
Electrical $165,180 $23,969 $0 $189,149 7%
I Subtotal Construction $2,424,430 $155,678 $59,060 $2,521,048 88%
Design Fee
I Gerrard Hall
Original $186,788 $186,788
Amendment#1 $6,000 $0 $6,000
I Amendment#2 $7,100 $0 $7,100
Amendment#3 $31,120 $0 . $31,120
Smith Hall
I Original $116,036 $116,036
Amendment#1 $4,500 $0 $4,500
Amendment#2 $6,180 $0 $6,180
I Subtotal Design $302,824 $54,900 $0 $357,724 12%
I Total $2,727,254 $210,578 $59,060 $2,878,772 100%
I Cost per Net SF $860.62
I
I
I
I
I
I Page 1
.I Exhibit C
I Exhibit C -Change Orders
Smith & Gerrard Halls Renovations
t UNC-CH
sea ID#000-576-702A
Architect of Record: Ann Beha Architects, Inc.
I Change Description Change Order Net Change Order Net NET Change
Order No Add Deduct ._ G#1 Additional abatement of piping insulation $1,683
Delete steel at catwalk and provide ($14,806)
I HVAC grill revision at area below balconies $273
Total CO G#1: $1,956 ($14,806) ($12,850)
• G#2 Adjust project duration to reflect Addenda $0
I Total CO G#2: $0 $0 $0
G#3 Modify duct layout at attic space to $1,509
J Omit shaft wall material in attic above Stair ($921)
I Waterproofing in crawl space $8,592
Unsuitable soil at portico $3,435
el Add'l sprinkler heads in the ceiling/framing $4,029
Request for time extension due to rain $0
I Total CO G-3 $17,565 ($921) $16,644
G#4 Add'l wood window repairs $8,834 , Modify plenum for slot diffusers under $930
I
Change AHU control valves from 3-way to $0
Changing CW bridge control valve per $0
• I Install wood trim at projection screen $1,908
Request for time extension due to changes $0
•• Total CO G-4 $11,672 $0 $11,672
G#5 Add lights in the attic per Owner's request. $3,481
I Provide add'l outlet and circuit for hot & $4,793
Replace wooden column bases at Smith $28,667
.I Supply Laptop controls computer in lieu of $1,175
Total CO G-5 $38,116 $0 $38,116
I
1 Page 1
Exhibit C L
Exhibit C -Change Orders I Smith & Gerrard Halls Renovations
UNC-CH t SCO ID#000-576-702A
Architect of Record: Ann Beha Architects, Inc.
Change Description Change Order Net Change Order Net NET Change I Order No Add Deduct
G#6 Repair stone base with repair mortar in lieu $6,073 t electrical additions associated with RFI #70 $7,010
Electrical additions associated with design $834 I Repair levelness of existing stairpans for $751 •
Smith Hall termite treatment $2,856 I Total CO G-6 $17,524 $0 $17,524
G#7 Install additional hom strobe In attic of $2,595 I. Install additional smoke detector in second $3,341
Re-install FDC connection $4,211 I
Install sprinkler backflow preventor $32,867
skim and patch existing plaster walls $2,166 •
Replace chimney on Smith Hall $3,248 I Total CO G-7 $48,428 $0 $48,428
G#8 cut and repair existing chilled water lines $1,600 r Install fire rated ceiling hatch at access to $1,013
Install new projector enclosure at Gerrard $1,915 I
Credit to delete outside pressure washing ($1,553) • Total CO G-8 $4,528 ($1,553) $2,975 I
G#9 Restocking fees for backflow preventor and $15,889
Total CO G-9 $15,889 $0 $15,889
•• G#10 Credit for unused Contract Allowances ($41,780)
Total CO G-10 ($41,780) $0 ($41,780)
I Project totals $113,898 ($17,280) $96,618
L
I
Page2
t
.I
I
t
I ._
I • I
J
I
el
I ,
I
••
•• I
.I
I
1
Exhibit D -Subcontractors & Suppliers
Smith & Gerrard Halls Renovations
UNC-Chapel Hill
SCO ID# 000-576-702A
Architect of Record: Ann Beha Architects, Inc.
See Attached Sheets
.I
I
t
I ._
I • I
J
I
-1
I ,
I
••
•• I
.I
I
1
Subcontractors & Suppliers
Renovations to Gerrard & Smith Renovation, UNC-CH
H.M. Kern Corporation Project #689
SUBCONTRACTORS
84351
Anderson-Wells Floorscapes
POBox 178
Burlington, NC 27216-0178
Stephen Day
P: 336-222-0801
F: 336-222-1241
• Section 09310 -Ceramic Tile
84352
Apex Steel
301 Petfinder Lane
Raleigh, NC 27603
P: 919-362-6611
F: 919-362-6664
• Section 05120-Structural Steel
• Section 05310 -Steel Deck
• Section 05500-Metal Fabrications
• Section 05530-Gratings
S4455
Associated Scaffolding
P0Box2129
Durham, NC 27702
Darren Spiker
P: 919-682-2655
F: 800-768-2655
C: 919-630-4181
Physical Address: 1107 East Geer Street
Durham, NC 27704
• Scaffolding & Shoring (Smith Hall)
84365
Baker Roofing Company
POBox26057
Raleigh, NC 27611
Chris Brackin
P: 919-828-2975
F: 919-256-2281
• Section 07612-Sheet Copper Roofing
• Section 07620-Sheet Metal Flashing & Trim
• Section 07900 -Joint Sealers, as pertains to roofing
Z:\ALWA TA'PROJI689\MISCI689 Sub Vend Ust.doc 712112008
Subcontractors & Suppliers
Renovations to Gerrard & Smith Renovation, UNC-CH
H.M. Kern Corporation Project #689
84353
Bryant-Durham Services, Inc.
5102 Neal Road
Durham, NC 27715
Harold Liberty
P: 919-383-9227
F: 919-382-2836
• Section 02069-UNC Selective Demolition
• Section 02070 -Selective Site Demolition
• Section 16000-Summary of Electrical Work
• Section 16010-Basic Electrical Requirements
• Section 16015-Testing and Placing in Service
• Section 16030-Reworking Existing System
• Section 16035-Temporary Power and Lighting
• Section 16045 -Electrical Related Work
• Section 16046-Concrete Equipment Pads
• Section 16055-Through-Penetration Firestop Systems
• Section 16110-Raceways
• Section 16120-Secondary Voltage Wires and Cables
• Section 16135-Electrical Boxes and Fittings
• Section 16142-Electrical Connections for Equipment
• Section 1614 3 -Wiring Devices
• Section 16170-Circuit and Motor Disconnects
• Section 16180-Combination Motor Starters
• Section 16190-Supporting Devices
• Section 16195 -Electrical Identification
• Section 16452-Grounding
• Section 16470-Panelboards
• Section 16500-Lighting Fixtures and Light Fixture Restorations
• Section 16718 -Pre-Set Lighting Dimming Systems
• Section 16721 -Fire Alarm Systems
• Section 16741-Telephone Raceway System
84354
Capital Restoration & Waterproofing, Inc.
618 Chambers Ferry Road
Edenton, NC 27932
Keith Harrison
P: 252-333-2428
F: 252-482-8930
E-mail: keith@capitalrestorations.com
• Section 04910-Masonry Restoration
Z:W.LDATA\PROJ\689\MfSC\689 Sub Vend Ustdoc 712112008
L
I
t
I
r
I • I
I.
I
I-
I
r
I
••
•• I
L
I
t
.I
I
1
I ._
I • I
J
I
-1
I ,
I
••
•• I
.I
I
1
Subcontractors & Suppliers
Renovations to Gerrard & Smith Renovation, UNC-CH
H.M. Kern Corporation Project #689
84392
Carolina Stone Setting Company
POBox 156
Cary, NC 27512
W. Brian White
P: 919-467-4692
F: 919-467-4660
Physical Address: 10315-B Chapel Hill Road
Morrisville, NC 27560
• Section 04413-Limestone
84355
Clean Air Environmental, Inc.
POBox 12517
Winston-Salem, NC 27117
Ricky Delgado
P: 336-788-2901
F: 336-788-2902
E-mail: cleanairinc@bellsouth.net
Physical Address: 2500 Old Lexington Rd., Suite B
Winston-Salem, NC 27107
• Section 01570-UNC Construction Waste Management
• Section 02069 -UNC Selective Demolition, as pertains to Hazardous Material Abatement
• Section 02080 -Hazardous Materials
84356
Doug Middleton Associates, Inc.
5011 Laurel Grove Lane
Weddington, NC 28104
Ken Middleton
P: 704-846-4900
F: 704-846-4997
• Section 1291 0 -Auditorium Seating Restoration
84357
Eatman's Carpets
P0Box30639
Raleigh, NC 27622
Woody Eatman
P: 919-782-6010
F: 919-782-9414
• Section 09653 -Resilient Tile Flooring
Z:\ALLDATAIPROJ\6B91MISC\689 Sub Vend Ust.doc 712112008
Subcontractors & Suppliers
Renovations to Gerrard & Smith Renovation, UNC-CH
H.M. Kern Corporation Project #689
84401
Frye Fence Company, Inc.
3221 Durham Drive, Suite 115
Raleigh, NC 27603
James Frye
P: 919-779-4700
F: 919-779-7667
• Construction Fencing
84385
Hawkins Plastering
POBox696
Morrisville, NC 27560
Marcus Hawkins
P: 919-380-8644
F: 919-380-2900
• Section 09100-Metal Support Assemblies
• Section 09200 -Portland Cement Plaster
• Section 09281-Plaster Patching & Repair
• Work in Smith Hall Only.
84358
HFD Construction Company
1005 Forge Road
Durham, NC 27713
Harry Dixon
P: 919-544-3090
F: 919-484-1253
C: 919-302-7261
• Section 02220-Sediment & Erosion Control
• Section 02665-Water Systems
• Section 02720 -Site Drainage
• Section 02730 -Sanitary Sewerage
84567
High Rock Waterproofing, Inc.
472 Grimes Boulevard
Lexington, NC 27292
Jeff Welty
P: 336-956-1184
F: 336-956-6491
Z:IALWA TA\PROJ\689\M/SC\689 Sub Vend Ust.dor;; 712112008
L
I
t
I
r
I • I
I.
I
I-
I
r
I
••
•• I
L
I
t
.I
I
t
I ._
I • I
J
I
-1
I ,
I
••
•• I
.I
I
t
Subcontractors & Suppliers
Renovations to Gerrard & Smith Renovation, UNC-CH
H.M Kern Corporation Project #689
• Division 7 -Thermal & Moisture Protection, as pertains to waterproofing
basement CMU walls
84573
Jerry Pyron
P0Box246
Pelham, NC 27311
Jerry Pyron
P: 336-939-7453
• Section 08550-Wood Windows (Installation)
S4386-CONTRACT CANCELLED
Leonard Hill Plastering
4810 Belford Road
Fayertevi11e, NC 28314
Leonard Hill
P: 910-867~3862
F: 910-867-3862
• Section 05400-Cold-Formed Metal Framing
• Section 09100-Metal Support Assemblies
• Section 09213 = Gypsum Veneer Plaster
• Section 09220 -Portland Cement Plaster
• Section 09261-Shaft Wall Systems
• Section 09281 -Plaster Patching & Repair
• Work in Gerrard Hall Only
84359
M & M Industrial Plumbing
POBox28207
Raleigh, NC 27611-8207
Gerry Loehfelm
P: (919) 661-8026
F: (919) 662-7439
Physical Address: 8537 Applecross Circle
Apex, NC 27539
• Section 15000-Summary of Mechanical Work
• Section 15010 -Basic Mechanical Requirements
• Section 15045-Through-Penetration Firestop Systems
• Section 15046-Excavating for Mechanical Work
• Section 15048 -Access Doors and Panels
• Section 15060-Pipes and Pipe Fittings
ZiALWA TA 'PROJ\689\M/SC\689 SubVend List. doc 712112008
Subcontractors & Suppliers
Renovations to Gerrard & Smith Renovation, UNC-CH
H.M. Kern Corporation Project #689
• Section 15100-Valves
• Section 15120-Piping Specialties
• Section 15125-Expansion Compensation
• Section 15140 -Supports, Anchors, and Vibration Isolation
• Section 15190 -Mechanical Painting and Identification
• Section 15250-Mechanical Insulation
• Section 15411-Water Distribution Piping
• Section 15412 -Soil, Waste, Vent, and Roof Drainage Systems
• Section 15440 -Plumbing Fixtures
• Section 15453-Plumbing Pumps
• Section 15458-Water Heaters
• Section 15510-Water Piping Systems
84579
Professional Concrete Cutting
POBox323
Gamer, NC 27529
Bryan Lipscomb
P: 919-771-1977
F: 919-771-1975
M: 919-995-6490
• Section 02070 -Selective Site Demolition, as pertains to removal of limestone
beams
84443
Reliant Painting Company
1440 S. Briggs Avenue
Durham, NC 27703
Kenneth Walsh
P: 919-596-0790
F: 919-596-0770
• Painting
• Joint Sealants, as related to painting
84360
Royalwood Associates, Inc.
PO Box 91145
Raleigh, NC 27675
P: 919-957-3006
F: 919-957-3007
Physical Address: 7421 ACC Boulevard
Raleigh, NC 27617
• Section 09648 -Wood Strip Flooring
Z:IALLDATAIPROJ\689\M/SC\689 SUbVend Ustdoc 7/2112008
L
I
t
I
r
I • I
I.
I
I-
I
r
I
••
•• I
L
I
t
.I
I
1
I ._
I • I
J
I
-1
I ,
I
••
)
I
.I
I
1
Subcontractors & Suppliers
Renovations to Gerrard & Smith Renovation, UNC-CH
H.M. Kern Corporation Project #689
84578
Ruston Paving Company, Inc.
3874 South Alston Avenue
Durham, NC 27713
KevinMaira
P: 919-544-1288
F: 919-544-1255
• Section 02511-Asphalt Paving
84361
Sunland Fire Protection, Inc .
POBox277
Jamestown, NC 27282
Mark Snyder
P: 336-886-7027
F: 336-886-7024
Mark.snyder@sunlandfire.com
• Section 15140-Supports, Anchors, and Vibration Isolation
• Section 15300 -Building Sprinkler Systems
84469
Triad Upfits, Inc.
962 Patterson Grove Road
Ramseur, NC 27316
Terry Hollady
P: 336-824-4273
F: 336-284-1440
Email: triadupfitsinc@earthlink.net
• Section 05400-Cold Formed Metal Framing
• Section 09100 -Metal Support Assemblies
• Section 09213 -Gypsum Veneer Plaster
• Section 09261-Shaft Wall Systems
84362
Watco Corporation
P0Box2239
Gamer, NC 27529
Alan Middleton
P: (919) 772-7191
F: (919) 772-1458
Physical Address: 14 31 Mechanical Boulevard
Garner, NC 27529
Z:IALLDATA 'IPROJ\689\MfSC\689 Sub Vend Ustdoc 712112008
Subcontractors & Suppliers
Renovations to Gerrard & Smith Renovation, UNC-CH
H.M. Kern Corporation Project #689
• Section 15000-Summary of Mechanical Work
• Section 150 I 0 -Basic Mechanical Requirements
• Section 15030-Electrical Provisions for Mechanical Work
• Section 15045-Through-Penetration Firestop Systems
• Section 15046-Excavating for Mechanical Work
• Section 15048-Access Doors and Panels
• Section 15060 -Pipes and Pipe Fittings
• Section 15100-Valves
• Section 15120 -Piping Specialties
• Section 15125-Expansion Compensation
• Section I 5 I 40 -Supports, Anchors, and Vibmtion Isolation
• Section 15190 -Mechanical Painting and Identification
• Section 15250 -Mechanical Insulation
• Section 15300-Building Sprinkler Systems
• Section 15411 -Water Distribution Piping
• Section 15412-Soil, Waste, Vent, and Roof Drainage Systems
• Section 15440 -Plumbing Fixtures
• Section 15453 -Plumbing Pumps
• Section 15458-Water Heaters
• Section 15510-Water Piping Systems
• Section 15515 -Buried Piping Heating and Cooling Distribution
• Section 15540-HVAC Pumps
• Section 15545-Variable Frequency Controllers for HV AC Motors
• Section 15830-Terminal Heating Units
• Section 15840 -Coils
• Section 15855-Air Handling Units
• Section I5860-Fans
• Section 15885 -Air Filters
• Section 15891 -Ductwork and Apparatus Casing
• Section 15900 -Building Control System Integration
• Section 15901-Building Control Systems and Networks
• Section 15902-Control Valves and Dampers
• Section 15903 -Control Instrumentation
• Section 15910 -Ductwork Accessories
• Section 15932 -Air Outlets and Inlets
• Section 15990-Testing, Adjusting, and Balancing
84363
William E. Smith
1818 Marion's Ford Road
Chapel Hill, NC 27516
William (Smitty) Smith
Z:IALLDATA\PROJ\689\M/SC\689 Sub Vend Ust.doc 712112008
L
I
t
I
r
I • I
I.
I
I-
I
r
I
••
•• I
L
I
1-
.I
I
1
I ._
I • I
J
I
-1
I ,
I
••
.•
il
.I
I
1
Subcontractors & Suppliers
Renovations to Gerrard & Smith Renovation, UNC-CH
H.M. Kern Corporation Project #689
P: 919-929-4491
F: 919-933-0825
• Section 02780-Unit Pavers
• Section 04810-Unit Masonry Assemblies
SUPPLIERS
P2064
Adams Products Company
POBox 189
Mooresville, NC 27560
Larry Smythe
P: 919-427-4787
P: 919-467-2218
F: 919-467-9113
Physical Address: 5701 McCrimmon Parkway
Morrisville, NC 27560
• Section 04 720 -Cast Stone
• Section 04810 -Masonry
P2092
Beeson Sign Company
115 Adams Street
Kernersville, NC 27284
Chris
P: 336-993-5617
F:
• Job Sign
P2075-PURCHASE ORDER CANCELLE 09/21/06
Canco Waste Management, Inc.
1101 Ellis Road
Durham, NC 27703
Jon Bowman
P: 919-957-0877
F: 919-957-1898
• Dwnpster
P2065
Chandler Concrete Company, Inc.
Z:IAU.DATAIPROJ\689\M/SC\689 SubVend Ust.doc 7/21/2008
Subcontractors & Suppliers
Renovations to Gerrard & Smith Renovation, UNC-CH
H.M. Kern Corporation Project #689
POBox 131
Burlingto~ NC 27216
Jimmy Owen
P: 919-644-0143
P: 336-226-1181
F: 336-570-0557
P2066
Garland Woodcraft Company, Inc.
PO Box 11068
Durham, NC 27703
Charles Delionbach
P: (919) 596-8236
F: (919) 596-5077
Physical Address: 451 S Driver St
Durham, NC 27703
• Section 06200 -Finish Carpentry
P2087
Legacy Millwork Specialties
105 Highway 54 West, Suite 269
Homestead Market Shopping Center
Durham, NC 27713
Joe Hamer
P: 919-361-0089
F: 919-361-9341
• Section 08550-Wood Windows
P2067
Martin Architectural Products, Inc.
POBox3249
Cary, NC 27519-3249
Greg Snider
P: 919-469-9661
F: 919-469-9630
• Section 08115 -Steel Door Frames
• Section 08212-Flush Wood Doors
• Section 08216-Stile and Rail Wood Doors
• Section 08710 -Door Hardware
• Section 10520 -Fire Protection Specialties
• Section 1081 0 -Toilet Accessories
Z:IALLDATA\PROJ\689\M/SC\689 SubVend Llstdoc 712112008
L
I
I-
I
r
I • I
I.
I
I-
I
r
I
••
•• I
L
I
1-
.I
I
1
I ._
I • I
J
I
-1
I ,
I
••
•• I
.I
I
1
Subcontractors & Suppliers
Renovations to Gerrard & Smith Renovation, UNC-CH
H.M. Kern Corporation Project #689
P2083
Piedmont Portables
POBox 1957
Burlington, NC 27216
Beth Thomas
P: 336-437..0534
F: 336-437-0538
• Temporary Toilets
P2080
Proven Products, Inc .
POBox6187
Kinston, NC 28501
Nancy Philyaw
P: 252-527-8074
F: 252-527-9421
E-mail: proven@icomnct.com
Physical Address: 2520 Banks School Road
Kinston, NC 28501
• Section 11132-Projection Screens
P2084
Rockingham Steel, Inc.
POBox 1347
Harrisonburg, VA 22803
P: 540-433-3000
F: 540-389-4971
• Section 03300-Cast In Place Concrete, as pertains to concrete reinforcements
P2086
Waste Industries
3741 Conquest Drive
Gamer, NC 27529
Terri Burdick
P: 919-662-7100
F: 919-773-0503
• Dumpster
R & R Concrete, Inc.
6701 Walnut Ridge Road
Z:\ALLDATAIPROJ\689\M/SC\689 SubVend Ust.doc 712112008
Subcontractors & Suppliers
Renovations to Gerrard & Smith Renovation, UNC-CH
H.M. Kern Corporation Project #689
Gibsonville, NC 27249
Bobby Rumley
P: 336-656-7615
F: 336-656-7615
Z:\ALLDATA\PROJ\689\MISC\689 SubVend List. doc 7121/2008
L
I
t
I
t
I • I
I.
I
I-
I
r
I
•• ..
I
L
I
t
.I
I
1
I ._
I • I
.J
I
I ,
I • I
)
I
I
1
Exhibit E -Electrical Load Summary
Smith & Gerrard Halls Renovations
UNC-Chapel Hill
SCO ID# 000-576-702A
Architect of Record: Ann Beha Architects, Inc.
See Attached Sheets
.a. -a. -·--· -.a -.a. -'--·-_, -.a -a.
ELECTRICAL LOAD SUMMARY
SCC001
LOAD kVA AMP/PHASE
UGHliNG 6.8 28
RECEPTACLE 10.8 45
MECHANICAL 28.2 118
.
.
. .
. .
.
TOTAL 45.8 191
LOAD SUMMARY ~~OTES:
1. LOAD kVA VALUES ARE TOTAL OVER ALL THREE PHASES.
2. LOAD CURRENTS ARE EQUALLY DISTRIBUTED EQUALLY OVER ALL THREE PHASES AT THE
THE SUPPLY VOLTAGE.
ENERGY SUMMARY
Prescriptive D Performance • Energy Cost Budget D
Provide a standard riser diagram which indicates designated points for check metering.
Provide a standard panel schedule which identifies different enduse loads.
Lighting Schedule
Lamp type required in fixture
Number of lamps in fixture
Ballast type used in the fixture
Number of ballasts in fixture
Total wattage per fixture
Total interior wattage specified vs. allowed
Total exterior wattage specified vs. allowed
SEE FIXTURE SCHEDULE
SEE 8XTURE SCHEDULE
SEE 8XTURE SCHEDULE
SEE 8XTURE SCHEDULE
SEE 8XTURE SCHEDULE
5,255W DESIGNED vs. 10,394 ALLOWED
ALL EXTERIOR FIXTURES MEET EFFICACY REQUIREMENTS
Equipment Schedules with Motors (not used for mechanical systems)
Motor horsepower
Number of phases
Minimum efficiency
Motor type
Number of poles
N/A
N/A
N/A
N/A
19 -p -.--. -IIIII -.,. -,_ -.--It -19 -p
....... ---~--
ID BBG'ULAl\ WITH S' VAN SPACES WITH 8' ACCBSSIBLB
AL"CBSS .AISLB ACCBSS AISLB
1 none 1
APPROVALS
1t of Insurance, SBCCI, ICC, etc., describe below)
~BLE 719.1(2)
)8 POA VARIOUS WALLS AND PARTmONS a,o,p
MINIMUM PINISHBD THICI<NUS
, FAc:n!;:c•
IONSTRUmiON 4hour :I hour 2hour
1
1 hour
6 4.9 3.S 2.7
s.o 4.3 3.4 2.3
ntecl with perlita VermiCilllte or 6.6 s.s 4.4 3.0
percent solid backed with a
3/4 • thick formo6 tJom 0.021 11
wall on 24" centm wilh 5<1 X gypsum wallboani• altGChed ---
·long 'JYpl'l S screws spaced 8"
.a--·-_,-.a -I.·
MECHANICAL SUMMARY
MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENT
Method or CompHanee
[&! Prescriptive 0 Energy Cost Budget
Thermal Zone
· winter dry bulb
summer dry bulb
Interior design conditions
w:inter dry bulb
summer dry bulb
relative humidity
BuilcUng heating load
Bulldtng coollng load
7A
16F
93F
70F
75F
SO%
350MBH
2STONS
MeehaDical Spacing Conditioning System·
Unitary
REFER TO EQUIPMENT
,____SCHEDULES ON SHEET H5.0
AND SPECIFICATIONS
description of unit
heating efficiency
cooling efficiency
heat output of unit
cooling output ofunit
Boiler ----'
total boiler output. If oversized, state reason. N/A.CAMPUS UTIT..ITIBS
Chiller
total chiller capacity. If oversized, state reason. NIA CAMPUS UTILITIES
List equipment efttclencles
Equipment schedules with motors (mechaDical systems) ~
motor horsepower
number of phases
mhrlnnun etliciency
motor type
#ofpoles
REFER TO EQUIPMENT
SCHEDULES ON SHEET H5.0
AND SPECIFICATIONS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Section 326
CERTIFICATE OF COMPLETION
PROJECT: Smith & Gerrard Halls
LOCATION: Chapel Hill. North Carolina
SCO 10 NUMBER: 000.576. 702A BUDGET CODE#:40073 ITEM#:309 DATE: August 8. 2008
OWNER: University of North Carolina at Chaoel Hill
DESIGNER: Ann Beha Architects
PRIME CONTRACTOR:...!..H~M:.!....!K~e~m!.J....._ _________________ _
I (we) certify that the work on the above·referenced project has been completed
according to the plans, specifications, addenda and approved change orders and
that the project Is ready for owner occupancy.
The Final Inspection was made on October 31 2007. The guarantee period begins
on November 14 ·2001, and shall terminate on November 14 2008.
The contractors report that final payments have been made to all material
suppliers, employees and subcontractors; was included with final request for
payment
Builders' risk Insurance was cancelled as of November 15 2007, and a copy of the
Cancellation Notice is attached hereto.
The total time for completion, as allowed in the contract plus granted time
extensions, is 429 days. The actual time required for completion was 429 days,
and the contractor is not liable for liquidated damages.
Copies of the following Items are attached as indicated below:
Written guarantees:
All warranties included in the general 0 & M Manual previously transmitted to the Owner.
Affidavits:
Contractor's Affidavit of Release of Liens
Contractor's Affidavit of Payment of Debts and Liens
Consent of surety company to final payment: YES
Manuals of operation instructions:
General Construction. Plumbing. Mechanical and Electrical (See transmittal)
I Certificate of completion
I
, I
I
I
'I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION324
CERTIFICATE OF COMPLIANCE
PROJECT: Smith Hall & Gerrard Hall Renovations
LOCATION: CHAPEL HILL, NORm CAROLINA
BUDGET CODE: 40073 ITEM: 312
OWNER: UNC-CHAPEL HILL
SCO ID# 000.576. 702A
TYPE OF CONTRACT: SINGLE PRIME FINAL AMT: $2.521,048
DATE OF FINAL ACCEPTANCE: November 11. 2007.
CONTRACTOR: HM Kern
I (we) certify that the structural work on the above-referenced project has been inspected
in accordance with Chapter 133, Article 1, of the General Statutes, and that:
( 1) The inspections of the construction, repairs or installations have been conducted
with the degree of care and professional skill and judgment ordinarily exercised
by a member of my (our) profession; and
(2) To the best of my (our) knowledge, and in my (our) professional opinion as an
engineer, the contractor has fulfilled the obligations of such plans, specifications
and contract.
Pamela W. Hawkes
Designer
Principal
Title
State of (\')q~s ttc k<&Jc.lttounty of S q_ F~l (
Subscribed and sworn to befure me this~ day of
NotaryPublica.? tf ~
My Commission Expires: 8' -jO-J.O/ ~ ~ CHARLENE A. CAMPBELL
Notary Public
Cn!IIJIIOnWeallh afMuscluJseUs
M)· Commlaslon Explrea
ALifjUSt 10,2012
(S84L) .
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
As-Built Drawings: Yes
Final Report: Yes
Other required closing· papers of the contractor:
Test and Balance Report (Transmitted to Owner under separate cover)
There are no unsettled disputes·between the Owner and Contractor, Owner and Designer, or
the Designer and Contractor at this time.
~
Designer
I Certificate of Completion
I
1
I ._
I • I
J
I
I ,
I • I
•• I
I
SECTION 324
CERTIFICATE OF COMPLIANCE
PROJECT: Gerrard Hall/Smith Hall Renovations
LOCATION: UNC-Chapel Hill
BUDGET CODE: N/ A SC0#:00057 6702A SW#=-04...:...:0=5"--'-2=-1,_-=00,_--=04--'----------
0WNER: UNC-Chapel Hill
TYPEOFCONTRACT:-=S~in~g=le~P~r~im~e=---------------------------------------
DA TE OF FINAL ACCEPTANCE: _:...::N=ov.=....:e=m"'-"b=e=-r_,1'-'4'-L-..=2=0-=0-=--7-___________ _
CONTRACTOR: H.M. Kern -General Contractor/Piumbing-M & M Plumbing
I certify that the plumbing portion of work on the above-referenced project has been
inspected in accordance with Chapter 133, Article 1, of the General Statutes, and that:
( 1 ) The inspections of the construction, repairs or installations have been
conducted with the degree of care and professional skill and judgment ordinarily exercised
by a member of my profession; and
(2) to the best of my knowledge, and in my professional opinion as an architect
or engineer, the contractor has fulfilled the obligations of such plans, specifications and
contract.
Signed this 7th day of March, 2008.
W. Michael Pollard, PE
Designer
Plumbing Engineer of Record
Title
State of North Carolina, County of _ _,._WX->!!<Li~~~t...---___ --=---
Subscribed and sworn to before me this Int. day of W'latt:h 20Cl .
Notary Public: ~ ~.., Wil{)A~
My Commission~ lrptil tl 1 .,.II
:\,,,,,,,~,~~'~'''~ #" ~\~:~ ~ e· ········· 6' ~ ~ \. ••• y •••• ~ ::::;:: ... ..~ .. . '::::. :::: • ~r \ ... ':::-. -CI,)·o ·""'-=-= '·= = a: : .:e: .._CJ : z = .
::: ,.rt" ~ ... :-• ::: --~· a:v •,)..ea;:: ~ cJ •.. p\)Y •• •• f.... ~ ~ ... .. ~ ~ ~ /1v. ••••••••• ~' ~ ~11, ~/(E cO:\\~ r1111111Ulll\\\\\\'\
.I
I
1
I ._
I • I
J
I
el
I ,
I • I
. •
I
SECTION324
CERTIFICATE OF COMPLIANCE
PROJECT: Gerrard Hall Renovation
LOCATION: University of North Carolina, Chapel Hill, NC
BUDGET CODE: 40073 ITEM: 309
OWNER: University of North Carolina at Chapel Hill
TYPE OF CONTRACT: Single Prime FINAL AMT: $2,521,048.00
DATE OF FINAL ACCEPTANCE: 11/14/07
CONTRACTOR: H.M. Kern Corporation
I (we) certify that the structural work on the above-referenced project has been inspected
in accordance with Chapter 133, Article 1, of the General Statutes, and that:
( 1) The inspections of the construction, repairs or installations have been conducted
with the degree of care and professional skill and judgment ordinarily exercised
by a member of my (our) profession; and
(2) To the best of my (our) knowledge, and in my (our) professional opinion as an
engineer, the contractor has fulfilled the obligations of such plans, specifications
and contract.
Signed this __ 12_ day of_June 2oc& . ,
~?-:2:$
Robert T. Macia, PE
Vice President
Structural Department Manager
Stewart Engineering, Inc .
State of North Carolina County of ----''M"-!......Co..::....=..:.k....J:e .... /~-----------
Subscribed and sworn to before l~-+h day of \Jure
Notary Public: ~_J_.:_:· ~~~~~~~.,..__ ____ _
I
1
I ._
I • I
J
I
I ,
I
••
•• I
.I
I
1
SECTION 324
CERTIFICATE OF COMPLIANCE
PROJECT: Gerrard Hall/Smith Hall Renovations
LOCATION: UNC-Chapel Hill
BUDGET CODE: N/A SC0#:000576702A SW#=O...!..C40=5~-..,_21_._--=00""--=0_.!..C4 _______ _
OWNER: UNC-Chapel Hill
TYPEOFCONTRACT:-=S=in~g~le~P~r~im~e ______________________________________ _
DATE OF FINAL ACCEPTANCE: --~NC!:!.ov~e:!.!m.!.!.b!:!.!e:!_!r_1!....::4~2~0~0~7 ________________ _
CONTRACTOR: H.M. Kern -General Contractor/HVAC-Watco
I certify that the HVAC portion of work on the above-referenced project has been
inspected in accordance with Chapter 133, Article 1, of the General Statutes, and that:
( 1 ) The inspections of the construction, repairs or installations have been
conducted with the degree of care and professional skill and judgment ordinarily exercised
by a member of my profession; and
(2) to the best of my knowledge, and in my professional opinion as an architect
or engineer, the contractor has fulfilled the obligations of such plans, specifications and
contract.
Signed this 7th day of March, 2008.
Kenneth R. Wehner, PE
Designer
HV AC Engineer of Record
Title
State of North Carolina, County of ~UJ~~=7-:~~=t_.:::..__----
Subscribed and sworn to before me this ''fll. day of I'Yiatt:h
Notary Public: C~/df,u...._:.
My Commission ExPireS: til QlO II
2001 .
I
1
I ,
I • I
J
I
I ,
I
••
•• I
.I
I
1
SECTION 324
CERTIFICATE OF COMPLIANCE
PROJECT: Gerrard Hall/Smith Hall Renovations
LOCATION: UNC-Chapel Hill
BUDGET CODE: N/A SC0#:000576702A SW#=0-'-'40=5=<--=-21-'----=00"'--__,0_,_4 _______ _
OWNER: UNC-Chapel Hill
TYPEOFCONTRACT:~S~in~g=le~P~r~im~e ______________________________________ _
DATE OF FINAL ACCEPTANCE: _.!.::!N~o~ve~m~be~r_1~4!J..•...!!:2~0~0~7 _______________ _
CONTRACTOR: H.M. Kern -General Contractor/Electrical-Bryant Durham Electric
I certify that the electrical portion of work on the above-referenced project has been
inspected in accordance with Chapter 133, Article 1, of the General Statutes, and that:
( 1 ) The inspections of the construction, repairs or installations have been
conducted with the degree of care and professional skill and judgment ordinarily exercised
by a member of my profession; and
(2) to the best of my knowledge, and in my professional opinion as an architect
or engineer, the contractor has fulfilled the obligations of such plans, specifications and
contract.
Signed this 1Oth day of March, 2008.
H. Daniel Robertson, Jr., PE
Designer
Electrical Engineer of Record
Title
State of North Carolina, County of __ t,M=---=-~-=-=---------
Subscribed and sworn to before me this /() 7.!:t day of /lnar<Jt
Notary Public: ~U/Ldi(J..L
My CommissionE~i\(ul'l t/f. c9t>ll ,
20/JB....
I
1
I ._
I • I
J
I
-1
I ,
I
••
•• I
.I
I
1
SECTION 324
CERTIFICATE OF COMPLIANCE
PROJECT: Gerrard Hall/Smith Hall Renovations
LOCATION: UNC-Chapel Hill
BUDGET CODE: N/A SC0#:000576702A SW#_,_04....._,0=5,_,-2,__1,_-0=0~-=04..!...,__ ______ _
OWNER: UNC-Chapel Hill
TYPEOFCONTRACT:~S~in~g~le~P~r~im~e~-------------------------------------
DA TE OF FINAL ACCEPTANCE: __ ,_,N=ov=e=m"'"-"b=e=r---'1,_4~2=0'-"'0-<-7 ____________ _
CONTRACTOR: H.M. Kern -General Contractor/Fire Protection-Sunland Fire Protection
I certify that the fire protection portion of work on the above-referenced project has
been inspected in accordance with Chapter 133, Article 1, of the General Statutes, and
that:
( 1 ) The inspections of the construction, repairs or installations have been
conducted with the degree of care and professional skill and judgment ordinarily exercised
by a member of my profession; and
(2) to the best of my knowledge, and in my professional opinion as an architect
or engineer, the contractor has fulfilled the obligations of such plans, specifications and
contract.
Signed this 7th day of March, 2008.
W. Michael Pollard, PE
Designer
Fire Protection Engineer of Record